• Tidak ada hasil yang ditemukan

PDF ini STUDI RESIKO PADA PELAKSANAAN PROYEK JALAN PERKERASAN LENTUR UNTUK MENINGKATKAN KINERJA MUTU (Studi Kasus Proyek Peningkatan Jalan Dan Jembatan Nasional Di Provinsi Sumatera Barat) | Yonson | 1 PB

N/A
N/A
Protected

Academic year: 2018

Membagikan "PDF ini STUDI RESIKO PADA PELAKSANAAN PROYEK JALAN PERKERASAN LENTUR UNTUK MENINGKATKAN KINERJA MUTU (Studi Kasus Proyek Peningkatan Jalan Dan Jembatan Nasional Di Provinsi Sumatera Barat) | Yonson | 1 PB"

Copied!
2
0
0

Teks penuh

(1)

STUDI RESIKO PADA PELAKSANAAN PROYEK JALAN

PERKERASAN LENTUR UNTUK MENINGKATKAN KINERJA MUTU (Studi Kasus Proyek Peningkatan Jalan Dan Jembatan Nasional Di Provinsi Sumatera Barat)

Lindon yonson1, Alizar Hasan2, M. Nursyaifi Yulius1 1

Progran Studi Teknik Sipil, Program Pascasarjana Universitas Bung Hatta

2

Progran Studi Teknik Sipil, Program Pascasarjana Universitas Andalas e-mail: lindonyonson18@gmail.com

ABSTRAK

Pada pelaksanaan pekerjaan jalan perkerasan lentur yang dikerjakan di provinsi sumatera barat ditemukan sebagian besar yang berhasil diselesaikan masih relatif rendah dilihat dari segi kualitas. Pekerjaan ini mencerminkan buruknya kinerja mutu secara teoritis. Banyak Faktor yang mempengaruhi kinerja mutu pelaksanaan pekerjaan jenis perkerasan lentur : Penelitian ini adalah berkaitan dengan pengelolaan faktor resiko yang melekat pada pelaksanaan suatu proyek seperti : Resiko Kapabilitas sumber daya manusia, resiko kepemimpinan dan komunikasi, resiko pengaruh desain dan perubahan desain, resiko perencanaan dan penjadwalan konstruksi, resiko material dan peralatan, resiko pelaksanaan dan resiko lingkungan luar.Tujuan penelitian ini adalah untuk mengetahui faktor-faktor apa saja yang secara signifikan berpengaruh terhadap kualitas dan mengetahui penyebab dari faktor tersebut khususnya untuk pelaksanaan pekerjaan perkerasan lentur di provinsi sumatera barat. Untuk mencapai penyeleseian tulisan ini pengumpulan data dilakukan melalui kajian literatur, kuisioner dan melibatkan 150 orang responden. Melalui analisa faktor ditemukan 6 faktor resiko yang secara signifikan berpengaruh terhadap kualitas pekerjaan lentur. Seperti resiko kapabilitas Sumber Daya Manusia, Resiko kepemimpinan dan komunikasi, Resiko desain dan perubahan desain, Resiko perencanaan dan penjadwalan konstruksi, Resiko material dan peralatan serta Resiko pelaksanaan dalam meningkatkan kinerja mutu.

(2)

ABSTRACT

In the implementation of flexible road pavement done in West Sumatera Province found that most of the successfully completed is still relatively low in terms of quality. This work reflects poor theoretical quality performance. Many factors that affect the quality performance of the work of this type of flexible pavement include: This study is related to the management of risk factors inherent in the implementation of a project such as: Risk Capability of human resources, leadership and communication risks, the risk of design influence and design changes, And construction scheduling, material and equipment risk, implementation risk and external environmental risk.The purpose of this study is to determine what factors are significantly affect the quality and know the cause of these factors, especially for the implementation of flexible pavement work in the province of west Sumatera. To reach the writing of this paper data collection is done through literature review, questionnaire and involving 150 respondents. Through factor analysis found 6 risk factors that significantly affect the quality of flexible Pavement. Causes of human resource capability risks, leadership and communication risks, design risks and design changes, planning and construction scheduling risks, material and equipment risks and implementation risks in improving quality performance.

Keywords: Risk Study, Flexible Pavement Work, Quality Performance

Referensi

Dokumen terkait

Kepala Sekolah beserta para guru di :SMP Negeri 1 Salatiga, SMP Kristen 2 Salatiga, SMP Negeri 5 Salatiga, SMP Pangudi Luhur Salatiga, SMP Negeri 7 Salatiga, serta SMP Kristen

Penelitian ini bertujuan untuk meningkatkan kualitas pembelajaran IPS materi Jual Beli pada siswa kelas III SD Negeri 03 Jebed Kabupaten Pemalang, yaitu dengan menerapkan

Dengan ketiga klien mampu mengubah perilaku tidak tegas menjadi perilaku asertif atau tegas, maka dapat disimpulkan bahwa perilaku siswa ti- perilaku siswa ti- dak tegas

Untuk mendapatkan pembagi bersama terbesar matriks polinomial, diperlukan matriks struktur kiri/kanan yang diperoleh dari bentuk Smith matriks polinomial1. Definisi

Pada saat penghentian pengakuan atas aset keuangan secara keseluruhan, maka selisih antara nilai tercatat dan jumlah dari (i) pembayaran yang diterima, termasuk aset baru

Sesuai hasil penelitian di Bandara Soekarno Hatta sampai dengan akhir tahun 2014 belum ada perusahaan yang benar-benar mempunyai layanan berstandar VIP Services yang

Penggunaan kulit kayu laban yang dimanfaatkan sebagai minuman teh yaitu pada bagian kulit kayu tua laban yaitu bagian pangkal kulit batang pohon laban sampai tengah kulit batang

Kemudian kriteria penilaian dari masing-masing siswa didistribusikan ke dalam tabel 4.3 untuk mendapatkan persentase kriteria penilaian tinggi, sedang dan rendah,