DAFTAR HARGA SATUAN PEKERJAAN YANG TIMPANG
PERUSAHAAN: CV. INDO KONSTRUKSI
No
Uraian Pekerjaan Satuan
Harga Satuan
Perimbangan
Harga Ket
OE Penawaran
I PEKERJAAN PENDAHULUAN
4 Pemasangan Bowplank m2 22,766.09 36,746.60 161.41 % Timpang 5 Lansiran Material
Set 20,541,039.85 38,118,021.82 185.57 % Timpang
II PEKERJAAN TANAH
1 Galian Tanah
m3 59,143.15 75,141.00 127.05 % Timpang 2 Tanah Datang
m3 60,000.00 315,000.00 525.00 % Timpang
IV PEKERJAAN BETON BERTULANG
1 Beton K - 225 ( Manual ) Slum, 12 + 2 cm m3 1,625,654.08 1,982,525.57 121.95 % Timpang 2 Bekisting
m2 171,830.12 243,899.70 141.94 % Timpang
V PEKERJAAN DEWATERING
1 Kisdam ( Tinggi 1,5 M ) m' 413,184.34 530,666.07 128.43 % Timpang
VI PEKERJAAN PINTU AIR