DAFTAR PUSTAKA
Affandi A. 1996. Farmer Water Right. Seminar Proceedings. Centre for
Development Dynamics, Padjadjaran University Bandung, Bandung.
Amien LI, Sugiharto B, Estiningtyas W, Ariyanto MA. 2000. Analisis Pasokan
Kebutuhan Air (Water Demand Supply) Regional (Pulau Utama)
Berdasarkan Proyeksi Kebutuhan Pangan dan Kebutuhan Lainnya. Badan
Penelitian dan Pengembangan Pertanian. Departemen Pertanian. Bogor.
Anbumozhi V, Yamaji R, Tabuchi T. 1998. Rice Crop Growth and Yield as
Influenced by Change in Ponding Water Depth. Water Regime and
Fertigation level. Agriculural Water Management. Soil and Water Sciences
Division International Rice Research Institute. Makati City. Philippines.
Badan Hidrologi. Puslitbang Teknologi Sumberdaya Air. 2000. Laporan Akhir.
Pemeruman Waduk Ir. H, Djuanda. Direktorat Sumberdaya Air.
Departemen Pekerjaan Umum. Jakarta.
Biro Pusat Statistik. 2001. Jawa Barat Dalam Angka. BPS Jakarta.
---. 2002. Jawa Barat Dalam Angka. BPS Jakarta.
---. 2003. Jawa Barat Dalam Angka. BPS Jakarta.
---. 2004. Jawa Barat Dalam Angka. BPS Jakarta.
Bloomquist W. 1992. Dividing the Waters : Governing Groundwater in Southern
California. ICS Press, San Fransisco.
Bouman BAM, Tuong TP. 2000. Field Water Management and Save Water and
Increase Its Productiviy in Irrigated Lowland Rice. Agricultural Water
Management 1615. Soil and Water Sciences Division International Rice
Research Institute. Makati City. Philippines.
Chiang AC. 1992. Elements of Dynamic Optimization. McGraw-Hill, Singapore.
Conrad JM. 1999. Resource Economics. Cambridge University Press.
Cambridge.
Conrad JM, Clark C. 1995. Natural Resources Economics. Note and Problems.
Cambridge University Press. Cambridge.
Dinar A, Rosegrant M, Meinzen Dick R. 1997. Water Allocation Mechanisms:
Principles and Examples. Policy Research Working Paper 1779. World
Bank. Washington D.C.
Directorate General of Water Resources. 2006. Main Report. Integrated Citarum
Water Resources Management Program (ICWRM). Ministry of Public
Works. Government of Republic Indonesia. Jakarta.
De Datta SK. 1981. Principles and Practices of Rice Production.IRRI. Philippines.
Los Banos.
De Wit CT. 1992. Resources Use Efficiency in Agriculture. Agriculture System.
Dinar A, Subrmanian A. 1997. Water Pricing Experience: An International
Perspective. World Bank Technical Paper No. 386. Washington D.C.
Doorenbos J, Kassam A H. 1979. Crop Yield vs Water. FAO Irrigation and
Drainage Paper No. 33. Food and Agriculture Organization of the United
Nations, Rome.
Doorenbos J, Pruitt WO. 1977. Crop Water Requirement. FAO Irrigation and
Drainage Paper No. 24. Food and Agriculture Organization of the United
Nations, Rome.
Fagi AM, Las I, Hasanuddin H. 1998. Strategi Penelitian dan Pengembangan
Lahan Sawah Irigasi. Rapat Kerja Badan Litbang Pertanian 1997,
Yogyakarta.
Falkenmark M. 2000. Competing fresh water and ecological services in River
Basin Perspektif:Water International 25(2). Colombo. Sri Lanka.
Fauzi, A. 2004. Ekonomi Sumber Daya Alam dan Lingkungan Teori dan Aplikasi.
PT Gramedia Pustaka Utama, Jakarta
Gilmore A , Magee T, Fulp T, Strzepek K. 2000. Multiobjective Optimization of the
Colorado River. University of Colorado. Boulder.
Hanley N, Shogren JF, White B. 1997. Environmental Economics in Theory and
Practice. Oxford University Press. UK.
Hartwick JM and Olewiler ND. 1998. The Economist of Natural Resources Use.
Addison-Wisley Educational Publishers Inc. Massachussets.
Howe CW, Schurmeier DR, Shaw WD Jr. 1986. Innovative Approaches to Water
Allocation: The Potential for Water Markets. Water Resources Research
22(4): 439-445.
Howitt RE. 1995. A Calibration Method for Agriculture Economic Production
Models. Journal Agricultural Economics, 46(2):147-159.
Irianto G, Kartiwa B. 2000. Analisis Potensi dan Ketersediaan Air Berbasis DAS
Berdasarkan Neraca Air DAS. Badan Penelitian dan Pengembangan
Pertanian, Departemen Pertanian, Bogor.
Irianto G, Amin I, Las I, Rachman R. 2001. Pengelolaan Air Berbasis Pulau untuk
Mengantisipasi Kelangkaan Air dan Mencapai Ketahanan Pangan. Badan
Penelitian dan Pengembangan Pertanian, Departemen Pertanian, Bogor.
201
Kartaatmadja S, Farhan A, Setiobudi D. 2000. Peningkatan Produktivitas
Tanaman dan Efisiensi Penggunaan Air melalui Manajemen dan Teknologi
Tata Guna Air dan Teknologi Budidaya. Badan Penelitian dan
Pengembangan Pertanian, Departemen Pertanian, Bogor.
Kennedy JOS. 1986. Dynamic Programming Applications to Agriculture and
Natural Resources. Elsevier Applied Science Publishers. London.
Kurnia G, Avianto TM, Bruns BR. 2000. Farmers, Factories and the Dynamics of
Water Allocations in West Java. IFPRI Intermediate Technology
Publications, Washington D.C.
Las I, Purba S, Sofyan A, Pujilestari N. 2000. Analisis Potensi Peningkatan
Indeks Pertanaman (IP) Berdasarkan Berbagai Kondisi Iklim. Badan
Penelitian dan Pengembangan Pertanian, Departemen Pertanian, Bogor.
McKinney DC, Cai X, Rosegrant MW, Ringler C, Scott CA. 1999. Modelling
Water Resources Management at the Basin Level : Review and Future
Directions. System-Wide Institute Water Management (SWIM) Paper No.6.
International Water Management Institute, Colombo.
Molden D, Amarasinghe U, Hussain I. 2001. Water for Rural Development.
Background Paper on Water for Rural Development. Prepared for the
World Bank. Working Paper 32. International Water Management Institute,
Colombo.
Molden D, Sakhtivadivel JR, Habib Z. 2001. Basin-Level Use and Productivity of
Water. Examples from South Asia. Research Report 49. International
Water Management Institute, Colombo.
Molden D. 2002. Meeting Water Needs for Food and Environmental Security.
Proceedings of the 8
thJIRCAS International Symposium. Tsukuba.
Musiake K, Oki T, Agata Y, Kanae S. 2002. Global Water Resources Assessment
and Future Projections. Proceedings of the 8
thJIRCAS International
Symposium. Tsukuba.
Optimal Solutions Ltd. 2000. Development of Resevoir Operating in Brantas
River Basin. Unpublished Report Submitted to Perum Jasa Tirta I, Malang,
East Java, Indonesia. 82pp.
Perry CJ, Narayanamurthy SG. 1998. Farmer Response to Rationed and
Uncertain Irrigations Supplies. Research Report No.24. International Water
Management Institute, Colombo.
Rabinge R. 1993. The Ecological Bacground in Food Production. In: Crop
Protection and Sistainable Agriculture. Ciba Foundation Simposium.
Wiley,Chichester.
Randall A. 1981. Resources Economics, An Economic Approach to Natural
Resources and Environmental Policy. Second Edition.John Willey and
Sons. New York.
Ringler C, Huy NV, Truong TV, Cong NC, Dung DD, Binh NT, Cai X and
Rosegrant M. 2002. Irigation Investment, Fiscal Policy, and Water
Resources Allocation in Indonesia and Vietnam. IFPRI Project No.
2635-000, RETA 5866. Asian Development Bank, Washington D.C.
Rodgers C, Zaafrano R. 2002. Water Allocation dan Pricing Strategies in Brantas
River Basin, East Java, Indonesia. Paper for the Conference on Irrigation
Water Policies : Micro and Macro Consideration Held in Agadir : Marocco
15-17 June 2002.
Rosegrant MW, Ringler C, McKinney DC, Cai X, Keller A, Donoso G. 2000.
Integrated Economic-Hydrolic Water Modeling at the Basin Scale : The
Maipo River Basin. Agricultural Economics Journal, 24(1) : 33-46.
Rosegrant MW, Praisner MS, Meijer S, Witcover J. 2001. Global Food
Productions to 2020: Emerging Trends and Alternative Futures.
International Food Policy Institute. Washington D.C
Rosegrant MW, Cai X, Cline S. 2002. Water and Food to 2025 : Policy Respons
to Threat of Scarcity. International Food Policy Research Institute,
Washington D.C.
Sanim B. 2003. Ekonomi Sumberdaya Air dan Manajemen Pengembangan
Sektor Air Bersih Bagi Kesejahteraan Publik. Orasi Ilmiah Guru Besar
Tetap Bidang Ilmu Ekonomi Sumberdaya dan Lingkungan. Fakultas
Pertanian, Institut Pertanian Bogor, Bogor.
Seckler D, Amarangsihe U, Molden D, de Solva R, Barker R. 1998. World Water
Demand and Supply, 1990 to 2025 : Scenarios and Issues. Research
Report 19. IWMI. Colombo.
Shiklomanov IA.1999. Electronic Data. Provide to Scenario Development Panel.
World Commission on Water for the 21
stCentury, Mimeo.
Spulberg N. Sabbaghi A. 1994. Economist of Water Resources. Kluwer
Academic Publishers, Norwell, Massachusetts.
Syaukat Y. 2000. Economics of Integrated Surface and Groundwater Use
Management in The Jakarta Region, Indonesia. Ph. D. Thesis. Faculty of
Graduate Studies, University of Guelph, Guelph.
Undang-undang Republik Indonesia Nomor 7 Tahun 2004 Tentang Sumberdaya
Air Beserta Penjelasannya. Penerbit Citra Umbara Bandung.
United Nations. 1997. Comprehensive Assesment of Fresh Water Resources of
the World. World Meteorological Organization. New York.
Vörösmarty CJ, Green P, Salisbury J, Lammers RB. 2000. Global Water
Resources: Vulnerability from Climate Cahnge and Population Growth.
Science 289. New York.
204
Lampiran 1. PETA DAERAH IRIGASI
205
Total
OT1 OT2 TN TH1 TH2 TH3 BG1 BG2 MG1 MG2 WIRCR1 WIRCR2 (ribu m3)
1 Okt.I 1.3940 8180.03 - 8180.03 2 Okt.II - 1.2540 7361.79 - 7361.79 3 Nop.I - - 0.9960 5317.37 - 5317.37 4 Nop.II - - - 0.7660 4090.01 - 4090.01 5 Des.I - - - - 0.6900 3680.90 - 3680.90 6 Des.II - - - - 0.6900 3680.90 - 3680.90 7 Jan.I - - - - 0.6900 3680.90 - 3680.90 8 Jan.II - - - - 0.6130 3272.36 - 3272.36 9 Peb.I - - - - 0.4600 2454.13 - 2454.13 10 Peb.II - - - - 0.0001 0.59 - 0.59 11 Mar.I 1.3940 - 5205.37 5205.37 12 Mar.II - 1.2540 - 5205.37 5205.37 13 Apr.I - - 0.9960 - 4652.81 4652.81 14 Apr.II - - - 0.7660 - 4908.25 4908.25 15 Mei.I - - - - 0.6900 - 5205.37 5205.37 16 Mei.II - - - - - 0.6900 - 5949.22 5949.22 17 Jun.I - - - - - 0.6130 - 6321.14 6321.14 18 Jun.II - - - - - 0.4600 - 5577.29 5577.29 19 Jul.I - - - - - 0.0001 - 0.53 0.53 20 Jul.II - - - - - -21 Ags.I - - - - - -22 Ags.II - - - - -23 Sep.I - - - -24 Sep.II PERIODE
NO Alokasi Air ke Petak Sawah per Tahap Pertumbuhan per hektar (ribu m
3
) Total per MT(ribu m3)
Lampiran 2. Alokasi Air Optimum ke Petak Sawah dan Total Air ke Sektor Pertanian menurut Golongan Sawah, Tahap Pertumbuhan,
Musim Tanam dan Model Dasar di Wilayah Curug
206
Total
OT1 OT2 TN TH1 TH2 TH3 BG1 BG2 MG1 MG2 WIRBTA1 WIRBTA2 (ribu m3)
1Okt.I 1.5330 981.40 - 981.40 2Okt.II - 1.3800 883.23 - 883.23 3Nop.I - - 0.9960 637.95 - 637.95 4Nop.II - - - 0.7660 490.70 - 490.70 5Des.I - - - - 0.6900 441.62 - 441.62 6Des.II - - - - 0.6900 441.62 - 441.62 7Jan.I - - - - 0.6900 441.62 - 441.62 8Jan.II - - - - 0.6130 392.60 - 392.60 9Peb.I - - - - 0.4600 294.43 - 294.43 10Peb.II - - - - 0.0001 0.07 - 0.07 11Mar.I 0.9750 - - - - - 624.52 624.52 12Mar.II - 0.9750 - - - - 624.52 624.52 13Apr.I - - 0.8720 - - - 558.22 558.22 14Apr.II - - - 0.9200 - - 588.87 588.87 15Mei.I - - - - 0.9750 - - 624.52 624.52 16Mei.II - - - - - 1.1150 - 713.76 713.76 17Jun.I - - - - - 1.1850 - 758.38 758.38 18Jun.II - - - - - 1.0450 - 669.14 669.14 19Jul.I - - - - - 0.0001 - 0.06 0.06 20Jul.II - - - - - - -21Ags.I - - - - - -22Ags.II - - - - -23Sep.I - - - -24Sep.II - - -PERIODE
NO Alokasi Air ke Petak Sawah per Tahap Pertumbuhan per hektar (ribu m
3
) Total per MT(ribu m3
)
Lampiran 3. Alokasi Air Optimum ke Petak Sawah dan Total Air ke Sektor Pertanian menurut Golongan Sawah, Tahap Pertumbuhan,
Musim Tanam dan Model Dasar di Wilayah Cibeet A
207
TotalOT1 OT2 TN TH1 TH2 TH3 BG1 BG2 MG1 MG2 WIRBTB1 WIRBTB2 (ribu m3)
1 Okt.I 1.5330 8566.72 - 8566.72 2 Okt.II 1.5330 1.3800 16797.07 - 16797.07 3 Nop.I 1.3940 1.2540 0.9960 23511.06 - 23511.06 4 Nop.II 1.3940 1.2540 0.9960 0.7660 28844.89 - 28844.89 5 Des.I 1.5330 1.3800 0.9960 0.7660 0.6900 29298.82 - 29298.82 6 Des.II 1.3800 0.9960 0.7660 0.6900 0.6900 24153.13 - 24153.13 7 Jan.I 0.9960 0.7660 0.6900 0.6900 0.6900 20986.95 - 20986.95 8 Jan.II 0.7660 0.6900 0.6900 0.6900 0.6130 19410.71 - 19410.71 9 Peb.I 0.6900 0.6900 0.6900 0.6130 0.4600 17885.83 - 17885.83 10 Peb.II 0.6900 0.6900 0.6130 0.4600 0.0001 13830.06 - 13830.06 11 Mar.I 0.9750 0.6900 0.6130 0.4600 0.0001 9442.33 5451.44 14893.76 12 Mar.II 0.9750 0.9750 0.6130 0.4600 0.0001 4748.98 11234.13 15983.10 13 Apr.I 0.9750 0.9750 0.8360 0.4600 0.0001 1285.16 17810.78 19095.94 14 Apr.II 0.9750 0.9750 0.8360 0.8360 - 0.0001 0.31 23423.45 23423.76 15 Mei.I - 0.9750 0.8710 0.8360 - 0.9750 - 23415.64 23415.64 16 Mei.II - 0.8540 0.9200 - 0.9750 1.1150 - 24583.42 24583.42 17 Jun.I - 0.8360 - 0.9750 1.1150 1.1850 - 26103.15 26103.15 18 Jun.II - - 0.9750 1.1150 1.1850 1.0450 - 27707.76 27707.76 19 Jul.I - 1.1150 1.1850 1.0450 0.0001 - 22486.61 22486.61 20 Jul.II - 1.1850 1.0450 0.0001 - 15699.75 15699.75 21 Ags.I - 1.0450 0.0001 - 6899.21 6899.21 22 Ags.II - 0.0001 - 0.66 0.66 23 Sep.I - - - -24 Sep.II - - -PERIODE
NO Alokasi Air ke Petak Sawah per Tahap Pertumbuhan per hektar (ribu m 3
208
Total
OT1 OT2 TN TH1 TH2 TH3 BG1 BG2 MG1 MG2 WIRCKA1 WIRCKA2 (ribu m3)
1 Okt.I - - - -2 Okt.II - - - - -3 Nop.I 1.3940 - - 7285.73 - 7285.73 4 Nop.II 1.3940 1.2540 - - 13547.15 - 13547.15 5 Des.I 1.5330 1.3800 0.9960 - - 17158.85 - 17158.85 6 Des.II 1.3800 0.9960 0.7660 - - 13531.55 - 13531.55 7 Jan.I 0.9960 0.7660 0.6900 - - 10720.08 - 10720.08 8 Jan.II 0.7660 0.6900 0.6900 - - 9580.92 - 9580.92 9 Peb.I 0.6900 0.6900 0.6900 - - 9329.40 - 9329.40 10 Peb.II 0.6900 0.6900 0.6130 - - 8929.14 - 8929.14 11 Mar.I - 0.6900 0.6130 0.4600 - 7743.46 - 7743.46 12 Mar.II - - 0.6130 0.4600 0.0001 4319.32 - 4319.32 13 Apr.I 0.9750 - - 0.4600 0.0001 1509.36 - 1509.36 14 Apr.II 0.9750 0.9750 - - 0.0001 0.36 5099.91 5100.27 15 Mei.I - 0.9750 0.8710 - - - 6483.72 6483.72 16 Mei.II - 0.8540 0.9200 - - - - 5938.54 5938.54 17 Jun.I - 0.8360 0.9750 - - - - 6019.94 6019.94 18 Jun.II - 0.9750 - 1.1150 - - - 6286.11 6286.11 19 Jul.I - - 1.1150 1.1850 - - - 7212.50 7212.50 20 Jul.II - - 1.1850 1.0450 - - 7774.64 7774.64 21 Ags.I - 1.0450 0.0001 - 7144.73 7144.73 22 Ags.II - 0.0001 - 1483.21 1483.21 23 Sep.I - - 0.14 0.14 24 Sep.II - - -PERIODE
NO Alokasi Air ke Petak Sawah per Tahap Pertumbuhan per hektar (ribu m
3
) Total per MT(ribu m3)
Lampiran 5. Alokasi Air Optimum ke Petak Sawah dan Total Air ke Sektor Pertanian menurut Golongan Sawah, Tahap Pertumbuhan,
Musim Tanam dan Model Dasar di Wilayah Cikarang A
209
Total
OT1 OT2 TN TH1 TH2 TH3 BG1 BG2 MG1 MG2 WIRCKB1 WIRCKB2 (ribu m3)
1 Okt.I 1.5330 9108.51 - 9108.51 2 Okt.II - 1.3800 8197.40 - 8197.40 3 Nop.I 1.5330 - 0.9960 16416.86 - 16416.86 4 Nop.II 1.5330 1.3800 - 0.7660 18013.82 - 18013.82 5 Des.I - 1.3800 0.9960 - 0.6900 14533.57 - 14533.57 6 Des.II - 0.9960 0.7660 - 0.6900 11955.63 - 11955.63 7 Jan.I - 0.7660 0.6900 - 0.6900 10828.48 - 10828.48 8 Jan.II - 0.6900 0.6900 - 0.6130 10172.85 - 10172.85 9 Peb.I - 0.6900 0.6900 - 0.4600 9261.73 - 9261.73 10 Peb.II - 0.6900 0.6130 - 0.0001 6005.51 - 6005.51 11 Mar.I 0.9750 - 0.6130 0.4600 - 4754.51 6375.83 11130.34 12 Mar.II - 0.9750 - 0.4600 0.0001 1204.87 6375.83 7580.70 13 Apr.I 0.9750 - 0.8720 - 0.0001 0.29 9554.21 9554.50 14 Apr.II - 0.9750 - 0.9200 - - 9073.88 9073.88 15 Mei.I - - 0.8720 - 0.9750 - 9301.17 9301.17 16 Mei.II - - 0.9200 - - 1.1150 - 10129.45 10129.45 17 Jun.I - - 0.9750 - - 1.1850 - 11127.47 11127.47 18 Jun.II - - - 1.1150 - 1.0450 - 10883.49 10883.49 19 Jul.I - - - 1.1850 - 0.0001 - 4965.88 4965.88 20 Jul.II - - - 1.0450 - - 4380.99 4380.99 21 Ags.I - - 0.0001 - 0.42 0.42 22 Ags.II - - - - -23 Sep.I - - - -24 Sep.II - - -PERIODE
NO Alokasi Air ke Petak Sawah per Tahap Pertumbuhan per hektar (ribu m
210
TotalOT1 OT2 TN TH1 TH2 TH3 BG1 BG2 MG1 MG2 WIRBKA1 WIRBKA2 (ribu m3)
1 Okt.I 1.5330 395.19 - 395.19 2 Okt.II - 1.3800 355.66 - 355.66 3 Nop.I 1.5330 - 0.9960 2198.85 - 2198.85 4 Nop.II 1.5330 1.3800 - 0.7660 10718.12 - 10718.12 5 Des.I 1.5330 1.3800 0.9960 - 0.6900 11043.71 - 11043.71 6 Des.II 1.3800 0.9960 0.7660 - 0.6900 8388.89 - 8388.89 7 Jan.I 0.9960 0.7660 0.6900 - 0.6900 6548.52 - 6548.52 8 Jan.II 0.7660 0.6900 0.6900 - 0.6130 5833.71 - 5833.71 9 Peb.I 0.6900 0.6900 0.6900 - 0.4600 5708.74 - 5708.74 10 Peb.II 0.6900 0.6900 0.6130 - 0.0001 5493.22 - 5493.22 11 Mar.I 0.9750 0.6900 0.6130 0.4600 - 4860.81 251.48 5112.29 12 Mar.II - 0.9750 0.6130 0.4600 0.0001 3315.48 251.48 3566.96 13 Apr.I - - 0.8360 0.4600 0.0001 513.13 224.79 737.91 14 Apr.II - - - 0.8360 0.0001 0.12 237.13 237.25 15 Mei.I - - - - 0.9750 - - 251.48 251.48 16 Mei.II - - - - - 1.1150 - 287.42 287.42 17 Jun.I - - - - - 1.1850 - 305.39 305.39 18 Jun.II - - - - - 1.0450 - 269.45 269.45 19 Jul.I - - - - - 0.0001 - 0.03 0.03 20 Jul.II - - - - - - -21 Ags.I - - - - - -22 Ags.II - - - - -23 Sep.I - - - - -24 Sep.II - - - -PERIODE
NO Alokasi Air ke Petak Sawah per Tahap Pertumbuhan per hektar (ribu m 3
) Total per MT(ribu m3)
Lampiran 7. Alokasi Air Optimum ke Petak Sawah dan Total Air ke Sektor Pertanian menurut Golongan Sawah, Tahap Pertumbuhan,
Musim Tanam dan Model Dasar di Wilayah Bekasi A
Lampiran 8. Alokasi Air Optimum ke Sektor Domestik di Wilayah Curug
Berdasarkan Model Dasar dan Skenario 1 sampai dengan 7
1 2 3 4 5 6 7 1 Okt.I 35.24 38.76 38.76 35.24 35.24 35.24 38.76 38.76 2 Okt.II 35.24 38.76 38.76 35.24 35.24 35.24 38.76 38.76 3 Nop.I 35.24 38.76 38.76 35.24 35.24 35.24 38.76 38.76 4 Nop.II 35.24 38.76 38.76 35.24 35.24 35.24 38.76 38.76 5 Des.I 35.24 38.76 38.76 35.24 35.24 35.24 38.76 38.76 6 Des.II 35.24 38.76 38.76 35.24 35.24 35.24 38.76 38.76 7 Jan.I 35.24 38.76 38.76 35.24 35.24 35.24 38.76 38.76 8 Jan.II 35.24 38.76 38.76 35.24 35.24 35.24 38.76 38.76 9 Peb.I 35.24 38.76 38.76 35.24 35.24 35.24 38.76 38.76 10 Peb.II 35.24 38.76 38.76 35.24 35.24 35.24 38.76 38.76 11 Mar.I 35.24 38.76 38.76 35.24 35.24 35.24 38.76 38.76 12 Mar.II 35.24 38.76 38.76 35.24 35.24 35.24 38.76 38.76 13 Apr.I 35.24 38.76 38.76 35.24 35.24 35.24 38.76 38.76 14 Apr.II 35.24 38.76 38.76 35.24 35.24 35.24 38.76 38.76 15 Mei.I 35.24 38.76 38.76 35.24 35.24 35.24 38.76 38.76 16 Mei.II 35.24 38.76 38.76 35.24 35.24 35.24 38.76 38.76 17 Jun.I 35.24 38.76 38.76 35.24 35.24 35.24 38.76 38.76 18 Jun.II 35.24 38.76 38.76 35.24 35.24 35.24 38.76 38.76 19 Jul.I 35.24 38.76 38.76 35.24 35.24 35.24 38.76 38.76 20 Jul.II 35.24 38.76 38.76 35.24 35.24 35.24 38.76 38.76 21 Ags.I 35.24 38.76 38.76 35.24 35.24 35.24 38.76 38.76 22 Ags.II 35.24 38.76 38.76 35.24 35.24 35.24 38.76 38.76 23 Sep.I 35.24 38.76 38.76 35.24 35.24 35.24 38.76 38.76 24 Sep.II 41.58 38.76 45.74 35.24 35.24 35.24 38.76 45.74 NO PERIODE VOLUME (ribu m3) DASAR SKENARIO
Lampiran
9.
Alokasi Air Optimum ke Sektor Industri di Wilayah Curug
Berdasarkan Model Dasar dan Skenario 1 sampai dengan 7
1 2 3 4 5 6 7 1 Okt.I 781.82 781.82 820.91 781.82 781.82 781.82 820.91 820.91 2 Okt.II 781.82 781.82 820.91 781.82 781.82 781.82 820.91 820.91 3 Nop.I 781.82 781.82 820.91 781.82 781.82 781.82 820.91 820.91 4 Nop.II 781.82 781.82 820.91 781.82 781.82 781.82 820.91 820.91 5 Des.I 781.82 781.82 820.91 781.82 781.82 781.82 820.91 820.91 6 Des.II 781.82 781.82 820.91 781.82 781.82 781.82 820.91 820.91 7 Jan.I 781.82 781.82 820.91 781.82 781.82 781.82 820.91 820.91 8 Jan.II 781.82 781.82 820.91 781.82 781.82 781.82 820.91 820.91 9 Peb.I 781.82 781.82 820.91 781.82 781.82 781.82 820.91 820.91 10 Peb.II 781.82 781.82 820.91 781.82 781.82 781.82 820.91 820.91 11 Mar.I 781.82 781.82 820.91 781.82 781.82 781.82 820.91 820.91 12 Mar.II 781.82 781.82 820.91 781.82 781.82 781.82 820.91 820.91 13 Apr.I 781.82 781.82 820.91 781.82 781.82 781.82 820.91 820.91 14 Apr.II 781.82 781.82 820.91 781.82 781.82 781.82 820.91 820.91 15 Mei.I 781.82 781.82 820.91 781.82 781.82 781.82 820.91 820.91 16 Mei.II 781.82 781.82 820.91 781.82 781.82 781.82 820.91 820.91 17 Jun.I 781.82 781.82 820.91 781.82 781.82 781.82 820.91 820.91 18 Jun.II 781.82 781.82 820.91 781.82 781.82 781.82 820.91 820.91 19 Jul.I 781.82 781.82 820.91 781.82 781.82 781.82 820.91 820.91 20 Jul.II 781.82 781.82 820.91 781.82 781.82 781.82 820.91 820.91 21 Ags.I 781.82 781.82 820.91 781.82 781.82 781.82 820.91 820.91 22 Ags.II 781.82 781.82 820.91 781.82 781.82 781.82 820.91 820.91 23 Sep.I 781.82 781.82 820.91 781.82 781.82 781.82 820.91 820.91 24 Sep.II 781.82 781.82 820.91 781.82 781.82 781.82 820.91 820.91 NO PERIODE
TOTAL ALOKASI AIR INDUSTRI (ribu m3)
212
Lampiran 10. Alokasi Air Optimum ke Sektor Industri di Wilayah Cibeet A
Berdasarkan Model Dasar dan Skenario 1 sampai dengan 7
1 2 3 4 5 6 7 1 Okt.I 40.70 40.70 42.74 40.70 40.70 40.70 42.74 42.74 2 Okt.II 40.70 40.70 42.74 40.70 40.70 40.70 42.74 42.74 3 Nop.I 40.70 40.70 42.74 40.70 40.70 40.70 42.74 42.74 4 Nop.II 40.70 40.70 42.74 40.70 40.70 40.70 42.74 42.74 5 Des.I 40.70 40.70 42.74 40.70 40.70 40.70 42.74 42.74 6 Des.II 40.70 40.70 42.74 40.70 40.70 40.70 42.74 42.74 7 Jan.I 40.70 40.70 42.74 40.70 40.70 40.70 42.74 42.74 8 Jan.II 40.70 40.70 42.74 40.70 40.70 40.70 42.74 42.74 9 Peb.I 40.70 40.70 42.74 40.70 40.70 40.70 42.74 42.74 10 Peb.II 40.70 40.70 42.74 40.70 40.70 40.70 42.74 42.74 11 Mar.I 40.70 40.70 42.74 40.70 40.70 40.70 42.74 42.74 12 Mar.II 40.70 40.70 42.74 40.70 40.70 40.70 42.74 42.74 13 Apr.I 40.70 40.70 42.74 40.70 40.70 40.70 42.74 42.74 14 Apr.II 40.70 40.70 42.74 40.70 40.70 40.70 42.74 42.74 15 Mei.I 40.70 40.70 42.74 40.70 40.70 40.70 42.74 42.74 16 Mei.II 40.70 40.70 42.74 40.70 40.70 40.70 42.74 42.74 17 Jun.I 40.70 40.70 42.74 40.70 40.70 40.70 42.74 42.74 18 Jun.II 40.70 40.70 42.74 40.70 40.70 40.70 42.74 42.74 19 Jul.I 40.70 40.70 42.74 40.70 40.70 40.70 42.74 42.74 20 Jul.II 40.70 40.70 42.74 40.70 40.70 40.70 42.74 42.74 21 Ags.I 40.70 40.70 42.74 40.70 40.70 40.70 42.74 42.74 22 Ags.II 40.70 40.70 42.74 40.70 40.70 40.70 42.74 42.74 23 Sep.I 40.70 40.70 42.74 40.70 40.70 40.70 42.74 42.74 24 Sep.II 40.70 40.70 42.74 40.70 40.70 40.70 42.74 42.74 SKENARIO NO PERIODE VOLUME (ribu m3) DASAR
Lampiran 11. Alokasi Air Optimum ke Sektor Domestik di Wilayah Cibeet B
Berdasarkan Model Dasar dan Skenario 1 sampai dengan 7
1 2 3 4 5 6 7 1 Okt.I 254.10 279.51 279.51 254.10 254.10 254.10 279.51 279.51 2 Okt.II 254.10 279.51 279.51 254.10 254.10 254.10 279.51 279.51 3 Nop.I 254.10 279.51 279.51 254.10 254.10 254.10 279.51 279.51 4 Nop.II 254.10 279.51 279.51 254.10 254.10 254.10 279.51 279.51 5 Des.I 254.10 279.51 279.51 254.10 254.10 254.10 279.51 279.51 6 Des.II 254.10 279.51 279.51 254.10 254.10 254.10 279.51 279.51 7 Jan.I 254.10 279.51 279.51 254.10 254.10 254.10 279.51 279.51 8 Jan.II 254.10 279.51 279.51 254.10 254.10 254.10 279.51 279.51 9 Peb.I 254.10 279.51 279.51 254.10 254.10 254.10 279.51 279.51 10 Peb.II 254.10 279.51 279.51 254.10 254.10 254.10 219.54 279.51 11 Mar.I 254.10 279.51 279.51 254.10 254.10 254.10 279.51 279.51 12 Mar.II 254.10 279.51 279.51 254.10 254.10 254.10 279.51 279.51 13 Apr.I 254.10 279.51 279.51 254.10 254.10 254.10 279.51 279.51 14 Apr.II 254.10 279.51 279.51 254.10 254.10 254.10 279.51 279.51 15 Mei.I 254.10 279.51 279.51 254.10 254.10 254.10 279.51 279.51 16 Mei.II 254.10 279.51 279.51 254.10 254.10 254.10 279.51 279.51 17 Jun.I 254.10 279.51 279.51 254.10 254.10 254.10 279.51 279.51 18 Jun.II 254.10 279.51 279.51 254.10 254.10 254.10 279.51 279.51 19 Jul.I 254.10 279.51 279.51 254.10 254.10 254.10 279.51 279.51 20 Jul.II 254.10 279.51 279.51 254.10 254.10 254.10 279.51 279.51 21 Ags.I 254.10 279.51 279.51 254.10 254.10 254.10 279.51 279.51 22 Ags.II 254.10 279.51 279.51 254.10 254.10 254.10 279.51 279.51 23 Sep.I 254.10 279.51 279.51 254.10 254.10 254.10 219.54 279.51 24 Sep.II 254.10 279.51 279.51 254.10 254.10 254.10 279.51 279.51 SKENARIO DASAR NO PERIODE VOLUME (ribu m3)
Lampiran 12. Alokasi Air Optimum ke Sektor Industri di Wilayah Cibeet B
Berdasarkan Model Dasar dan Skenario 1 sampai dengan 7
1 2 3 4 5 6 7 1 Okt.I 675.68 675.68 709.46 675.68 675.68 675.68 709.46 709.46 2 Okt.II 675.68 675.68 709.46 675.68 675.68 675.68 709.46 709.46 3 Nop.I 675.68 675.68 709.46 675.68 675.68 675.68 709.46 709.46 4 Nop.II 675.68 675.68 709.46 675.68 675.68 675.68 709.46 709.46 5 Des.I 675.68 675.68 709.46 675.68 675.68 675.68 709.46 709.46 6 Des.II 675.68 675.68 709.46 675.68 675.68 675.68 709.46 709.46 7 Jan.I 675.68 675.68 709.46 675.68 675.68 675.68 709.46 709.46 8 Jan.II 675.68 675.68 709.46 675.68 675.68 675.68 709.46 709.46 9 Peb.I 675.68 675.68 709.46 675.68 675.68 675.68 709.46 709.46 10 Peb.II 675.68 675.68 709.46 675.68 675.68 675.68 709.46 709.46 11 Mar.I 675.68 675.68 709.46 675.68 675.68 675.68 709.46 709.46 12 Mar.II 675.68 675.68 709.46 675.68 675.68 675.68 709.46 709.46 13 Apr.I 675.68 675.68 709.46 675.68 675.68 675.68 709.46 709.46 14 Apr.II 675.68 675.68 709.46 675.68 675.68 675.68 709.46 709.46 15 Mei.I 675.68 675.68 709.46 675.68 675.68 675.68 709.46 709.46 16 Mei.II 675.68 675.68 709.46 675.68 675.68 675.68 709.46 709.46 17 Jun.I 675.68 675.68 709.46 675.68 675.68 675.68 709.46 709.46 18 Jun.II 675.68 675.68 709.46 675.68 675.68 675.68 709.46 709.46 19 Jul.I 675.68 675.68 709.46 675.68 675.68 675.68 709.46 709.46 20 Jul.II 675.68 675.68 709.46 675.68 675.68 675.68 709.46 709.46 21 Ags.I 675.68 675.68 709.46 675.68 675.68 675.68 709.46 709.46 22 Ags.II 675.68 675.68 709.46 675.68 675.68 675.68 709.46 709.46 23 Sep.I 675.68 675.68 709.46 675.68 675.68 675.68 709.46 709.46 24 Sep.II 675.68 675.68 709.46 675.68 675.68 675.68 709.46 709.46 SKENARIO NO PERIODE VOLUME (ribu m3) DASAR
Lampiran 13. Alokasi Air Optimum ke Sektor Domestik di Wilayah Cikarang A
Berdasarkan Model Dasar dan Skenario 1 sampai dengan 7
1 2 3 4 5 6 7 1 Okt.I 5.78 6.35 6.35 5.78 5.78 5.78 6.35 6.35 2 Okt.II 5.78 6.35 6.35 5.78 5.78 5.78 6.35 6.35 3 Nop.I 5.78 6.35 6.35 5.78 5.78 5.78 6.35 6.35 4 Nop.II 5.78 6.35 6.35 5.78 5.78 5.78 6.35 6.35 5 Des.I 5.78 6.35 6.35 5.78 5.78 5.78 6.35 6.35 6 Des.II 5.78 6.35 6.35 5.78 5.78 5.78 6.35 6.35 7 Jan.I 5.78 6.35 6.35 5.78 5.78 5.78 6.35 6.35 8 Jan.II 5.78 6.35 6.35 5.78 5.78 5.78 6.35 6.35 9 Peb.I 5.78 6.35 6.35 5.78 5.78 5.78 6.35 6.35 10 Peb.II 5.78 6.35 6.35 5.78 5.78 5.78 4.77 6.35 11 Mar.I 5.78 6.35 6.35 5.78 5.78 5.78 4.77 6.35 12 Mar.II 5.78 6.35 6.35 5.78 5.78 5.78 6.35 6.35 13 Apr.I 5.78 6.35 6.35 5.78 5.78 5.78 6.35 6.35 14 Apr.II 5.78 6.35 6.35 5.78 5.78 5.78 6.35 6.35 15 Mei.I 5.78 6.35 6.35 5.78 5.78 5.78 6.35 6.35 16 Mei.II 5.78 6.35 6.35 5.78 5.78 5.78 6.35 6.35 17 Jun.I 5.78 6.35 6.35 5.78 5.78 5.78 6.35 6.35 18 Jun.II 5.78 6.35 6.35 5.78 5.78 5.78 4.77 6.35 19 Jul.I 5.78 6.35 6.35 5.78 5.78 5.78 4.77 6.35 20 Jul.II 5.78 6.35 6.35 5.78 5.78 5.78 4.77 6.35 21 Ags.I 5.78 6.35 6.35 5.78 5.78 5.78 4.77 6.35 22 Ags.II 5.78 6.35 6.35 5.78 5.78 5.78 4.77 6.35 23 Sep.I 5.78 6.35 6.35 5.78 5.78 5.78 4.77 6.35 24 Sep.II 5.78 6.35 6.35 5.78 5.78 5.78 4.77 6.35 SKENARIO NO PERIODE VOLUME (ribu m3) DASAR
214
Lampiran 14. Alokasi Air Optimum ke Sektor Industri di Wilayah Cikarang A
Berdasarkan Model Dasar dan Skenario 1 sampai dengan 7
1 2 3 4 5 6 7 1 Okt.I 280.50 280.50 294.53 280.50 280.50 280.50 294.53 294.53 2 Okt.II 280.50 280.50 294.53 280.50 280.50 280.50 294.53 294.53 3 Nop.I 280.50 280.50 294.53 280.50 280.50 280.50 294.53 294.53 4 Nop.II 280.50 280.50 294.53 280.50 280.50 280.50 294.53 294.53 5 Des.I 280.50 280.50 294.53 280.50 280.50 280.50 294.53 294.53 6 Des.II 280.50 280.50 294.53 280.50 280.50 280.50 294.53 294.53 7 Jan.I 280.50 280.50 294.53 280.50 280.50 280.50 294.53 294.53 8 Jan.II 280.50 280.50 294.53 280.50 280.50 280.50 294.53 294.53 9 Peb.I 280.50 280.50 294.53 280.50 280.50 280.50 294.53 294.53 10 Peb.II 280.50 280.50 294.53 280.50 280.50 280.50 294.53 294.53 11 Mar.I 280.50 280.50 294.53 280.50 280.50 280.50 294.53 294.53 12 Mar.II 280.50 280.50 294.53 280.50 280.50 280.50 294.53 294.53 13 Apr.I 280.50 280.50 294.53 280.50 280.50 280.50 294.53 294.53 14 Apr.II 280.50 280.50 294.53 280.50 280.50 280.50 294.53 294.53 15 Mei.I 280.50 280.50 294.53 280.50 280.50 280.50 294.53 294.53 16 Mei.II 280.50 280.50 294.53 280.50 280.50 280.50 294.53 294.53 17 Jun.I 280.50 280.50 294.53 280.50 280.50 280.50 294.53 294.53 18 Jun.II 280.50 280.50 294.53 280.50 280.50 280.50 294.53 294.53 19 Jul.I 280.50 280.50 294.53 280.50 280.50 280.50 294.53 294.53 20 Jul.II 280.50 280.50 294.53 280.50 280.50 280.50 294.53 294.53 21 Ags.I 280.50 280.50 294.53 280.50 280.50 280.50 294.53 294.53 22 Ags.II 280.50 280.50 294.53 280.50 280.50 280.50 294.53 294.53 23 Sep.I 280.50 280.50 294.53 280.50 280.50 280.50 294.53 294.53 24 Sep.II 280.50 280.50 294.53 280.50 280.50 280.50 294.53 294.53 SKENARIO NO PERIODE VOLUME (ribu m3) DASAR
Lampiran 15. Alokasi Air Optimum ke Sektor Domestik di Wilayah Cikarang B
Berdasarkan Model Dasar dan Skenario 1 sampai dengan 7
1 2 3 4 5 6 7 1 Okt.I 681.45 749.60 749.60 681.45 681.45 681.45 732.01 749.60 2 Okt.II 681.45 749.60 749.60 681.45 681.45 681.45 732.01 749.60 3 Nop.I 681.45 749.60 749.60 681.45 681.45 681.45 732.01 749.60 4 Nop.II 681.45 749.60 749.60 681.45 681.45 681.45 732.01 749.60 5 Des.I 681.45 749.60 749.60 681.45 681.45 681.45 732.01 749.60 6 Des.II 681.45 749.60 749.60 681.45 681.45 681.45 732.01 749.60 7 Jan.I 681.45 749.60 749.60 681.45 681.45 681.45 732.01 749.60 8 Jan.II 681.45 749.60 749.60 681.45 681.45 681.45 732.01 749.60 9 Peb.I 681.45 749.60 749.60 681.45 681.45 681.45 732.01 749.60 10 Peb.II 681.45 749.60 749.60 681.45 681.45 681.45 707.11 749.60 11 Mar.I 681.45 749.60 749.60 681.45 681.45 681.45 732.01 749.60 12 Mar.II 681.45 749.60 749.60 681.45 681.45 681.45 707.11 749.60 13 Apr.I 681.45 749.60 749.60 681.45 681.45 681.45 707.11 749.60 14 Apr.II 681.45 749.60 749.60 681.45 681.45 681.45 749.60 749.60 15 Mei.I 681.45 749.60 749.60 681.45 681.45 681.45 732.01 749.60 16 Mei.II 681.45 749.60 749.60 681.45 681.45 681.45 732.01 749.60 17 Jun.I 681.45 749.60 749.60 681.45 681.45 681.45 732.01 749.60 18 Jun.II 642.83 707.11 707.11 642.83 642.83 642.83 707.11 707.11 19 Jul.I 681.45 749.60 749.60 681.45 681.45 681.45 732.01 749.60 20 Jul.II 681.45 749.60 749.60 681.45 681.45 681.45 732.01 749.60 21 Ags.I 681.45 749.60 749.60 681.45 681.45 681.45 732.01 749.60 22 Ags.II 681.45 749.60 749.60 681.45 681.45 681.45 707.11 707.11 23 Sep.I 681.45 749.60 749.60 681.45 681.45 681.45 732.01 732.47 24 Sep.II 681.45 749.60 749.60 681.45 681.45 681.45 732.01 749.60 SKENARIO NO PERIODE VOLUME (ribu m3) DASAR
Lampiran 16. Alokasi Air Optimum ke Sektor Industri di Wilayah Cikarang B
Berdasarkan Model Dasar dan Skenario 1 - 7
1 2 3 4 5 6 7 1 Okt.I 538.81 538.81 565.75 538.81 538.81 538.81 565.75 565.75 2 Okt.II 538.81 538.81 565.75 538.81 538.81 538.81 565.75 565.75 3 Nop.I 538.81 538.81 565.75 538.81 538.81 538.81 565.75 565.75 4 Nop.II 538.81 538.81 565.75 538.81 538.81 538.81 565.75 565.75 5 Des.I 538.81 538.81 565.75 538.81 538.81 538.81 565.75 565.75 6 Des.II 538.81 538.81 565.75 538.81 538.81 538.81 565.75 565.75 7 Jan.I 538.81 538.81 565.75 538.81 538.81 538.81 565.75 565.75 8 Jan.II 538.81 538.81 565.75 538.81 538.81 538.81 565.75 565.75 9 Peb.I 538.81 538.81 565.75 538.81 538.81 538.81 565.75 565.75 10 Peb.II 538.81 538.81 565.75 538.81 538.81 538.81 565.75 565.75 11 Mar.I 538.81 538.81 565.75 538.81 538.81 538.81 565.75 565.75 12 Mar.II 538.81 538.81 565.75 538.81 538.81 538.81 565.75 565.75 13 Apr.I 538.81 538.81 565.75 538.81 538.81 538.81 565.75 565.75 14 Apr.II 538.81 538.81 565.75 538.81 538.81 538.81 565.75 565.75 15 Mei.I 538.81 538.81 565.75 538.81 538.81 538.81 565.75 565.75 16 Mei.II 538.81 538.81 565.75 538.81 538.81 538.81 565.75 565.75 17 Jun.I 538.81 538.81 565.75 538.81 538.81 538.81 565.75 565.75 18 Jun.II 538.81 538.81 565.75 538.81 538.81 538.81 565.75 565.75 19 Jul.I 538.81 538.81 565.75 538.81 538.81 538.81 565.75 565.75 20 Jul.II 538.81 538.81 565.75 538.81 538.81 538.81 565.75 565.75 21 Ags.I 538.81 538.81 565.75 538.81 538.81 538.81 565.75 565.75 22 Ags.II 538.81 538.81 565.75 538.81 538.81 538.81 565.75 565.75 23 Sep.I 538.81 538.81 565.75 538.81 538.81 538.81 565.75 565.75 24 Sep.II 538.81 538.81 565.75 538.81 538.81 538.81 565.75 565.75 SKENARIO NO PERIODE VOLUME (ribu m3) DASAR
Lampiran 17. Alokasi Air Optimum ke Sektor Domestik di Wilayah Bekasi A
Berdasarkan Model Dasar dan Skenario 1 sampai dengan 7
1 2 3 4 5 6 7 1 Okt.I 446.99 491.68 491.68 446.99 446.99 446.99 491.68 491.68 2 Okt.II 446.99 491.68 491.68 446.99 446.99 446.99 491.68 491.68 3 Nop.I 446.99 491.68 491.68 446.99 446.99 446.99 491.68 491.68 4 Nop.II 446.99 491.68 491.68 446.99 446.99 446.99 491.68 491.68 5 Des.I 446.99 491.68 491.68 446.99 446.99 446.99 491.68 491.68 6 Des.II 446.99 491.68 491.68 446.99 446.99 446.99 491.68 491.68 7 Jan.I 446.99 491.68 491.68 446.99 446.99 446.99 491.68 491.68 8 Jan.II 446.99 491.68 491.68 446.99 446.99 446.99 466.53 491.68 9 Peb.I 446.99 491.68 491.68 446.99 446.99 446.99 466.53 491.68 10 Peb.II 446.99 491.68 491.68 446.99 446.99 446.99 466.53 491.68 11 Mar.I 446.99 491.68 491.68 446.99 446.99 446.99 466.53 491.68 12 Mar.II 446.99 491.68 491.68 446.99 446.99 446.99 459.99 491.68 13 Apr.I 446.99 491.68 491.68 446.99 446.99 446.99 459.99 491.68 14 Apr.II 446.99 491.68 491.68 446.99 446.99 446.99 459.99 491.68 15 Mei.I 446.99 491.68 491.68 446.99 446.99 446.99 491.68 491.68 16 Mei.II 446.99 491.68 491.68 446.99 446.99 446.99 491.68 491.68 17 Jun.I 446.99 491.68 491.68 446.99 446.99 446.99 485.14 491.68 18 Jun.II 418.17 459.99 459.99 418.17 418.17 418.17 459.99 459.99 19 Jul.I 446.99 491.68 491.68 446.99 446.99 446.99 459.99 491.68 20 Jul.II 446.99 491.68 491.68 446.99 446.99 446.99 485.14 491.68 21 Ags.I 446.99 491.68 491.68 446.99 446.99 446.99 459.99 491.68 22 Ags.II 446.99 491.68 491.68 446.99 446.99 446.99 459.99 459.99 23 Sep.I 446.99 491.68 491.68 446.99 446.99 446.99 459.99 485.14 24 Sep.II 446.99 491.68 491.68 446.99 446.99 446.99 485.14 491.68 SKENARIO NO PERIODE VOLUME (ribu m3) DASAR
216
Lampiran 18. Alokasi Air Optimum ke Sektor Industri di Wilayah Bekasi A
Berdasarkan Model Dasar dan Skenario 1 sampai dengan 7
1 2 3 4 5 6 7 1 Okt.I 123.20 123.20 129.36 123.20 123.20 123.20 129.36 129.36 2 Okt.II 123.20 123.20 129.36 123.20 123.20 123.20 129.36 129.36 3 Nop.I 123.20 123.20 129.36 123.20 123.20 123.20 129.36 129.36 4 Nop.II 123.20 123.20 129.36 123.20 123.20 123.20 129.36 129.36 5 Des.I 123.20 123.20 129.36 123.20 123.20 123.20 129.36 129.36 6 Des.II 123.20 123.20 129.36 123.20 123.20 123.20 129.36 129.36 7 Jan.I 123.20 123.20 129.36 123.20 123.20 123.20 129.36 129.36 8 Jan.II 123.20 123.20 129.36 123.20 123.20 123.20 129.36 129.36 9 Peb.I 123.20 123.20 129.36 123.20 123.20 123.20 129.36 129.36 10 Peb.II 123.20 123.20 129.36 123.20 123.20 123.20 129.36 129.36 11 Mar.I 123.20 123.20 129.36 123.20 123.20 123.20 129.36 129.36 12 Mar.II 123.20 123.20 129.36 123.20 123.20 123.20 129.36 129.36 13 Apr.I 123.20 123.20 129.36 123.20 123.20 123.20 129.36 129.36 14 Apr.II 123.20 123.20 129.36 123.20 123.20 123.20 129.36 129.36 15 Mei.I 123.20 123.20 129.36 123.20 123.20 123.20 129.36 129.36 16 Mei.II 123.20 123.20 129.36 123.20 123.20 123.20 129.36 129.36 17 Jun.I 123.20 123.20 129.36 123.20 123.20 123.20 129.36 129.36 18 Jun.II 123.20 123.20 129.36 123.20 123.20 123.20 129.36 129.36 19 Jul.I 123.20 123.20 129.36 123.20 123.20 123.20 129.36 129.36 20 Jul.II 123.20 123.20 129.36 123.20 123.20 123.20 129.36 129.36 21 Ags.I 123.20 123.20 129.36 123.20 123.20 123.20 129.36 129.36 22 Ags.II 123.20 123.20 129.36 123.20 123.20 123.20 129.36 129.36 23 Sep.I 123.20 123.20 129.36 123.20 123.20 123.20 129.36 129.36 24 Sep.II 123.20 123.20 129.36 123.20 123.20 123.20 129.36 129.36 SKENARIO NO PERIODE VOLUME (ribu m3) DASAR
Lampiran 19. Alokasi Air Optimum ke Sektor Domestik di Wilayah Bekasi B
Berdasarkan Model Dasar dan Skenario 1 sampai dengan 7
1 2 3 4 5 6 7 1 Okt.I 22944.08 25238.48 25238.48 22944.08 22944.08 22944.08 25238.48 25238.48 2 Okt.II 22944.08 25238.48 25238.48 22944.08 22944.08 22944.08 25238.48 25238.48 3 Nop.I 22944.08 25238.48 25238.48 22944.08 22944.08 22944.08 25238.48 25238.48 4 Nop.II 22944.08 25238.48 25238.48 22944.08 22944.08 22944.08 25238.48 25238.48 5 Des.I 22944.08 25238.48 25238.48 22944.08 22944.08 22944.08 25238.48 25238.48 6 Des.II 22944.08 25238.48 25238.48 22944.08 22944.08 22944.08 25238.48 25238.48 7 Jan.I 22944.08 25238.48 25238.48 22944.08 22944.08 22944.08 25238.48 25238.48 8 Jan.II 22944.08 25238.48 25238.48 22944.08 22944.08 22944.08 25238.48 25238.48 9 Peb.I 22944.08 24192.00 24192.00 22944.08 22944.08 22944.08 24192.00 24192.00 10 Peb.II 22944.08 24192.00 24192.00 22944.08 22944.08 22944.08 24192.00 24192.00 11 Mar.I 22944.08 25238.48 25238.48 22944.08 22944.08 22944.08 25238.48 25238.48 12 Mar.II 22944.08 25238.48 25238.48 22944.08 22944.08 22944.08 25238.48 25238.48 13 Apr.I 22944.08 25238.48 25238.48 22944.08 22944.08 22944.08 25227.30 25238.48 14 Apr.II 22944.08 25238.48 25238.48 22944.08 22944.08 22944.08 25238.48 25238.48 15 Mei.I 22944.08 25238.48 25238.48 22944.08 22944.08 22944.08 25238.48 25238.48 16 Mei.II 22944.08 25238.48 25238.48 22944.08 22944.08 22944.08 25238.48 25238.48 17 Jun.I 22944.08 25238.48 25238.48 22944.08 22944.08 22944.08 25227.30 25238.48 18 Jun.II 21169.98 23286.98 23286.98 21169.98 21169.98 21169.98 23286.98 23286.98 19 Jul.I 22944.08 25238.48 25238.48 22944.08 22944.08 22944.08 25227.30 25238.48 20 Jul.II 22944.08 25238.48 25238.48 22944.08 22944.08 22944.08 25227.30 25238.48 21 Ags.I 22944.08 25238.48 25238.48 22944.08 22944.08 22944.08 25227.30 25238.48 22 Ags.II 22944.08 25238.48 25238.48 22944.08 22944.08 22944.08 25227.30 24187.30 23 Sep.I 22944.08 25238.48 25238.48 22944.08 22944.08 22944.08 25227.30 25238.48 24 Sep.II 22944.08 25238.48 25238.48 22944.08 22944.08 22944.08 25227.30 25238.48 SKENARIO NO PERIODE VOLUME (ribu m3) DASAR
217
I II I II I II I II I II I II I II I II 1 Okt.I 8180.03 8180.03 8180.03 8180.03 8180.03 8180.03 8180.03 8180.03 2 Okt.II 7361.79 7361.79 7361.79 7361.79 7361.79 7361.79 7361.79 7361.79 3 Nop.I 5317.37 5317.37 5317.37 5317.37 5317.37 5317.37 5317.37 5317.37 4 Nop.II 4090.01 4090.01 4090.01 4090.01 4090.01 4090.01 4090.01 4090.01 5 Des.I 3680.90 3680.90 3680.90 3680.90 3680.90 3680.90 3680.90 3680.90 6 Des.II 3680.90 3680.90 3680.90 3680.90 3680.90 3680.90 3680.90 3680.90 7 Jan.I 3680.90 3680.90 3680.90 3680.90 3680.90 3680.90 3680.90 3680.90 8 Jan.II 3272.36 3272.36 3272.36 3272.36 3272.36 3272.36 3272.36 3272.36 9 Peb.I 2454.13 2454.13 2454.13 2454.13 2454.13 2454.13 2454.13 2454.13 10 Peb.II 0.59 0.59 0.59 0.59 0.59 0.59 0.59 0.59 11 Mar.I 5205.37 5205.37 5205.37 5205.37 5205.37 5205.37 5205.37 5205.37 12 Mar.II 5205.37 5205.37 5205.37 5205.37 5205.37 5205.37 5205.37 5205.37 13 Apr.I 4652.81 4652.81 4652.81 4652.81 4652.81 4652.81 4652.81 4652.81 14 Apr.II 4908.25 4908.25 4908.25 4908.25 4908.25 4908.25 4908.25 4908.25 15 Mei.I 5205.37 5205.37 5205.37 5205.37 5205.37 5205.37 5205.37 5205.37 16 Mei.II 5949.22 5949.22 5949.22 5949.22 5949.22 5949.22 5949.22 5949.22 17 Jun.I 6321.14 6321.14 6321.14 6321.14 6321.14 6321.14 6321.14 6321.14 18 Jun.II 5577.29 5577.29 5577.29 5577.29 5577.29 5577.29 5577.29 5577.29 19 Jul.I 0.53 0.53 0.53 0.53 0.53 0.53 0.53 0.53 20 Jul.II 21 Ags.I 22 Ags.II 23 Sep.I 24 Sep.II Keterangan :I : Musim Tanam I II : Musim Tanam II
NO DASAR SKENARIO 7
Total Alokasi Air Irigasi Optimum (ribu m3)
218
MT I MT II MT I MT II MT I MT II MT I MT II MT I MT II MT I MT II MT I MT II MT I MT II 1 Okt.I 981.40 981.40 981.40 981.40 981.40 981.40 981.40 981.40 2 Okt.II 883.23 883.23 883.23 883.23 883.23 883.23 883.23 883.23 3 Nop.I 637.95 637.95 637.95 637.95 637.95 637.95 637.95 637.95 4 Nop.II 490.70 490.70 490.70 490.70 490.70 490.70 490.70 490.70 5 Des.I 441.62 441.62 441.62 441.62 441.62 441.62 441.62 441.62 6 Des.II 441.62 441.62 441.62 441.62 441.62 441.62 441.62 441.62 7 Jan.I 441.62 441.62 441.62 441.62 441.62 441.62 441.62 441.62 8 Jan.II 392.60 392.60 392.60 392.60 392.60 392.60 392.60 392.60 9 Peb.I 294.43 294.43 294.43 294.43 294.43 294.43 294.43 294.43 10 Peb.II 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 11 Mar.I 624.52 624.52 624.52 624.52 624.52 624.52 624.52 624.52 12 Mar.II 624.52 624.52 624.52 624.52 624.52 624.52 624.52 624.52 13 Apr.I 558.22 558.22 558.22 558.22 558.22 558.22 558.22 558.22 14 Apr.II 588.87 588.87 588.87 588.87 588.87 588.87 588.87 588.87 15 Mei.I 624.52 624.52 624.52 624.52 624.52 624.52 624.52 624.52 16 Mei.II 713.76 713.76 713.76 713.76 713.76 713.76 713.76 713.76 17 Jun.I 758.38 758.38 758.38 758.38 758.38 758.38 758.38 758.38 18 Jun.II 669.14 669.14 669.14 669.14 669.14 669.14 669.14 669.14 19 Jul.I 0.06 0.06 0.06 0.06 0.06 0.06 0.06 0.06 20 Jul.II 21 Ags.I 22 Ags.II 23 Sep.I 24 Sep.II Keterangan :I : Musim Tanam I II : Musim Tanam II NO PERIODE
Total Alokasi Air Irigasi Optimum (ribu m3)
DASAR SKENARIO 1 SKENARIO 2 SKENARIO 3 SKENARIO 4 SKENARIO 5 SKENARIO 6 SKENARIO 7
Lampiran 21. Alokasi Air Irigasi Optimum Berdasarkan Musim Tanam dan Model Dasar serta Skenario 1 sampai dengan 7
di Wilayah Cibeet A
219
MT I MT II MT I MT II MT I MT II MT I MT II MT I MT II MT I MT II MT I MT II MT I MT II 1 Okt.I 8,566.72 8,566.72 8,566.72 8,566.72 8,566.72 8,566.72 8,566.72 8,566.72 2 Okt.II 16,797.07 16,797.07 16,797.07 16,797.07 16,797.07 16,797.07 16,797.07 16,797.07 3 Nop.I 25,305.29 25,305.29 25,305.29 25,305.29 25,305.29 25,305.29 25,305.29 25,305.29 4 Nop.II 30,710.33 30,710.33 30,710.33 30,710.33 30,710.33 30,710.33 30,710.33 30,710.33 5 Des.I 29,298.82 29,298.82 29,298.82 29,298.82 29,298.82 29,298.82 29,298.82 29,298.82 6 Des.II 24,153.13 24,153.13 24,153.13 24,153.13 24,153.13 24,153.13 24,153.13 24,153.13 7 Jan.I 20,986.95 20,986.95 20,986.95 20,986.95 20,986.95 20,986.95 20,986.95 20,986.95 8 Jan.II 19,410.71 19,410.71 19,410.71 19,410.71 19,410.71 19,410.71 19,410.71 19,410.71 9 Peb.I 17,885.83 17,885.83 17,885.83 17,885.83 17,885.83 17,885.83 17,885.83 17,885.83 10 Peb.II 13,830.06 13,830.06 13,830.06 13,830.06 13,830.06 13,830.06 13,830.06 13,830.06 11 Mar.I 9,442.33 5,451.44 9,442.33 5,451.44 9,442.33 5,451.44 9,442.33 5,451.44 9,442.33 5,451.44 9,442.33 5,451.44 9,442.33 5,451.44 9,442.33 5,451.44 12 Mar.II 4,748.98 11,234.13 4,748.98 11,234.13 4,748.98 11,234.13 4,748.98 11,234.13 4,748.98 11,234.13 4,748.98 11,234.13 4,748.98 11,234.13 4,748.98 11,234.13 13 Apr.I 1,285.16 17,810.78 1,285.16 17,810.78 1,285.16 17,810.78 1,285.16 17,810.78 1,285.16 17,810.78 1,285.16 17,810.78 1,285.16 17,810.78 1,285.16 17,810.78 14 Apr.II 0.31 23,423.45 0.31 23,423.45 0.31 23,423.45 0.31 23,423.45 0.31 23,423.45 0.31 23,423.45 0.31 23,423.45 0.31 23,423.45 15 Mei.I 25,875.98 25,875.98 25,875.98 25,875.98 25,875.98 25,875.98 25,875.98 25,875.98 16 Mei.II 27,191.83 27,191.83 27,191.83 27,191.83 27,191.83 27,191.83 27,191.83 27,191.83 17 Jun.I 28,708.03 28,708.03 28,708.03 28,708.03 28,708.03 28,708.03 28,438.48 28,438.48 18 Jun.II 30,043.09 30,043.09 30,043.09 30,043.09 30,176.43 30,043.09 30,312.64 30,312.64 19 Jul.I 25,594.53 25,594.53 25,594.53 25,594.53 25,594.53 25,594.53 25,594.53 25,594.53 20 Jul.II 18,946.77 18,946.77 18,946.77 18,946.77 18,813.43 18,946.77 18,946.77 18,946.77 21 Ags.I 10,207.55 10,207.55 10,207.55 10,207.55 10,207.55 10,207.55 10,207.55 10,207.55 22 Ags.II 2,919.68 2,919.68 2,919.68 2,919.68 2,919.68 2,919.68 2,919.68 2,919.68 23 Sep.I 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28 24 Sep.II .
Keterangan :
I : Musim Tanam I
II : Musim Tanam II
NO PERIODE
Total Alokasi Air Irigasi Optimum (ribu m
3)
220
MT I MT II MT I MT II MT I MT II MT I MT II MT I MT II MT I MT II MT I MT II MT I MT II 1 Okt.I 2 Okt.II 3 Nop.I 8,014.30 8,014.30 8,014.30 8,014.30 8,014.30 8,014.30 8,014.30 8,014.30 4 Nop.II 14,901.87 14,901.87 14,901.87 14,901.87 14,901.87 14,901.87 14,901.87 14,901.87 5 Des.I 15,158.85 17,158.85 17,158.85 17,158.85 17,158.85 17,158.85 17,158.85 17,158.85 6 Des.II 13,531.55 13,531.55 13,531.55 13,531.55 13,531.55 13,531.55 13,531.55 13,531.55 7 Jan.I 10,720.08 10,720.08 10,720.08 10,720.08 10,720.08 10,720.08 10,720.08 10,720.08 8 Jan.II 9,580.92 9,580.92 9,580.92 9,580.92 9,580.92 9,580.92 9,580.92 9,580.92 9 Peb.I 9,329.40 9,329.40 9,329.40 9,329.40 9,329.40 9,329.40 9,329.40 9,329.40 10 Peb.II 8,929.14 8,929.14 8,929.14 8,929.14 8,929.14 8,929.14 8,929.14 8,929.14 11 Mar.I 7,743.46 7,743.46 7,743.46 7,743.46 7,743.46 7,743.46 7,743.46 7,743.46 12 Mar.II 4,319.32 4,319.32 4,319.32 4,319.32 4,319.32 4,319.32 4,319.32 4,319.32 13 Apr.I 1,509.36 5,099.91 1,509.36 5,099.91 1,509.36 5,099.91 1,509.36 5,099.91 1,509.36 5,099.91 1,509.36 5,099.91 1,509.36 5,099.91 1,509.36 5,099.91 14 Apr.II 0.36 9,992.95 0.36 9,992.95 0.36 9,992.95 0.36 9,992.95 0.36 9,992.95 0.36 9,992.95 0.36 9,992.95 0.36 9,992.95 15 Mei.I 12,464.98 12,464.98 12,464.98 12,464.98 12,464.98 12,464.98 12,464.98 12,464.98 16 Mei.II 11,807.45 12,203.42 12,203.42 11,807.45 12,203.42 11,766.26 12,203.42 11,766.26 17 Jun.I 12,037.52 12,037.52 12,037.52 12,037.52 12,224.42 12,078.72 12,037.52 12,037.52 18 Jun.II 14,047.89 13,651.92 13,651.92 14,047.89 13,465.02 14,047.89 13,651.92 13,589.67 19 Jul.I 15,180.98 15,390.11 15,390.11 15,390.11 15,390.11 15,390.11 15,390.11 15,390.11 20 Jul.II 15,429.54 15,220.42 15,220.42 15,220.42 15,220.42 15,220.42 15,220.42 15,220.42 21 Ags.I 9,129.45 9,129.45 9,129.45 9,129.45 9,129.45 9,129.45 9,129.45 9,129.45 22 Ags.II 3,429.45 3,429.45 3,429.45 3,429.45 3,429.45 3,429.45 3,429.45 23 Sep.I 0.33 0.33 0.33 0.33 0.33 0.33 0.33 24 Sep.IIKeterangan :
I : Musim Tanam I
II : Musim Tanam II
PERIODE
NO SKENARIO 1 SKENARIO 2 SKENARIO 3 SKENARIO 6 SKENARIO 7
Total Alokasi Air Irigasi Optimum (ribu m
3)
DASAR SKENARIO 4 SKENARIO 5
Lampiran 23. Alokasi Air Irigasi Optimum Berdasarkan Musim Tanam dan Model Dasar serta Skenario 1 sampai dengan 7
di Wilayah Cikarang A
221
MT I MT II MT I MT II MT I MT II MT I MT II MT I MT II MT I MT II MT I MT II MT I MT II 1 Okt.I 9,108.51 9,108.51 9,108.51 9,108.51 9,108.51 9,108.51 9,108.51 9,108.51 2 Okt.II 8,197.40 8,197.40 8,197.40 8,197.40 8,197.40 8,197.40 8,197.40 8,197.40 3 Nop.I 16,416.86 16,416.86 16,416.86 16,416.86 16,416.86 16,416.86 16,416.86 16,416.86 4 Nop.II 18,013.82 18,013.82 18,013.82 18,013.82 18,013.82 18,013.82 18,013.82 18,013.82 5 Des.I 14,533.57 14,533.57 14,533.57 14,533.57 14,533.57 14,533.57 14,533.57 14,533.57 6 Des.II 11,955.63 11,955.63 11,955.63 11,955.63 11,955.63 11,955.63 11,955.63 11,955.63 7 Jan.I 10,828.48 10,828.48 10,828.48 10,828.48 10,828.48 10,828.48 10,828.48 10,828.48 8 Jan.II 10,172.85 10,172.85 10,172.85 10,172.85 10,172.85 10,172.85 10,172.85 10,172.85 9 Peb.I 9,261.73 9,261.73 9,261.73 9,261.73 9,261.73 9,261.73 9,261.73 9,261.73 10 Peb.II 6,005.51 6,005.51 6,005.51 6,005.51 6,005.51 6,005.51 6,005.51 6,005.51 11 Mar.I 4,754.51 5,796.21 4,754.51 5,796.21 4,754.51 5,796.21 4,754.51 6,231.31 4,754.51 6,229.15 4,754.51 6,231.37 4,754.51 5,796.21 4,754.51 5,796.21 12 Mar.II 1,204.87 6,375.83 1,204.87 6,375.83 1,204.87 6,375.83 1,204.87 6,375.83 1,204.87 6,375.83 1,204.87 6,375.83 1,204.87 6,375.83 1,204.87 6,375.83 13 Apr.I 0.29 8,603.75 0.29 12,119.33 0.29 11,647.61 0.29 11,684.22 0.29 11,686.50 0.29 11,684.28 0.29 11,647.61 0.29 5,465.37 14 Apr.II 7,821.59 12,944.11 12,911.01 13,754.85 13,754.85 13,754.85 12,911.01 4,968.52 15 Mei.I 8,241.87 12,818.04 12,784.94 13,628.77 13,628.77 13,628.77 12,784.94 5,796.21 16 Mei.II 9,070.15 13,461.18 13,432.81 14,156.15 14,156.15 14,156.15 13,432.81 6,624.49 17 Jun.I 9,891.71 14,829.09 14,800.72 15,524.05 15,524.05 15,524.05 14,800.72 7,038.64 18 Jun.II 9,471.13 15,140.39 15,107.29 15,951.13 15,951.13 15,951.13 15,107.29 6,210.35 19 Jul.I 3,465.23 9,593.13 9,555.30 10,519.73 10,519.73 10,519.73 9,555.30 0.59 20 Jul.II 3,065.03 8,730.72 8,690.53 9,715.24 9,715.24 9,715.24 8,690.53 21 Ags.I 0.32 1,528.80 1,489.79 2,484.33 2,484.33 2,484.33 1,489.79 22 Ags.II 0.15 0.14 0.24 0.24 0.24 0.14 23 Sep.I 24 Sep.II Keterangan :I : Musim Tanam I II : Musim Tanam II
NO PERIODE
Total Alokasi Air Irigasi Optimum (ribu m3)
222
MT I MT II MT I MT II MT I MT II MT I MT II MT I MT II MT I MT II MT I MT II MT I MT II 1 Okt.I 395.19 395.19 395.19 395.19 395.19 395.19 395.19 395.19 2 Okt.II 355.66 355.66 355.66 355.66 355.66 355.66 355.66 355.66 3 Nop.I 2,198.85 2,198.85 2,198.85 2,198.85 2,198.85 2,198.85 2,198.85 2,198.85 4 Nop.II 10,718.12 10,718.12 10,718.12 10,718.12 10,718.12 10,718.12 10,718.12 10,718.12 5 Des.I 11,043.71 11,043.71 11,043.71 11,043.71 11,043.71 11,043.71 11,043.71 11,043.71 6 Des.II 8,388.89 8,388.89 8,388.89 8,388.89 8,388.89 8,388.89 8,388.89 8,388.89 7 Jan.I 6,548.52 6,548.52 6,548.52 6,548.52 6,548.52 6,548.52 6,548.52 6,548.52 8 Jan.II 5,833.71 5,833.71 5,833.71 5,833.71 5,833.71 5,833.71 5,833.71 5,833.71 9 Peb.I 5,708.74 5,708.74 5,708.74 5,708.74 5,708.74 5,708.74 5,708.74 5,708.74 10 Peb.II 5,493.22 5,493.22 5,493.22 5,493.22 5,493.22 5,493.22 5,493.22 5,493.22 11 Mar.I 4,860.81 251.48 4,860.81 251.48 4,860.81 251.48 4,860.81 251.48 4,860.81 251.48 4,860.81 251.48 4,860.81 251.48 4,860.81 251.480 12 Mar.II 3,315.48 251.48 3,315.48 251.48 3,315.48 251.48 3,315.48 251.48 3,315.48 251.48 3,315.48 251.48 3,315.48 251.48 3,315.48 251.480 13 Apr.I 513.13 1,451.34 513.13 224.79 513.13 224.79 513.13 1,451.34 513.13 1,451.34 513.13 1,451.34 513.13 224.79 513.13 1451.336 14 Apr.II 0.12 1,451.34 0.12 237.13 0.12 237.13 0.12 1,451.34 0.12 1,451.34 0.12 1,451.34 0.12 237.13 0.12 2455.918 15 Mei.I 1,310.78 251.48 251.48 1,310.78 1,310.78 1,310.78 251.48 2315.363 16 Mei.II 1,452.65 287.42 287.42 1,452.65 1,452.65 1,374.36 287.42 2235.488 17 Jun.I 1,586.44 305.39 305.39 1,586.44 1,586.44 1,664.73 305.39 2525.858 18 Jun.II 1,681.81 269.45 269.45 1,681.81 1,681.81 1,681.81 269.45 2686.390 19 Jul.I 1,500.68 0.03 0.03 1,500.68 1,500.68 1,500.68 0.03 2666.156 20 Jul.II 1,324.06 1,324.06 1,324.06 1,324.06 2543.979 21 Ags.I 0.13 0.13 0.13 0.13 1076.486 22 Ags.II 0.103 23 Sep.I 24 Sep.II Keterangan :I : Musim Tanam I II : Musim Tanam II
SKENARIO 2 NO PERIODE
Total Alokasi Air Irigasi Optimum (ribu m3)
SKENARIO 4 SKENARIO 5
DASAR SKENARIO 1 SKENARIO 3 SKENARIO 6 SKENARIO 7
Lampiran 25. Alokasi Air Irigasi Optimum Berdasarkan Musim Tanam dan Model Dasar serta Skenario 1 sampai dengan 7
di Wilayah Bekasi A
223
BASE SKENARIO 1 SKENARIO 2 SKENARIO 3 SKENARIO 4 SKENARIO 5 SKENARIO 6 SKENARIO 7
Curug 1. Pertanian pada MT 1 5883.70 5883.70 5929.58 5883.70 7727.60 7727.60 5883.70 7727.60 2. Pertanian pada MT 2 2325.80 2325.80 2276.40 3983.30 4605.40 5249.00 6117.40 2999.60 3. PAM Domestik 1.04 0.97 1.14 0.87 0.88 0.87 0.95 0.95 4. Industri 257.78 19.09 126.51 258.16 258.16 258.16 258.16 402.92 Cibeet A 1. Pertanian pada MT 1 741.19 741.19 741.19 741.19 973.48 973.48 741.19 973.48 2. Pertanian pada MT 2 770.64 770.64 770.64 770.64 1015.50 1015.50 770.64 1015.50 3. PAM Domestik - - - -4. Industri 1.51 1.51 1.89 1.51 1.51 1.89 1.89 1.89 Cibeet B 1. Pertanian pada MT 1 25086.00 25086.00 20064.00 25080.00 33588.00 33588.00 25086.00 33595.00 2. Pertanian pada MT 2 25018.00 25018.00 25018.00 23382.00 31455.00 31455.00 25018.00 33758.00 3. PAM Domestik 18.65 20.51 20.51 18.65 18.65 18.65 20.51 20.51 4. Industri 104.54 104.54 137.46 104.54 104.54 104.54 137.46 137.46 Cikarang A 1. Pertanian pada MT 1 10239.00 10239.00 10235.00 10235.00 13911.00 13911.00 10239.00 13915.00 2. Pertanian pada MT 2 10180.00 10180.00 8208.00 8261.00 11264.00 11264.00 10180.00 13771.00 3. PAM Domestik 0.17 0.19 0.19 0.17 0.17 0.17 0.19 0.19 4. Industri 69.27 69.27 89.97 69.27 69.27 69.27 89.97 89.97 Cikarang B 1. Pertanian pada MT 1 14387.00 14387.00 14387.00 14384.00 19173.00 19177.00 14387.00 19177.00 2. Pertanian pada MT 2 9122.90 9122.90 9122.90 9246.10 13721.00 12298.00 13485.00 8925.30 3. PAM Domestik 41.24 46.25 46.25 42.04 42.04 42.04 45.72 46.25 4. Industri 39.79 56.15 1703.00 56.15 56.15 56.15 77.22 77.22 Bekasi A 1. Pertanian pada MT 1 6422.70 6422.70 6421.00 6421.00 8715.00 8715.00 6422.70 8717.20 2. Pertanian pada MT 2 1383.30 1383.30 1382.70 1383.30 389.45 1864.50 295.54 2917.90 3. PAM Domestik 34.61 34.61 34.61 31.46 31.46 31.46 34.61 34.61 4. Industri 13.64 13.64 13.64 11.44 359.48 11.43 13.64 13.64 Bekasi B 1. Pertanian pada MT 1 - - - -2. Pertanian pada MT 2 - - - -3. PAM Domestik 998.66 998.66 998.66 905.62 907.88 905.62 954.93 954.93 4. Industri - - -
-Perum Jasa Tirta II 2214.60 2219.00 2219.00 2220.30 2027.40 2220.30 2435.80 2435.80
BENEFIT (juta rupiah) WILAYAH DAN SEKTOR
Lampiran 27. Program pemecahan Optimasi Dinamik Aplikasi Perangkat Lunak
GAMS
$TITLE PENGELOLAAN SUMBERDAYA AIR DI WILAYAH HILIR DAERAH IRIGASI JATILUHUR-MODELDIJ
$ONTEXT
BASIC-INPUT FILE NAME"DASAR-04" ; OUTPUT SAVED AS "DASAR-04-OUT"
--- FILE1 : MODEL ALOKASI SUMBERDAYA AIR DI WILAYAH HILIR DAERAH IRIGASI JATILUHUR
***MODEL DASAR ** --- $OFFTEXT SETS T horison waktu /01*24/ MT musim tanam /MT1,MT2/
MT1 musim tanam I /TA1,TB1,TC1,TD1,TE1/ MT2 musim tanam II/TA2,TB2,TC2,TD2,TE2/ AT aktivitas usahatani /OT1, OT2, TN, TH1, TH2, TH3, BG1, BG2, MG1, MG2/ GS golongan sawah /SW1, SW2, SW3, SW4, SW5/ GD golongan PDAM /DK, DS, DB/ GI golongan industri /IK, IS, IB/ W wilayah
/Curug, CibeetA, CibeetB, CikarangA, CikarangB, BekasiA, BekasiB, BekasiC/; SCALARS
* Bilangan alam
BA bilangan alam /2.718281828/
* Harga Gabah di tingkat petani ~ ribu rp per ton PPD Harga gabah /1700/
PWI Harga air baku untuk industri/50/
* Harga air baku tiap sektor pemakai air ~ ribu rp per ribu meter kubik PWA Harga air irigasi /5/
* Presentase hilangnya air dari saluran di wilayah Tarum Barat LSI hilangnya air di saluran induk Tarum Barat/0.05/ LSS hilangnya air di saluran sekunder di Tarum Barat /0.10/ LPT hilangnya air di saluran tersier di Tarum Barat /0.20/ * Aliran untuk pemeliharaan saluran ~ meter kubik per detik MFE aliran yang harus ada untuk pemeliharaan saluran/5/ OFTTL aliran minimum untuk Tarum Timur/22/
OFTTU aliran maksimum untuk Tarum Timur /90/ OFTHL aliran minimum untuk Tarum Utara/31/ OFTHU aliran maksimum untuk Tarum Utara/62.5/ OFJ aliran maksimum ke Curug/190.000/
* Biaya operasional per seribu m3 air ~ ribu rupiah
bo biaya operasional per ribu m3 air yang disalurkan /1.0706/ ko konstanta biaya ops per ribu m3 air yang disalurkan /2.6227/ PARAMETERS
CV(T) konversi debit ke volume setengah bulanan /01 1382.4, 02 1296.0, 03 1296.0, 04 1296.0, 05 1382.4, 06 1296.0, 07 1382.4, 08 1296.0, 09 1209.6, 10 1209.6, 11 1382.4, 12 1296.0, 13 1296.0, 14 1296.0, 15 1382.4, 16 1296.0, 17 1296.0, 18 1296.0, 19 1382.4, 20 1296.0, 21 1382.4, 22 1296.0, 23 1296.0, 24 1296.0/
YRP(GS) produksi potensial per golongan sawah ~ ton per ha /SW1 = 6.0, SW2 = 5.6, SW3 = 5.2, SW4 = 4.9, SW5 = 4.2/ TBA(GS) total biaya usaha tani per musim tanam ~ ribu rp
/SW1 = 1860, SW2 = 2020, SW3 = 2180, SW4 = 2205, SW5 = 2215/ CWC(GD) Koefisien konversi air baku ke air bersih
/DK = 0.885, DS = 0.80, DB = 0.75/
PWD(GD) Harga air baku PDAM per golongan /DK = 45, DS = 45, DB = 100/
PCW(GD) Harga air bersih per golongan PDAM ~ ribu rupiah per seribu m3 /DK = 1000, DS = 2600, DB = 5473/
EFO(GD) Efisiensi pengolahan air bersih per golongan PDAM /DK = 0.85, DS = 0.80, DB = 0.75/
EFD(GD) Efisiensi distribusi air bersih per golongan PDAM /DK = 0.75, DS = 0.80, DB = 0.85/
KTBO(GD) Konstanta fungsi biaya pengolahan per golongan PDAM /DK = 0.820, DS = 0.775, DB = 0.725/
KTBD(GD) Konstanta fungsi biaya distribusi per golongan PDAM /DK = 0.675, DS = 0.700, DB = 0.725/
KFBO(GD) Koefisien fungsi biaya pengolahan per golongan PDAM /DK = 0.850, DS = 0.800, DB = 0.750/
KFBD(GD) Koefisien fungsi biaya disribusi per golongan PDAM /DK = 0.850, DS = 0.875, DB = 0.900/
ALPHA(GI) Intersep permintaan air industri /IK = 6.9740, IS = 8.1537, IB = 9.1424/ GAMMA(GI) Koefisien permintaan air industri /IK = 0.3455, IS = 0.7444, IB = 0.8244/ DF(T) discount factor /01 0.994612, 02 0.989254, 03 0.983924, 04 0.978623, 05 0.973351, 06 0.968107, 07 0.962891, 08 0.957704, 09 0.952544, 10 0.947412, 11 0.942308, 12 0.937231, 13 0.932182, 14 0.927160, 15 0.922165, 16 0.917197, 17 0.912255, 18 0.907341, 19 0.902452, 20 0.897590, 21 0.892754, 22 0.887945, 23 0.883161, 24 0.878403/
226
* Inflow pada waktu t ~ meter kubik per detik IFSLJ (T) inflow sumber lain ke waduk Juanda /01 4.53, 02 5.65, 03 8.04, 04 5.62, 05 11.48, 06 12.75, 07 9.47, 08 11.68, 09 11.86, 10 28.27, 11 20.00, 12 7.73, 13 9.96, 14 14.41, 15 33.80, 16 23.66, 17 6.44, 18 4.23, 19 4.72, 20 3.39, 21 1.24, 22 1.46, 23 1.18, 24 1.19/ IFCTJ(T) inflow Sungai Citarum ke Juanda
/01 121.30, 02 169.89, 03 114.99, 04 89.96, 05 235.13, 06 245.43, 07 126.62, 08 161.01, 09 193.75, 10 210.39, 11 206.20, 12 196.51, 13 148.23, 14 228.01, 15 191.02, 16 147.00, 17 102.95, 18 87.61, 19 94.95, 20 145.08, 21 88.24, 22 67.46, 23 98.35, 24 98.25/ IFKBT(T) inflow dari kali Cibeet
/01 28.55, 02 31.30, 03 22.50, 04 16.20, 05 38.93, 06 22.49, 07 38.89, 08 47.40, 09 40.59, 10 40.25, 11 51.39, 12 22.66, 13 49.73, 14 29.87, 15 58.99, 16 48.03, 17 9.83, 18 6.98, 19 8.11, 20 3.67, 21 0.42, 22 0.61, 23 6.76, 24 3.90/ IFKCK(T) inflow dari kali Cikarang
/01 17.69, 02 10.99, 03 8.48, 04 8.01, 05 14.87, 06 24.29, 07 25.78, 08 16.30, 09 27.10, 10 39.78, 11 28.39, 12 20.15, 13 21.75, 14 19.84, 15 19.92, 16 14.51, 17 3.45, 18 5.81, 19 2.26, 20 1.95, 21 2.04, 22 1.22, 23 0.45, 24 0.88/ IFKBK(T) inflow dari kali Bekasi
/01 39.59, 02 52.74, 03 23.21, 04 35.00, 05 32.72, 06 32.39, 07 49.60, 08 38.43, 09 40.22, 10 57.09, 11 59.29, 12 59.88, 13 70.46, 14 57.23, 15 71.05, 16 35.03, 17 10.82, 18 7.27, 19 12.48, 20 6.39, 21 1.48, 22 1.10, 23 1.95, 24 4.93/ * Air keluar dari Bendung ke Salduk ~ meter kubik per detik OFCRTTL(T) outflow Curug ke Tarum Timur
/01 34.23, 02 35.00, 03 34.47, 04 35.01, 05 34.55, 06 35.00, 07 29.95, 08 31.39, 09 28.73, 10 18.58, 11 37.08, 12 21.64, 13 24.20, 14 32.84, 15 34.77, 16 34.88, 17 40.38, 18 44.98, 19 49.99, 20 53.95, 21 55.08, 22 54.80, 23 48.17, 24 53.38/ OFCRTHL(T) outflow Curug ke Tarum Tengah /01 30.95, 02 43.57, 03 44.46, 04 57.34, 05 57.71, 06 62.59, 07 86.05, 08 60.89, 09 62.31, 10 112.87, 11 95.28, 12 65.48, 13 91.68, 14 69.24, 15 78.81, 16 65.77, 17 63.54, 18 71.70, 19 66.97, 20 75.76, 21 68.43, 22 65.97, 23 62.76, 24 93.63/
TABLE TL(GS,W) luas lahan per wilayah per golongan ~ hektar Curug CibeetA CibeetB CikarangA CikarangB
SW1 3850 485 4032 0 4287
SW2 0 0 4277 0 0
SW3 0 0 5440 3772 4940
SW4 0 0 4762 3619 1889
SW5 0 0 2015 2367 0
+ BekasiA BekasiB BekasiC SW1 186 0 0 SW2 0 0 0 SW3 914 0 0 SW4 4129 0 0 SW5 804 0 0 TABLE ND(GD,W) jumlah PDAM per wilayah ~ perusahaan Curug CibeetA CibeetB CikarangA CikarangB DK 1 0 0 1 2
DS 0 0 1 0 1
DB 0 0 0 0 0
+ BekasiA BekasiB BekasiC DK 1 0 0
DS 1 1 0
DB 0 1 0
TABLE NI(GI,W) jumlah industri per wilayah ~ perusahaan Curug CibeetA CibeetB CikarangA CikarangB IK 3 0 0 0 9
IS 8 1 3 1 6
IB 1 0 3 1 1
+ BekasiA BekasiB BekasiC IK 0 0 0
IS 2 0 0
IB 0 0 0
TABLE WD0(GD,W) kebutuhan minimum air untuk PDAM per gol ~ ribu m3 Curug CibeetA CibeetB CikarangA CikarangB DK 30.5100 0.0000 0.0000 3.7555 73.0800 DS 0.0000 0.0000 172.8000 0.0000 410.4000 DB 0.0000 0.0000 0.0000 0.0000 0.0000 + BekasiA BekasiB BekasiC
DK 21.8500 0.0000 0.0000 DS 340.2000 151.2000 0.0000 DB 0.0000 18177.7870 0.0000
TABLE WDU(GD,W) kebutuhan maksimum air untuk PDAM per gol ~ ribu m3 Curug CibeetA CibeetB CikarangA CikarangB
DK 36.0000 0.0001 0.0000 5.0000 80.0000 DS 0.0001 0.0001 220.0000 0.0001 430.0000 DB 0.0001 0.0001 0.0001 0.0001 0.0001 + BekasiA BekasiB BekasiC
DK 27.0000 0.0001 0.0001 DS 360.0000 160.0000 0.0001 DB 0.0001 19705.0000 0.0001
228
TABLE WI0(GI,W) kebutuhan minimum air untuk industri per gol ~ ribu m3 Curug CibeetA CibeetB CikarangA CikarangB IK 1.7494 0.0000 0.0000 0.0000 2.9195 IS 20.0413 19.0200 13.0078 11.0750 28.1750 IB 325.6956 0.0000 126.9884 169.4945 156.6510 + BekasiA BekasiB BekasiC
IK 0.0000 0.0000 0.0000 IS 28.3595 0.0000 0.0000 IB 0.0000 0.0000 0.0000
TABLE WIU(GI,W) kebutuhan maksimum air untuk industri per gol ~ ribu m3 Curug CibeetA CibeetB CikarangA CikarangB
IK 4.3000 0.0001 0.0001 0.0001 7.5000 IS 32.0000 37.0000 29.0000 35.0000 34.0000 IB 408.0000 0.0001 166.0000 220.0000 195.0000 + BekasiA BekasiB BekasiC
IK 0.0000 0.0001 0.0001 IS 56.0000 0.0001 0.0001 IB 0.0001 0.0001 0.0001
TABLE BETA1(T,GS,MT1,AT) koefisien respons yield sawah I MT1
SW1.TA1.OT1
SW1.TA1.OT2
SW1.TA1.TN
SW1.TA1.TH1
SW1.TA1.TH2 SW1.TA1.TH3
1
0.01
0
0
0
0
0
2
0
0.01
0
0
0
0
3
0
0
1.15
0
0
0
4
0
0
0
1.2
0
0
5
0
0
0
0
1.2
0
6
0
0
0
0
0
1.2
7
0
0
0
0
0
0
8
0
0
0
0
0
0
9
0
0
0
0
0
0
10
0
0
0
0
0
0
11
0
0
0
0
0
0
12
0
0
0
0
0
0
13
0
0
0
0
0
0
14
0
0
0
0
0
0
15
0
0
0
0
0
0
16
0
0
0
0
0
0
17
0
0
0
0
0
0
18
0
0
0
0
0
0
19
0
0
0
0
0
0
20
0
0
0
0
0
0
21
0
0
0
0
0
0
22
0
0
0
0
0
0
23
0
0
0
0
0
0
24
0
0
0
0
0
0
+ SW1.TA1.BG1 SW1.TA1.BG2 SW1.TA1.MG1 SW1.TA1.MG2 1 0 0 0 0 2 0 0 0 0 3 0 0 0 0 4 0 0 0 0 5 0 0 0 0 6 0 0 0 0 7 1.2 0 0 0 8 0 1.15 0 0 9 0 0 1.1 0 10 0 0 0 1.05 11 0 0 0 0 12 0 0 0 0 13 0 0 0 0 14 0 0 0 0 15 0 0 0 0 16 0 0 0 0 17 0 0 0 0 18 0 0 0 0 19 0 0 0 0 20 0 0 0 0 21 0 0 0 0 22 0 0 0 0 23 0 0 0 0 24 0 0 0 0
TABLE BETA2(T,GS,MT2,AT) koefisien respons yield MT2
SW1.TA2.OT1 SW1.TA2.OT2 SW1.TA2.TN SW1.TA2.TH1 SW1.TA2.TH2 SW1.TA2.TH3
1 0 0 0 0 0 0 2 0 0 0 0 0 0 3 0 0 0 0 0 0 4 0 0 0 0 0 0 5 0 0 0 0 0 0 6 0 0 0 0 0 0 7 0 0 0 0 0 0 8 0 0 0 0 0 0 9 0 0 0 0 0 0 10 0 0 0 0 0 0 11 0.01 0 0 0 0 0 12 0 0.01 0 0 0 0 13 0 0 1.15 0 0 0 14 0 0 0 1.2 1.2 0 15 0 0 0 0 0 1.2 16 0 0 0 0 0 0 17 0 0 0 0 0 0 18 0 0 0 0 0 0 19 0 0 0 0 0 0 20 0 0 0 0 0 0 21 0 0 0 0 0 0 22 0 0 0 0 0 0 23 0 0 0 0 0 0 24 0 0 0 0 0 0