ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN PEMBANGUNAN RUMAH PRASARANANNYA

DI LOKASI BUMI PALIR SEJAHTERA PERUM PERUMNAS CABANG SEMARANG I

H. SATUAN HARGA UPAH JUMLAH

NO. KOEF. SAT U R A I A N. BAHAN/UPAH BAHAN TENAGA H. SATUAN

( Rp ) ( Rp ) ( Rp ) ( Rp ) 1 2 3 4 5 6 7 8 1 1 M1 NORMALISASI SALURAN 1.0000 Ls Alat Bantu 1,000.00 1,000.00 1,000.00 0.0750 Uph Mandor 40,000.00 - 3,000.00 3,000.00 0.5000

Uph Tukang batu 37,000.00 - 18,500.00 18,500.00 0.7500

Uph Pekerja 35,000.00 - 26,250.00 26,250.00 JUMLAH 1,000.00 47,750.00 48,750.00

Dibulatkan 48,750.00

2

1 M2 PAS.BATU BATA KOSONG

80.0000

Bh Batu bata 350.00 28,000.00 28,000.00

0.0100

Uph Mandor 40,000.00 - 400.00 400.00 0.0500

Uph Tukang batu 37,000.00 - 1,850.00 1,850.00 0.1000

Uph Pekerja 35,000.00 - 3,500.00 3,500.00 JUMLAH 28,000.00 5,750.00 33,750.00

Dibulatkan 33,750.00

3

1 M3 BATU KOSONG (Memasukkan ke Sumur Resapan)

1.1000

M3 Batu kali bulat 120,000.00 132,000.00 132,000.00

0.1250 Uph Mandor 40,000.00 5,000.00 5,000.00 0.2500 Uph Pekerja 35,000.00 8,750.00 8,750.00 JUMLAH 132,000.00 13,750.00 145,750.00 Dibulatkan 145,750.00 4

1 M3 URUGAN SIRTU & PEMADATAN

1.20 M3 Sirtu 72,500.00 87,000.00 87,000.00 1.0000 Ls Gilas Pemadatan 10,000.00 10,000.00 10,000.00 0.0250 Uph Mandor 40,000.00 1,000.00 1,000.00 0.25 Upah Pekerja 35,000.00 8,750.00 8,750.00 JUMLAH 87,000.00 19,750.00 106,750.00 Dibulatkan 106,750.00

1 m2 Urugan Sirtu tebal 20 cm = 21,350.00

Dibulatkan 21,350.00

5

1 M2 PEKERJAAN JALAN PAVING TEBAL 6 CM

0.0600 m3 Pasir Urug & pengisi 60,000.00 3,600.00 3,600.00

1.0000 m2 Paving tebal 6 cm 35,000.00 35,000.00 35,000.00

1.0000 Ls Upah Pasang 3,000.00 3,000.00 3,000.00

JUMLAH 38,600.00 3,000.00 41,600.00

Dibulatkan 41,600.00

6

1 M' PEKERJAAN JALAN PAVING DMJ 6(lebar Perkerasan 3 m)

0.6000 m3 Galian Tanah 15,600.00 9,360.00 9,360.00

2.8000 m2 Urugan Sirtu t = 20 cm 21,350.00 59,780.00 59,780.00

2.8000 m2 Paving tebal 6 cm 41,600.00 116,480.00 116,480.00

4.0000 Bh Beton Kanstein uk. 20 x 30 x 50 cm 12,000.00 48,000.00 48,000.00 1.0000 Ls Pembersihan & Perataan 12,000.00 12,000.00 12,000.00 JUMLAH 224,260.00 21,360.00 245,620.00

Dibulatkan 245,620.00

7

1 M2 PEKERJAAN JALAN PAVING TEBAL 8 CM

0.0600 m3 Pasir Urug & pengisi 60,000.00 3,600.00 3,600.00

1.0000 m2 Paving tebal 8 cm 45,000.00 45,000.00 45,000.00

1.0000 Ls Upah Pasang 3,000.00 3,000.00 3,000.00

JUMLAH 48,600.00 3,000.00 51,600.00

Dibulatkan 51,600.00

7

1 M' PEKERJAAN JALAN PAVING DMJ 7 (lebar Perkerasan 4 m)

0.6000 m3 Galian Tanah 15,600.00 9,360.00 9,360.00

3.1000 m2 Urugan Sirtu t = 20 cm 21,350.00 66,185.00 66,185.00

3.1000 m2 Paving tebal 8 cm 51,600.00 159,960.00 159,960.00

4.0000 bh Beton Kanstein uk. 20 x 30 x 50 cm 12,000.00 48,000.00 48,000.00 0.0000 Ls Pembersihan & Perataan 5,000.00 -

-JUMLAH 274,145.00 9,360.00 283,505.00

(2)

1 2 3 4 5 6 7 8 8

1 M' PEKERJAAN JALAN PAVING DMJ 8 (lebar Perkerasan 4 m)

0.8000 m3 Galian Tanah 15,600.00 12,480.00 12,480.00

3.8000 m2 Urugan Sirtu t = 20 cm 21,350.00 81,130.00 81,130.00

3.8000 m2 Paving tebal 8 cm 51,600.00 196,080.00 196,080.00

4.0000 bh Beton Kanstein uk. 20 x 30 x 50 cm 12,000.00 48,000.00 48,000.00 1.0000 Ls Pembersihan & Perataan 12,000.00 12,000.00 12,000.00 JUMLAH 325,210.00 24,480.00 349,690.00

Dibulatkan 349,690.00

9

1 M' PEKERJAAN JALAN PAVING DMJ 10 (lebar Perkerasan 5 m)

1.0000 m3 Galian Tanah 15,600.00 15,600.00 15,600.00

4.8000 m2 Urugan Sirtu t = 20 cm 21,350.00 102,480.00 102,480.00

4.8000 m2 Paving tebal 8 cm 51,600.00 247,680.00 247,680.00

4.0000 bh Beton Kanstein uk. 20 x 30 x 50 cm 12,000.00 48,000.00 48,000.00 1.0000 Ls Pembersihan & Perataan 12,000.00 12,000.00 12,000.00 JUMLAH 398,160.00 27,600.00 425,760.00

Dibulatkan 425,760.00

10

1 M' PEKERJAAN JALAN PAVING DMJ 12 (lebar Perkerasan 6 m)

1.2000 m3 Galian Tanah 15,600.00 18,720.00 18,720.00

5.8000 m2 Urugan Sirtu t = 20 cm 21,350.00 123,830.00 123,830.00

5.8000 m2 Paving tebal 8 cm 51,600.00 299,280.00 299,280.00

4.0000 bh Beton Kanstein uk. 20 x 30 x 50 cm 12,000.00 48,000.00 48,000.00 1.0000 Ls Pembersihan & Perataan 4,000.00 4,000.00 4,000.00 JUMLAH 471,110.00 22,720.00 493,830.00

Dibulatkan 493,830.00

11

1 M' PEK. SALURAN TYPE S.1 ( Pas. Dinding. 15 Cm )

0.3450 M3 Galian Tanah 15,600.00 5,382.00 5,382.00

0.0200 M3 Urugan Pasir 60,000.00 1,200.00 1,200.00

0.2100 M3 Pas Batu belah kali 1 : 4 439,870.00 92,372.70 92,372.70

0.3400 M2 Plesteran Ban-banan 1:3 24,480.00 8,323.20 8,323.20 0.1000 M' Sulingan Pipa PVC 1" pj. 25 Cm 12,500.00 1,250.00 1,250.00 0.0000 Ls Perapihan berm 1,000.00 - -JUMLAH 108,527.90 - 108,527.90 Dibulatkan 108,520.00 ` 12

1 M' PEK. SALURAN TYPE S.2 ( Pas. Dinding. 15 Cm )

0.5063 M3 Galian Tanah 15,600.00 7,897.50 7,897.50

0.0275 M3 Urugan Pasir 60,000.00 1,650.00 1,650.00

0.2355 M3 Pas Batu belah kali 1 : 4 439,870.00 103,589.39 103,589.39

0.6000 M2 Plesteran Ban-banan 1:3 24,480.00 14,688.00 14,688.00

0.4000 Ls Sulingan Pipa PVC 1" pj. 25 Cm 12,500.00 5,000.00 5,000.00

1.0000 Ls Perapihan berm 1,000.00 1,000.00 1,000.00

JUMLAH 125,927.39 7,897.50 133,824.89

Dibulatkan 133,820.00

13 1 M' PEK. SALURAN TYPE S.3 ( Pas. Dinding. 15 Cm )

0.6588 M3 Galian Tanah 15,600.00 10,276.50 10,276.50

0.0325 M3 Urugan Pasir 60,000.00 1,950.00 1,950.00

0.2925 M3 Pas Batu kali 1 : 4 439,870.00 128,661.98 128,661.98

0.5000 M2 Plesteran Ban-banan 1:3 24,480.00 12,240.00 12,240.00 0.2500 Ls Sulingan Pipa PVC 1" pj. 25 Cm 12,500.00 3,125.00 3,125.00 1.0000 Ls Perapihan berm 1,000.00 1,000.00 1,000.00 JUMLAH 146,976.98 10,276.50 157,253.48 Dibulatkan 157,250.00 14

1 M' PEK. SALURAN TANAH TYPE S.3

0.6588 M3 Galian Tanah 15,600.00 10,276.50 10,276.50

1.0000 Ls Perapihan galian & Berm 3,500.00 3,500.00 3,500.00 JUMLAH 3,500.00 10,276.50 13,776.50

(3)

1 2 3 4 5 6 7 8 15

1 M' PEK. TERJUNAN SALURAN TYPE S.3 (Pas didnding 20 cm )

0.9000 M3 Galian Tanah 15,600.00 14,040.00 14,040.00

0.0500 M3 Urugan Pasir 60,000.00 3,000.00 3,000.00

0.6100 M3 Pas Batu kali 1 : 4 439,870.00 268,320.70 268,320.70

1.0800 M2 Plesteran Ban-banan 1:3 24,480.00 26,438.40 26,438.40

0.2500 Ls Sulingan Pipa PVC 1" pj. 25 Cm 1,000.00 250.00 250.00

1.0000 Ls Perapihan berm 1,000.00 1,000.00 1,000.00

JUMLAH 299,009.10 14,040.00 313,049.10

Dibulatkan 313,040.00

16 1 M' PEK. SALURAN TYPE S.4 ( Pas. Dinding. 15 Cm )

0.8750 M3 Galian Tanah 15,600.00 13,650.00 13,650.00

0.0600 M3 Urugan Pasir 60,000.00 3,600.00 3,600.00

0.4600 M3 Pas Batu kali 1 : 4 439,870.00 202,340.20 202,340.20

0.6000 M2 Plesteran Ban-banan 1:3 24,480.00 14,688.00 14,688.00

0.2500 Ls Sulingan Pipa PVC 1" pj. 25 Cm 1,000.00 250.00 250.00

1.0000 Ls Perapihan berm 1,000.00 1,000.00 1,000.00

JUMLAH 221,878.20 13,650.00 235,528.20

Dibulatkan 235,520.00

17 1 M' PEK. TERJUNAN SALURAN TYPE S.5 ( Pas. Dinding. 20 Cm )

1.2000 M3 Galian Tanah 15,600.00 18,720.00 18,720.00

0.0600 M3 Urugan Pasir 60,000.00 3,600.00 3,600.00

0.7100 M3 Pas Batu kali 1 : 4 439,870.00 312,307.70 312,307.70

1.0800 M2 Plesteran Ban-banan 1:3 24,480.00 26,438.40 26,438.40 0.2500 Ls Sulingan Pipa PVC 1" pj. 25 Cm 1,000.00 250.00 250.00 1.0000 Ls Perapihan berm 1,000.00 1,000.00 1,000.00 JUMLAH 343,596.10 18,720.00 362,316.10 Dibulatkan 362,310.00 18

1 M' PEK. GORONG-GORONG TYPE GR.1

1.1480 M3 Galian Tanah 15,600.00 17,908.80 17,908.80

0.0700 M3 Urugan Pasir 60,000.00 4,200.00 4,200.00

0.5500 M3 Pas Batu kali 1 : 4 439,870.00 241,928.50 241,928.50

1.3000 M2 Pleteran 1:3 24,480.00 31,824.00 31,824.00

0.2520 M2 Urugan Tanah Kembali 7,480.00 1,884.96 1,884.96

0.0960 M3 Plat Cor Beton bertulang 1:2:3 3,008,750.00 288,840.00 288,840.00

1.0000 Ls Perapihan berm 2,000.00 2,000.00 2,000.00

JUMLAH 570,677.46 17,908.80 588,586.26

Dibulatkan 588,580.00

19 1 M' PEK. GORONG-GORONG TYPE GR.2

1.3500 M3 Galian Tanah 15,600.00 21,060.00 21,060.00

0.0750 M3 Urugan Pasir 60,000.00 4,500.00 4,500.00

0.6300 M3 Pas Batu kali 1 : 4 439,870.00 277,118.10 277,118.10

1.5000 M2 Pleteran 1:3 24,480.00 36,720.00 36,720.00

0.2940 M2 Urugan Tanah Kembali 7,480.00 2,199.12 2,199.12

0.0900 M3 Plat Cor Beton bertulang 1:2:3 3,008,750.00 270,787.50 270,787.50

1.0000 Ls Perapihan berm 2,000.00 2,000.00 2,000.00

JUMLAH 593,324.72 21,060.00 614,384.72

Dibulatkan 614,380.00

27 1 M'. PEK. GORONG-GORONG TYPE GR.3

1.6320 M3 Galian Tanah 15,600.00 25,459.20 25,459.20

0.0800 M3 Urugan Pasir 60,000.00 4,800.00 4,800.00

0.7100 M3 Pas Batu kali 1 : 4 439,870.00 312,307.70 312,307.70

1.9000 M2 Pleteran 1:3 24,480.00 46,512.00 46,512.00

0.3360 M2 Urugan Tanah Kembali 7,480.00 2,513.28 2,513.28

0.1200 M3 Plat Cor Beton bertulang 1:2:3 3,008,750.00 361,050.00 361,050.00

1.0000 Ls Perapihan berm 2,000.00 2,000.00 2,000.00

JUMLAH 729,182.98 25,459.20 754,642.18

(4)

1 2 3 4 5 6 7 8 20 1 BH PEK. GORONG-GORONG TYPE GR.1 DMJ 5 M'

3.6000 BH Pekerjaan GR 1 588,580.00 2,118,000.00 2,118,000.00

21 1 BH PEK. GORONG-GORONG TYPE GR.2 DMJ 5 M'

3.4000 BH Pekerjaan GR 2 754,640.00 2,565,000.00 2,565,000.00

22 1 BH PEK. GORONG-GORONG TYPE GR.1 DMJ 6 M'

4.3000 BH Pekerjaan GR 1 588,580.00 2,530,000.00 2,530,000.00

23 1 BH PEK. GORONG-GORONG TYPE GR.2 DMJ 6 M'

4.6000 M' Pekerjaan GR 2 614,380.00 2,826,000.00 2,826,000.00

24 1 BH PEK. GORONG-GORONG TYPE GR.2 DMJ 7 M'

5.0000 M' Pekerjaan GR 2 614,380.00 3,071,000.00 3,071,000.00

26 1 BH PEK. GORONG-GORONG TYPE GR.2 DMJ 8 M'

6.0000 M' Pekerjaan GR 2 614,380.00 3,686,000.00 3,686,000.00

27 1 BH PEK. GORONG-GORONG TYPE GR.2 DMJ 12 M'

7.5000 M' Pekerjaan GR 2 614,380.00 4,607,000.00 4,607,000.00

27 1 BH PEK. GORONG-GORONG TYPE GR.3 DMJ 8

6.2000 M' Pekerjaan GR 3 754,640.00 4,678,768.00 4,678,768.00

28 1 BH. JEMBATAN MASUK PLAT BETON BERTULANG 1:2:3 (S1)

0.0448 M3 Plat Cor Beton bertulang 1:2:3 3,008,750.00 134,792.00 134,792.00

Dibulatkan 134,790.00

29 1 BH. JEMBATAN MASUK PLAT BETON BERTULANG 1:2:3 (S2)

0.0512 M3 Plat Cor Beton bertulang 1:2:3 3,008,750.00 154,048.00 154,048.00

Dibulatkan 154,040.00

30 1 BH. JEMBATAN MASUK PLAT BETON BERTULANG 1:2:3 (S3)

0.0648 M3 Plat Cor Beton bertulang 1:2:3 3,008,750.00 194,967.00 194,967.00

Dibulatkan 194,960.00

31 1 M2. PEK. GEBALAN RUMPUT

0.1800 M3 Urugan Tanah digemburkan 69,750.00 12,555.00 12,555.00

1.0000 M2 Gebalan rumput gajah 7,500.00 7,500.00 7,500.00

1.0000 Ls Pemupukan 2,000.00 2,000.00 2,000.00 1.0000 Ls Perapihan berm 500.00 500.00 500.00 JUMLAH 22,555.00 - 22,555.00 Dibulatkan 22,550.00 32 1 BH SUMUR RESAPAN t = 1,5 m 1.9311 M3 Galian Tanah 15,600.00 30,125.16 30,125.16

0.4760 M3 Urugan Tanah kembali 7,480.00 3,560.48 3,560.48

3.2000 m2 Pas. batu-bata ad. 1 : 5 56,380.00 180,416.00 180,416.00

9.0000 Bh Suling 2 PVC Ø 1 1/4" 17,500.00 157,500.00 157,500.00

0.7041 M3 batu kali kosong 145,750.00 102,629.13 102,629.13

1.0000 kg Pas. lapisan ijuk 7,500.00 7,500.00 7,500.00

0.0471 M3 Tutup Beton Bertulang 3,008,750.00 141,712.13 141,712.13

JUMLAH 440,545.13 182,897.77 623,442.90

(5)

1 2 3 4 5 6 7 8 33 1 BH. PEK . PENANAMAN POHON PELINDUNG

0.1250 M3 Galian Tanah 15,600.00 1,950.00 1,950.00

0.0750 M3 Urugan Tanah Kembali 7,480.00 561.00 561.00

0.0250 M3 Pupuk Kandang 75,000.00 1,875.00 1,875.00 1.0000 Bh. Pohon Angsana t. 1,5 m' 25,000.00 25,000.00 25,000.00 1.0000 Ls Steger / Pengaman 2,000.00 2,000.00 2,000.00 1.0000 Ls Upah 2,200.00 2,200.00 2,200.00 JUMLAH 28,875.00 4,711.00 33,586.00 Dibulatkan 33,580.00

34 1 BH. PEK . PAPAN NAMA JALAN

0.0450 M3 Galian Tanah 15,600.00 702.00 702.00

0.0030 M3 Urugan pasir 60,000.00 180.00 180.00

0.0720 M3 Cor beton 1:3:5 469,200.00 33,782.40 33,782.40

0.0145 M3 Urugan Tanah Kembali 7,480.00 108.46 108.46

1.0000 Bh. Papan Nama Jalan 200,000.00 200,000.00 200,000.00

JUMLAH 233,962.40 810.46 234,772.86

Dibulatkan 234,770.00

35 1 M3 PEKERJAAN CUT TANAH KERAS

0.0386 Jam Boldozer D5 250,000 9,638.55 9,638.55 0.0634 Jam Excavator PC 200 225,000 14,267.60 14,267.60 0.0096 Jam Mandor 40,000 385.54 385.54 0.0386 Jam Pekerja 35,000 1,349.40 1,349.40 1.0000 Ls Alat bantu 75 75.00 75.00 JUMLAH 23,906.15 1,809.94 25,716.09 Dibulatkan 25,710.00 36 1 M3 PEKERJAAN FILL 0.0193 Jam Boldozer D5 250,000 4,819.28 4,819.28

0.0843 Jam Dump Truck 60,000 5,060.24 5,060.24

0.0386 Jam Pekerja 35,000 1,349.40 1,349.40 0.0096 Jam Mandor 40,000 385.54 385.54 1.0000 Ls Alat bantu 50 50.00 50.00 JUMLAH 9,879.52 1,784.94 11,664.46 Dibulatkan 11,660.00 1.2000 m3 Tanah Urug 50,000 60,000.00 60,000.00 JUMLAH 69,879.52 2,220.48 71,660.00 Dibulatkan 71,660.00 \\vboxsrv\conversion_tmp\scratch_4\[146701492.xls.ms_office.xls]RS 36 Cempaka Semarang, Maret 2011 Ass Man Produksi & PLPP

(6)

ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN PEMBANGUNAN RUMAH PRASARANANNYA

DI LOKASI BUMI PALIR SEJAHTERA PERUM PERUMNAS CABANG SEMARANG I

H. SATUAN HARGA UPAH JUMLAH

NO. KOEF. SAT U R A I A N. BAHAN/UPAH BAHAN TENAGA H. SATUAN

( Rp ) ( Rp ) ( Rp ) ( Rp )

1 2 3 4 5 6 7 8

1 PASANGAN BOUWPLANK / M'. 0.0054

M3 Kayu Kaso 4/6 & 2/3 900,000.00 4,860.00 - 4,860.00 0.0250

Kg Paku biasa uk. 2" - 5" 9,000.00 225.00 - 225.00 0.0070

Uph Mandor 40,000.00 - 280.00 280.00 0.0700

Uph Tukang Kayu 37,000.00 - 2,590.00 2,590.00 JUMLAH 5,085.00 2,870.00 7,955.00

M' Pas. Bouplank (Bahan 2 x pakai) 5,085.00 2,870.00 6,520.00 Dibulatkan 6,520.00 2 1 M2 PEKERJAAN STRIPPING 0.0050 Uph Mandor 40,000.00 - 200.00 200.00 0.0500 Uph Pekerja 35,000.00 - 1,750.00 1,750.00 JUMLAH - 1,950.00 1,950.00 Dibulatkan 1,950.00

3 1 M3 GALIAN TANAH BIASA SEDALAM 1 M 0.0400 Uph Mandor 40,000.00 - 1,600.00 1,600.00 0.4000 Uph Pekerja 35,000.00 - 14,000.00 14,000.00 JUMLAH - 15,600.00 15,600.00 Dibulatkan 15,600.00

4 1 M3 GALIAN TANAH KERAS SEDALAM 1 M 0.0625 Uph Mandor 40,000.00 - 2,500.00 2,500.00 0.6250 Uph Pekerja 35,000.00 - 21,875.00 21,875.00 JUMLAH - 24,375.00 24,375.00 Dibulatkan 24,370.00

5 1 M3 GALIAN TANAH CADAS SEDALAM 1 M 0.1250 Uph Mandor 40,000.00 - 5,000.00 5,000.00 1.2500 Uph Pekerja 35,000.00 - 43,750.00 43,750.00 JUMLAH - 48,750.00 48,750.00 Dibulatkan 48,750.00

6 1 M3 GALIAN TANAH LUMPUR SEDALAM 1 M 0.0823 Uph Mandor 40,000.00 - 3,292.00 3,292.00 0.8230 Uph Pekerja 35,000.00 - 28,805.00 28,805.00 JUMLAH - 32,097.00 32,097.00 Dibulatkan 32,090.00

7 1 M3 URUGAN TANAH KEMBALI. 0.0192 Uph Mandor 40,000.00 - 768.00 768.00 0.1920 Uph Pekerja 35,000.00 - 6,720.00 6,720.00 JUMLAH - 7,488.00 7,488.00 Dibulatkan 7,480.00

8 1 M3 URUGAN TANAH DARI LUAR 1.2000 M3 Tanah urug 50,000.00 60,000.00 - 60,000.00 0.0250 Uph Mandor 40,000.00 - 1,000.00 1,000.00 0.2500 Uph Pekerja 35,000.00 - 8,750.00 8,750.00 JUMLAH 60,000.00 9,750.00 69,750.00 Dibulatkan 69,750.00

9 1 M3 PEMBUANGAN TANAH SEJAUH 100 M 0.0344 Uph Mandor 40,000.00 - 1,376.00 1,376.00 0.3440 Uph Pekerja 35,000.00 - 12,040.00 12,040.00 JUMLAH - 13,416.00 13,416.00 Dibulatkan 13,410.00

(7)

1 2 3 4 5 6 7 8 10 1 M2 PERATAAN TANAH

1.0000

Unit Alat bantu 500.00 500.00 500.00 0.0125 Uph Mandor 40,000.00 500.00 500.00 0.0400 Uph Pekerja 35,000.00 1,400.00 1,400.00 JUMLAH 500.00 1,900.00 2,400.00 Dibulatkan 2,400.00

11 1 M3 URUGAN SIRTU BAWAH LANTAI 1.1000 M3 Sirtu 72,500.00 79,750.00 - 79,750.00 0.0250 Uph Mandor 40,000.00 - 1,000.00 1,000.00 0.2500 Uph Pekerja 35,000.00 - 8,750.00 8,750.00 JUMLAH 79,750.00 9,750.00 89,500.00 Dibulatkan 89,500.00

12 1 M3 URUGAN SIRTU & PEMADATAN 1.2000 M3 Sirtu 72,500.00 87,000.00 - 87,000.00 1.0000 Ls Gilas Pemadatan 10,000.00 - 10,000.00 10,000.00 0.0250 Uph Mandor 40,000.00 - 1,000.00 1,000.00 0.2500 Upah Pekerja 35,000.00 - 8,750.00 8,750.00 JUMLAH 87,000.00 19,750.00 106,750.00 Dibulatkan 106,750.00 0.2000

m3 1 M2 URUGAN SIRTU TEBAL 20 Cm 106,750.00 21,350.00 Dibulatkan 21,350.00 13 1 M3 URUGAN PADAS BAWAH LANTAI

1.2000 M3 Padas urug 45,000.00 54,000.00 - 54,000.00 0.0250 Uph Mandor 40,000.00 - 1,000.00 1,000.00 0.2500 Uph Pekerja 35,000.00 - 8,750.00 8,750.00 JUMLAH 54,000.00 9,750.00 63,750.00 Dibulatkan 63,750.00

14 1 M3 URUGAN PASIR BAWAH LANTAI & PONDASI 1.2000 M3 Pasir urug 60,000.00 72,000.00 - 72,000.00 0.0100 Uph Mandor 40,000.00 - 400.00 400.00 0.3000 Uph Pekerja 35,000.00 - 10,500.00 10,500.00 JUMLAH 72,000.00 10,900.00 82,900.00 Dibulatkan 82,900.00 15 1 M3 PAS.BATUKALI AD. 1 Pc : 5 Ps 3.4000

Zak PC (Portland Cement ) 40 kg 45,000.00 153,000.00 - 153,000.00 1.1000 M3 Batu kali 120,000.00 132,000.00 - 132,000.00 0.5440 M3 Pasir pasang 90,000.00 48,960.00 - 48,960.00 0.0750 Uph Mandor 40,000.00 - 3,000.00 3,000.00 0.6000

Uph Tukang batu 37,000.00 - 22,200.00 22,200.00 1.5000 Uph Pekerja 35,000.00 - 52,500.00 52,500.00 JUMLAH 333,960.00 77,700.00 411,660.00 Dibulatkan 411,660.00 16 1 M3 PAS.BATUKALI AD. 1 Pc : 4 Ps 4.0750

Zak PC (Portland Cement ) 40 kg 45,000.00 183,375.00 - 183,375.00 1.1000 M3 Batu kali 120,000.00 132,000.00 - 132,000.00 0.5200 M3 Pasir pasang 90,000.00 46,800.00 - 46,800.00 0.0750 Uph Mandor 40,000.00 - 3,000.00 3,000.00 0.6000

Uph Tukang batu 37,000.00 - 22,200.00 22,200.00 1.5000

Uph Pekerja 35,000.00 - 52,500.00 52,500.00 JUMLAH 362,175.00 77,700.00 439,875.00 Dibulatkan 439,870.00

17 1 M3 PAS. BATU KALI ad. 1 Pc : 3 Kp : 10 Ps 1.5250

Zak PC (Portland Cement ) 40 kg 45,000.00 68,625.00 - 68,625.00 1.1000 M3 Batu kali 120,000.00 132,000.00 - 132,000.00 0.4920 M3 Pasir pasang 90,000.00 44,280.00 - 44,280.00 0.1470 M3 Kapur 220,000.00 32,340.00 - 32,340.00 0.0750 Uph Mandor 40,000.00 - 3,000.00 3,000.00 0.6000

Uph Tukang batu 37,000.00 - 22,200.00 22,200.00 1.5000

Uph Pekerja 35,000.00 - 52,500.00 52,500.00 JUMLAH 277,245.00 77,700.00 354,945.00 Dibulatkan 354,940.00

(8)

1 2 3 4 5 6 7 8 18 1 M3 PAS. PONDASI BATU KALI KOSONG

1.1000 M3 Batu kali 120,000.00 132,000.00 - 132,000.00 0.3000 M3 Pasir Urug 60,000.00 18,000.00 - 18,000.00 0.0390 Uph Mandor 40,000.00 - 1,560.00 1,560.00 0.3900

Uph Tukang batu 37,000.00 - 14,430.00 14,430.00 0.7800

Uph Pekerja 35,000.00 - 27,300.00 27,300.00 JUMLAH 150,000.00 43,290.00 193,290.00 Dibulatkan 193,290.00

19 1 M2 PAS. BATU BATA TEBAL ½ BATA AD. 1 Pc : 3 Ps 0.3593

Zak PC (Portland Cement ) 40 kg 45,000.00 16,166.25 - 16,166.25 70.0000

Bh Batu bata uk. 5 x 11 x 22 cm 350.00 24,500.00 - 24,500.00 0.0430

M3 Pasir pasang 90,000.00 3,870.00 - 3,870.00 0.0150

Uph Mandor 40,000.00 - 600.00 600.00 0.1000

Uph Tukang batu 37,000.00 - 3,700.00 3,700.00 0.3200

Uph Pekerja 35,000.00 - 11,200.00 11,200.00 JUMLAH 44,536.25 15,500.00 60,036.25 Dibulatkan 60,030.00

20 1 M2 PAS. BATU BATA TEBAL ½ BATA AD. 1 Pc : 5 Ps 0.2680

Zak PC (Portland Cement ) 40 kg 45,000.00 12,060.00 - 12,060.00 70.0000

Bh Batu bata uk. 5 x 11 x 22 cm 350.00 24,500.00 - 24,500.00 0.0480

M3 Pasir pasang 90,000.00 4,320.00 - 4,320.00 0.0150

Uph Mandor 40,000.00 - 600.00 600.00 0.1000

Uph Tukang batu 37,000.00 - 3,700.00 3,700.00 0.3200

Uph Pekerja 35,000.00 - 11,200.00 11,200.00 JUMLAH 40,880.00 15,500.00 56,380.00 Dibulatkan 56,380.00

21 1 M' PAS. PONDASI TERAS ROLAAG BATU BATA TEBAL ½ BATA AD. 1 Pc : 3 Ps 0.0330

M3 Galian Tanah 15,600.00 - 514.80 514.80 0.2000

M2 Pas. Batu Bata Ad. 1 Pc : 3 Ps 60,030.00 12,006.00 12,006.00 JUMLAH 12,006.00 514.80 12,520.80 Dibulatkan 12,520.00

22 1 M2 PAS.BATUBATA TEBAL ½ AD. 1 Pc : 3 Kpr : 10 Ps 0.1125

Zak PC (Portland Cement ) 40 kg 45,000.00 5,062.50 - 5,062.50 70.0000

Bh Batu bata uk. 5 x 11 x 22 cm 350.00 24,500.00 - 24,500.00 0.0500 M3 Pasir pasang 90,000.00 4,500.00 - 4,500.00 0.0150 M3 Kapur 220,000.00 3,300.00 - 3,300.00 0.0250 Uph Mandor 40,000.00 - 1,000.00 1,000.00 0.1000

Uph Tukang batu 37,000.00 - 3,700.00 3,700.00 0.3200

Uph Pekerja 35,000.00 - 11,200.00 11,200.00 JUMLAH 37,362.50 15,900.00 53,262.50 Dibulatkan 53,260.00

23 1 M2 PAS. DINDING CONBLOCK 1:5 0.0816

zak PC (Portland Cement ) 40 kg 45,000.00 3,672.00 - 3,672.00 12.5000 bh Conblock 2,800.00 35,000.00 - 35,000.00 0.0150 m3 Pasir pasang 90,000.00 1,350.00 - 1,350.00 0.0150 upah Mandor 40,000.00 - 600.00 600.00 0.1650

upah Tukang batu 37,000.00 - 6,105.00 6,105.00 0.1500

upah Pekerja 35,000.00 - 5,250.00 5,250.00 JUMLAH 40,022.00 11,955.00 51,977.00 Dibulatkan 51,970.00

24 1 M' PAS. PONDASI TERAS ROLAAG CONBLOCK AD. 1 Pc : 5 Ps 0.0330

M3 Galian Tanah 15,600.00 - 514.80 514.80 0.2000

M2 Pas. Conblock Ad. 1 Pc : 5 Ps 51,970.00 10,394.00 - 10,394.00 JUMLAH 10,394.00 514.80 10,908.80 Dibulatkan 10,900.00

25 1 BH PAS. BAK KONTROL 30X30 0.7392

M2 Pas. Bt. Bata ad. 1 Pc : 3 Ps 60,030.00 44,374.18 - 44,374.18 0.8910

M2 Pleteran ad. 1 Pc : 3 Ps 24,480.00 21,811.68 - 21,811.68 JUMLAH 66,185.86 - 66,185.86 Dibulatkan 66,180.00

(9)

1 2 3 4 5 6 7 8 26 1 M2 PLESTERAN DINDING AD. 1 Pc : 3 Ps, TEBAL 15 MM

0.1620

Zak PC (Portland Cement ) 40 kg 45,000.00 7,290.00 - 7,290.00 0.0190 M3 Pasir pasang 90,000.00 1,710.00 - 1,710.00 0.0120 OH Mandor 40,000.00 - 480.00 480.00 0.1100 OH Tukang batu 37,000.00 - 4,070.00 4,070.00 0.1200 OH Pekerja 35,000.00 - 4,200.00 4,200.00 JUMLAH 9,000.00 8,750.00 17,750.00 Dibulatkan 17,750.00

27 1 M2 PLESTERAN DINDING AD. 1 Pc : 4 Ps, TEBAL 15 MM 0.1300

Zak PC (Portland Cement ) 40 kg 45,000.00 5,850.00 - 5,850.00 0.0200 M3 Pasir pasang 90,000.00 1,800.00 - 1,800.00 0.0200 OH Mandor 40,000.00 - 800.00 800.00 0.1500 OH Tukang batu 37,000.00 - 5,550.00 5,550.00 0.2000 OH Pekerja 35,000.00 - 7,000.00 7,000.00 JUMLAH 7,650.00 13,350.00 21,000.00 Dibulatkan 21,000.00

28 1 M2 PLESTERAN DINDING AD. 1 Pc : 5 Ps, TEBAL 15 MM 0.1080

Zak PC (Portland Cement ) 40 kg 45,000.00 4,860.00 - 4,860.00 0.0220 M3 Pasir pasang 90,000.00 1,980.00 - 1,980.00 0.0200 OH Mandor 40,000.00 - 800.00 800.00 0.1500 OH Tukang batu 37,000.00 - 5,550.00 5,550.00 0.2000 OH Pekerja 35,000.00 - 7,000.00 7,000.00 JUMLAH 6,840.00 13,350.00 20,190.00 Dibulatkan 20,190.00

29 1 M2 PLESTERAN DINDING AD. 1 Pc : 3 Kp : 10 Ps, TEBAL 15 MM 0.0460

Zak PC (Portland Cement ) 40 kg 45,000.00 2,070.00 - 2,070.00 0.0060 M3 Kapur 220,000.00 1,320.00 - 1,320.00 0.0140 M3 Pasir pasang 90,000.00 1,260.00 - 1,260.00 0.0200 OH Mandor 40,000.00 - 800.00 800.00 0.1500 OH Tukang batu 37,000.00 - 5,550.00 5,550.00 0.2000 OH Pekerja 35,000.00 - 7,000.00 7,000.00 JUMLAH 4,650.00 13,350.00 18,000.00 Dibulatkan 18,000.00

30 1 M2 PLESTERAN DINDING AD. 1 Pc : 3 Ps, TEBAL 20 MM 0.2700

Zak PC (Portland Cement ) 40 kg 45,000.00 12,150.00 - 12,150.00 0.0260

M3 Pasir pasang 90,000.00 2,340.00 - 2,340.00 0.0075

Uph Mandor 40,000.00 - 300.00 300.00 0.1200

Uph Tukang batu 37,000.00 - 4,440.00 4,440.00 0.1500

Uph Pekerja 35,000.00 - 5,250.00 5,250.00 JUMLAH 14,490.00 9,990.00 24,480.00 Dibulatkan 24,480.00

31 1 M2 PLESTERAN DINDING AD. 1 Pc : 4 Ps, TEBAL 20 MM 0.2170

Zak PC (Portland Cement ) 40 kg 45,000.00 9,765.00 - 9,765.00 0.0280

M3 Pasir pasang 90,000.00 2,520.00 - 2,520.00 0.0075

Uph Mandor 40,000.00 - 300.00 300.00 0.1200

Uph Tukang batu 37,000.00 - 4,440.00 4,440.00 0.1500

Uph Pekerja 35,000.00 - 5,250.00 5,250.00 JUMLAH 12,285.00 9,990.00 22,275.00 Dibulatkan 22,270.00

32 1 M2 PLESTERAN DINDING AD. 1 Pc : 5 Ps, TEBAL 20 MM 0.1823

Zak PC (Portland Cement ) 40 kg 45,000.00 8,201.25 - 8,201.25 0.0280

M3 Pasir pasang 90,000.00 2,520.00 - 2,520.00 0.0075

Uph Mandor 40,000.00 - 300.00 300.00 0.1200

Uph Tukang batu 37,000.00 - 4,440.00 4,440.00 0.1500

Uph Pekerja 35,000.00 - 5,250.00 5,250.00 JUMLAH 10,721.25 9,990.00 20,711.25 Dibulatkan 20,710.00

(10)

1 2 3 4 5 6 7 8 33 1 M2 PLESTERAN DINDING AD. 1 Pc : 3 Kp : 10 Ps, TEBAL 20 MM

0.0818

Zak PC (Portland Cement ) 40 kg 45,000.00 3,678.75 - 3,678.75 0.0080 M3 Kapur 220,000.00 1,760.00 - 1,760.00 0.0187 M3 Pasir pasang 90,000.00 1,683.00 - 1,683.00 0.0075 Uph Mandor 40,000.00 - 300.00 300.00 0.1200

Uph Tukang batu 37,000.00 - 4,440.00 4,440.00 0.1500

Uph Pekerja 35,000.00 - 5,250.00 5,250.00 JUMLAH 7,121.75 9,990.00 17,111.75 Dibulatkan 17,110.00

34 1 M2 PLESTERAN BAN-BANAN AD. 1 Pc : 5 Ps, LEBAR 10 CM 0.0125

Zak PC (Portland Cement ) 40 kg 45,000.00 562.50 - 562.50 0.0013

M3 Pasir pasang 90,000.00 117.00 - 117.00 0.0030

Uph Mandor 40,000.00 - 120.00 120.00 0.3800

Uph Tukang batu 37,000.00 - 14,060.00 14,060.00 0.0570 Uph Pekerja 35,000.00 - 1,995.00 1,995.00 JUMLAH 679.50 16,175.00 16,854.50 Dibulatkan 16,850.00 35 1 M2 ACIAN 0.0813

Zak PC (Portland Cement ) 40 kg 45,000.00 3,656.25 - 3,656.25 0.0075

Uph Mandor 40,000.00 - 300.00 300.00 0.0750

Uph Tukang batu 37,000.00 - 2,775.00 2,775.00 0.0500

Uph Pekerja 35,000.00 - 1,750.00 1,750.00 JUMLAH 3,656.25 4,825.00 8,481.25 Dibulatkan 8,480.00

36 1 M3 MEMBUAT BETON AD. 1 Pc : 3 Ps : 5 KrL 5.4500

Zak PC (Portland Cement ) 40 kg 45,000.00 245,250.00 - 245,250.00 0.5200 M3 Pasir beton 120,000.00 62,400.00 - 62,400.00 0.8700 M3 Koral beton 105,000.00 91,350.00 - 91,350.00 0.0800 Uph Mandor 40,000.00 - 3,200.00 3,200.00 0.2500

Uph Tukang batu 37,000.00 - 9,250.00 9,250.00 1.6500

Uph Pekerja 35,000.00 - 57,750.00 57,750.00 JUMLAH 399,000.00 70,200.00 469,200.00 Dibulatkan 469,200.00

37 1 M2 PAS. LANTAI BETON AD. 1 Pc : 3 Ps : 5 KrL Tbl. 5 Cm (DI ACI) 0.0500

M3 Beton Rabat ad. 1 Pc : Ps : 5 Krl 469,200.00 23,460.00 23,460.00 1.0000

M2 Acian 8,480.00 8,480.00 8,480.00 JUMLAH 31,940.00 - 31,940.00 Dibulatkan 31,940.00

38 1 M2 PAS. BETON AD. 1 Pc : 3 Ps : 5 KrL Tbl. 6 Cm 0.0800

M3 Beton Rabat ad. 1 Pc : Ps : 5 Krl 469,200.00 37,536.00 37,536.00 Dibulatkan 37,530.00

39 1 M2 PAS. BETON AD. 1 Pc : 3 Ps : 5 KrL Tbl. 8 Cm 0.0800

M3 Beton Rabat ad. 1 Pc : Ps : 5 Krl 469,200.00 37,536.00 37,536.00 Dibulatkan 37,530.00

40 1 M3 MEMBUAT BETON BERTULANG AD. 1 Pc : 2 Ps : 3 KrL 8.4000

Zak PC (Portland Cement ) 40 kg 45,000.00 378,000.00 - 378,000.00 0.5400 M3 Pasir beton 120,000.00 64,800.00 - 64,800.00 0.8100 M3 Koral beton 105,000.00 85,050.00 - 85,050.00 1.0000 Uph Mandor 40,000.00 - 40,000.00 40,000.00 0.3500

Uph Tukang batu 37,000.00 - 12,950.00 12,950.00 2.0000

Uph Pekerja 35,000.00 - 70,000.00 70,000.00 JUMLAH 527,850.00 122,950.00 650,800.00 Dibulatkan 650,800.00

41 PEKERJAAN PEMBESIAN 1 KG DENGAN BESI POLOS/ULIR 1.0500

KG Besi beton (polos/ulir) 13,000.00 13,650.00 - 13,650.00 0.0150

KG Kawat beton 12,000.00 180.00 - 180.00 0.0003

Uph Mandor 40,000.00 - 12.00 12.00 0.0100

Uph Tukang besi 37,000.00 - 370.00 370.00 0.0100

Uph Pekerja 35,000.00 - 350.00 350.00 JUMLAH 13,830.00 732.00 14,562.00 Dibulatkan 14,560.00

(11)

1 2 3 4 5 6 7 8 42 PEKERJAAN PEMBESIAN SLOOF 120 KG BESI (Ø 8 mm & Ø 6 mm)

120.0000 KG Besi beton (polos/ulir) 14,560.00 1,747,200.00 - 1,747,200.00 JUMLAH 1,747,200.00 - 1,747,200.00 Dibulatkan 1,747,200.00

43 PEKERJAAN PEMBESIAN RING BALK 120 KG BESI (Ø 7 mm & Ø 4 mm)

120.0000 KG Besi beton (polos/ulir) 14,560.00 1,747,200.00 - 1,747,200.00 JUMLAH 1,747,200.00 - 1,747,200.00 Dibulatkan 1,747,200.00

44 PEKERJAAN PEMBESIAN KOLOM 140 KG BESI (Ø 7 mm & Ø 4 mm)

140.0000 KG Besi beton (polos/ulir) 14,560.00 2,038,400.00 - 2,038,400.00 JUMLAH 2,038,400.00 - 2,038,400.00 Dibulatkan 2,038,400.00

45 PEKERJAAN PEMBESIAN JEMBATAN MASUK RUMAH 40 KG BESI (Ø 8 mm & Ø 6 mm) 40.0000

KG Besi beton (polos/ulir) 14,560.00 582,400.00 - 582,400.00 JUMLAH 582,400.00 - 582,400.00 Dibulatkan 582,400.00

46 PEKERJAAN PEMBESIAN TUTUP BEERPUT 40 KG BESI (Ø 8 mm & Ø 6 mm) 40.0000

KG Besi beton (polos/ulir) 14,560.00 582,400.00 - 582,400.00 JUMLAH 582,400.00 - 582,400.00 Dibulatkan 582,400.00 47 1 M2 PAPAN BEGESTING 0.1000 Ltr Minyak Bekesting 4,500.00 450.00 - 450.00 0.3000

Kg Paku biasa uk. 2" - 5" 9,000.00 2,700.00 - 2,700.00 0.0440 M3 Kayu Bekisting 900,000.00 39,600.00 - 39,600.00 0.0260 OH Mandor 40,000.00 1,040.00 1,040.00 0.2600 OH Tukang Kayu 37,000.00 9,620.00 9,620.00 0.3000 OH Pekerja Biasa 35,000.00 10,500.00 10,500.00 JUMLAH 42,750.00 21,160.00 63,910.00 Dibulatkan 63,910.00 Pasangan Bekisting untuk 1 M3 Beton

5.0000

x Bekisting 63,910.00 319,550.00

Dibulatkan 319,550.00

48 1 M3 PEK. BETON TULANG 100 kg 1.0000

M3 PAS. COR BETON AD. 1:2:3 Rp. 650,800.00

1.0000

Ls PEMBESIAN 140 KG Rp. 2,038,400.00

1.0000

Ls PAPAN BEGESTING 1M3 BETON Rp. 319,550.00

JUMLAH Rp. 3,008,750.00

Dibulatkan 3,008,750.00

49 1 M3 PEK. BETON TULANG 110 kg 1.0000

M3 PAS. COR BETON AD. 1:2:3 Rp. 650,800.00

1.0000

Ls PEMBESIAN 110 KG Rp. 2,038,400.00

1.0000

Ls PAPAN BEGESTING 1M3 BETON Rp. 319,550.00

JUMLAH Rp. 3,008,750.00

Dibulatkan 3,008,750.00

50 1 M3 PEK. BETON TULANG 125 kg 1.0000

M3 PAS. COR BETON AD. 1:2:3 Rp. 650,800.00

1.0000

Ls PEMBESIAN 125 KG Rp. 1,747,200.00

1.0000

Ls PAPAN BEGESTING 1M3 BETON Rp. 319,550.00

JUMLAH Rp. 2,717,550.00

Dibulatkan 2,717,550.00 `

51 1 M3 PEK. BETON TULANG 160 kg 1.0000

M3 PAS. COR BETON AD. 1:2:3 Rp. 650,800.00

1.0000

Ls PEMBESIAN 160 KG Rp. 582,400.00

1.0000

Ls PAPAN BEGESTING 1M3 BETON Rp. 319,550.00

JUMLAH Rp. 1,552,750.00

(12)

1 2 3 4 5 6 7 8 52 1 M3 PEK. BETON BERTULANG 70 kg

1.0000

m3 PAS. COR BETON AD. 1:2:3 Rp. 650,800.00

1.0000

LS PEMBESIAN 70 KG Rp. 1,747,200.00

1.0000

LS PAPAN BEGESTING 1 m3 BETON Rp. 319,550.00

JUMLAH Rp. 2,717,550.00

Dibulatkan 2,717,550.00

1 BH PLAT JEMBATAN MASUK RUMAH UK. 09 X0.8 X 0.008 : Rp. 156,530.88

53 1 M2 LANTAI KERAMIK WARNA 30/30 0.2845

Zak PC (Portland Cement ) 40 kg 45,000.00 12,802.50 - 12,802.50 0.0360 M3 Pasir Pasang 120,000.00 4,320.00 - 4,320.00 1.0500 M2 Keramik 30/30 (Motif) 29,000.00 30,450.00 - 30,450.00 0.0375 Kg PC Warna u/ Naad 6,000.00 225.00 - 225.00 0.0450 Uph Mandor 40,000.00 - 1,800.00 1,800.00 0.1500

Uph Tukang batu 37,000.00 - 5,550.00 5,550.00 0.3000

Uph Pekerja 35,000.00 - 10,500.00 10,500.00 JUMLAH 47,797.50 17,850.00 65,647.50 Dibulatkan 65,640.00

54 1 M2 LANTAI KERAMIK POLOS 30/30 0.2845

Zak PC (Portland Cement ) 40 kg 45,000.00 12,802.50 - 12,802.50 0.0360 M3 Pasir Pasang 90,000.00 3,240.00 - 3,240.00 1.0500 m2 Keramik 30/30 45,000.00 47,250.00 - 47,250.00 0.0375 Kg PC Warna u/ Naad 6,000.00 225.00 - 225.00 0.0300 Uph Mandor 40,000.00 - 1,200.00 1,200.00 0.1500

Uph Tukang batu 37,000.00 - 5,550.00 5,550.00 0.3000

Uph Pekerja 35,000.00 - 10,500.00 10,500.00 JUMLAH 63,517.50 17,250.00 80,767.50 Dibulatkan 80,760.00

55 1 M2 LANTAI KERAMIK POLOS / WARNA 20/20 0.2845

Zak PC (Portland Cement ) 40 kg 45,000.00 12,802.50 - 12,802.50 0.0360

M3 Pasir Pasang 90,000.00 3,240.00 - 3,240.00 1.0500

m2 Keramik 20/20 35,000.00 36,750.00 - 36,750.00 0.0375

Zak PC Warna u/ Naad 6,000.00 225.00 - 225.00 0.0300

Uph Mandor 40,000.00 - 1,200.00 1,200.00 0.1500

Uph Tukang batu 37,000.00 - 5,550.00 5,550.00 0.3000

Uph Pekerja 35,000.00 - 10,500.00 10,500.00 JUMLAH 53,017.50 17,250.00 70,267.50 Dibulatkan 70,260.00

56 1 M2 DINDING KERAMIK 10/20 & 20/25 0.2325

Zak PC (Portland Cement ) 40 kg 45,000.00 10,462.50 - 10,462.50 0.0180

M3 Pasir Pasang 45,000.00 810.00 - 810.00 1.0250

m2 Keramik 10/20 40,000.00 41,000.00 - 41,000.00 1.0500

Zak PC Warna u/ Naad 45,000.00 47,250.00 - 47,250.00 0.0350

Uph Mandor 6,000.00 - 210.00 210.00 0.1750

Uph Tukang batu 40,000.00 - 7,000.00 7,000.00 0.3500

Uph Pekerja 37,000.00 - 12,950.00 12,950.00 JUMLAH 99,522.50 20,160.00 119,682.50 Dibulatkan 119,680.00

57 1 M2 DINDING BATU ALAM 0.2938

Zak PC (Portland Cement ) 40 kg 45,000.00 13,218.75 - 13,218.75 0.0350 M3 Pasir Pasang 90,000.00 3,150.00 - 3,150.00 1.0500 m2 Batu Paros/Palimanan 130,000.00 136,500.00 - 136,500.00 0.0500 Uph Mandor 40,000.00 - 2,000.00 2,000.00 0.2500

Uph Tukang batu 37,000.00 - 9,250.00 9,250.00 0.5000

Uph Pekerja 35,000.00 - 17,500.00 17,500.00 JUMLAH 152,868.75 28,750.00 181,618.75 Dibulatkan 181,610.00

58 1 M3 PEKERJAAN KOZEN KAYU 1.2000

M3 Kayu lokal Keras 6/12 3,800,000.00 4,560,000.00 - 4,560,000.00 1.2500

kg Paku 9,000.00 11,250.00 - 11,250.00 0.3000

Uph Mandor 40,000.00 - 12,000.00 12,000.00 18.0000

Uph Tukang kayu 37,000.00 - 666,000.00 666,000.00 6.0000 Uph Pekerja 35,000.00 - 210,000.00 210,000.00 JUMLAH 4,571,250.00 888,000.00 5,459,250.00 Dibulatkan 5,459,250.00 1 m3 = 138.89 m' 1.0000 m' Kozen jadi 39,306.29 39,306.29 Dibulatkan 39,300.00

(13)

1 2 3 4 5 6 7 8

59 1 BH PEKERJAAN KOZEN - KOZEN P.1 0.0350

M3 Kayu lokal Keras 6/12 5,459,250.00 191,030.08 - 191,030.08 6.0000

bh Angkur 3,000.00 18,000.00 - 18,000.00 0.0088

Uph Mandor 40,000.00 - 350.00 350.00 0.3500

Uph Tukang kayu 37,000.00 - 12,950.00 12,950.00 0.0875

Uph Pekerja 35,000.00 - 3,062.50 3,062.50 JUMLAH 209,030.08 16,362.50 225,392.58 Dibulatkan 225,390.00

60 1 BH PEKERJAAN KOZEN - KOZEN P.2 0.0343

M3 Kayu lokal Keras 6/12 5,459,250.00 187,099.42 - 187,099.42 6.0000

bh Angkur 3,000.00 18,000.00 - 18,000.00 0.0088

Uph Mandor 40,000.00 - 350.00 350.00 0.3500

Uph Tukang kayu 37,000.00 - 12,950.00 12,950.00 0.0875

Uph Pekerja 35,000.00 - 3,062.50 3,062.50 JUMLAH 205,099.42 16,362.50 221,461.92 Dibulatkan 221,460.00

61 1 BH PEKERJAAN KOZEN - KOZEN PJ.1 0.0491

M3 Kayu lokal Keras 6/12 5,459,250.00 268,071.01 268,071.01 6.0000

bh Angkur 3,000.00 18,000.00 18,000.00 0.0113

Uph Mandor 40,000.00 - 450.00 450.00 0.4500

Uph Tukang kayu 37,000.00 - 16,650.00 16,650.00 0.1125

Uph Pekerja 35,000.00 - 3,937.50 3,937.50 JUMLAH 286,071.01 21,037.50 307,108.51 Dibulatkan 307,100.00

62 1 BH PEKERJAAN KOZEN - KOZEN PJ.2 0.0870

M3 Kayu lokal Keras 6/12 5,459,250.00 474,954.75 474,954.75 6.0000

bh Angkur 3,000.00 18,000.00 18,000.00 0.0800

Uph Mandor 40,000.00 - 3,200.00 3,200.00 0.4000

Uph Tukang kayu 37,000.00 - 14,800.00 14,800.00 0.4000

Uph Pekerja 35,000.00 - 14,000.00 14,000.00 JUMLAH 492,954.75 32,000.00 524,954.75 Dibulatkan 524,950.00

63 1 BH PEKERJAAN KOZEN - KOZEN J.2 0.0419

M3 Kayu lokal Keras 6/12 5,459,250.00 228,764.41 - 228,764.41 4.0000

bh Angkur 3,000.00 12,000.00 - 12,000.00 0.0563

Uph Mandor 40,000.00 - 2,250.00 2,250.00 0.4500

Uph Tukang kayu 37,000.00 - 16,650.00 16,650.00 0.1125

Uph Pekerja 35,000.00 - 3,937.50 3,937.50 JUMLAH 240,764.41 22,837.50 263,601.91 Dibulatkan 263,600.00

64 1 BH PEKERJAAN KOZEN - KOZEN J.1 0.0308

M3 Kayu lokal Keras 6/12 5,459,250.00 168,232.25 - 168,232.25 4.0000

bh Angkur 3,000.00 12,000.00 - 12,000.00 0.0400

Uph Mandor 40,000.00 - 1,600.00 1,600.00 0.3200

Uph Tukang kayu 37,000.00 - 11,840.00 11,840.00 0.0800

Uph Pekerja 35,000.00 - 2,800.00 2,800.00 JUMLAH 180,232.25 16,240.00 196,472.25 Dibulatkan 196,470.00

65 1 BH PEKERJAAN KOZEN - KOZEN BV. 1 0.0173

M3 Kayu lokal Keras 6/12 5,459,250.00 94,335.84 - 94,335.84 4.0000

bh Angkur 3,000.00 12,000.00 - 12,000.00 0.0256

Uph Mandor 40,000.00 - 1,025.00 1,025.00 0.1000

Uph Tukang kayu 37,000.00 - 3,700.00 3,700.00 0.1563

Uph Pekerja 35,000.00 - 5,468.75 5,468.75 JUMLAH 106,335.84 10,193.75 116,529.59 Dibulatkan 116,520.00

66 1 BH PEKERJAAN KOZEN - KOZEN BV. T.36. (Teras) 0.0144

M3 Kayu lokal Keras 6/12 5,459,250.00 78,613.20 - 78,613.20 4.0000

bh Angkur 3,000.00 12,000.00 - 12,000.00 0.0063

Uph Mandor 40,000.00 - 250.00 250.00 0.0400

Uph Tukang kayu 37,000.00 - 1,480.00 1,480.00 0.0625

Uph Pekerja 35,000.00 - 2,187.50 2,187.50 JUMLAH 90,613.20 3,917.50 94,530.70 Dibulatkan 94,530.00 VOLUME DISESUAIKAN DG

(14)

1 2 3 4 5 6 7 8

67 1 BH PEKERJAAN KOZEN - KOZEN BV.1 ( T.70 ) 0.0162

M3 Kayu lokal Keras 6/12 5,459,250.00 88,204.01 - 88,204.01 4.0000

bh Angkur 500.00 2,000.00 - 2,000.00 0.0063

Uph Mandor 40,000.00 - 250.00 250.00 0.0400

Uph Tukang kayu 37,000.00 - 1,480.00 1,480.00 0.0625

Uph Pekerja 35,000.00 - 2,187.50 2,187.50 JUMLAH 90,204.01 3,917.50 94,121.51 Dibulatkan 94,120.00

68 1BH.PAS.DAUN PINTU DBL TRIPLEK. ( P.1 ) uk. 82 x 201 cm 0.0240

M3 Kayu lokal Keras 4/10 3,500,000.00 83,947.54 - 83,947.54 2.0000 lb Triplex 3 mm 32,500.00 65,000.00 - 65,000.00 0.0500 KG Paku 9,000.00 450.00 - 450.00 0.1000 KG Lem 7,500.00 750.00 - 750.00 1.0000 set Engsel 4" 7,000.00 7,000.00 - 7,000.00 0.0750 Uph Mandor 40,000.00 - 3,000.00 3,000.00 1.5000

Uph Tukang kayu 37,000.00 - 55,500.00 55,500.00 0.7500

Uph Pekerja 35,000.00 - 26,250.00 26,250.00 JUMLAH 157,147.54 84,750.00 241,897.54 Dibulatkan 241,890.00

69 1BH.PAS.DAUN PINTU DBL TRIPLEK. ( P.2 ) uk. 72 x 201 cm 0.0211

M3 Kayu lokal Keras 6/12 3,500,000.00 73,941.00 - 73,941.00 2.0000 lb Triplex 32,500.00 65,000.00 - 65,000.00 0.0500 KG Paku 9,000.00 450.00 - 450.00 0.1000 KG Lem 7,500.00 750.00 - 750.00 1.0000 set Engsel 4" 7,000.00 7,000.00 - 7,000.00 0.0875 Uph Mandor 40,000.00 3,500.00 3,500.00 1.7500

Uph Tukang kayu 37,000.00 - 64,750.00 64,750.00 0.8750

Uph Pekerja 35,000.00 - 30,625.00 30,625.00 JUMLAH 147,141.00 98,875.00 246,016.00 Dibulatkan 246,010.00

70 1 BH. PAS. DAUN PINTU PANIL TRIPLEK 6 MM ( P1) UK. 82 X 201 Cm 0.0360

M3 Kayu lokal Keras 6/12 3,500,000.00 126,152.95 - 126,152.95 0.5000

lb Triplex 6 mm 65,000.00 32,500.00 - 32,500.00 0.0500

KG Paku biasa uk. 2" - 5" 9,000.00 450.00 - 450.00 1.0000

set Engsel 4" 7,000.00 7,000.00 - 7,000.00 0.1000

Uph Mandor 40,000.00 - 4,000.00 4,000.00 2.0000

Uph Tukang kayu 37,000.00 - 74,000.00 74,000.00 1.0000

Uph Pekerja 35,000.00 - 35,000.00 35,000.00 JUMLAH 166,102.95 113,000.00 279,102.95 Dibulatkan 279,100.00

71 1 BH. PAS. DAUN PINTU PANIL KAYU LOKAL (P1) UK. 82 X 201 Cm 1.0000

bh Daun Pintu Panil kayu lokal 320,000.00 320,000.00 - 320,000.00 1.0000 set Engsel 4" 7,000.00 7,000.00 - 7,000.00 1.0000 bh Grendel 2,500.00 2,500.00 - 2,500.00 1.0000 bh Handel Pintu 3,500.00 3,500.00 1.00 3,501.00 0.0417 Uph Mandor 40,000.00 - 1,666.67 1,666.67 1.2500

Uph Tukang kayu 37,000.00 - 46,250.00 46,250.00 0.4167

Uph Pekerja 35,000.00 - 14,583.33 14,583.33 JUMLAH 333,000.00 62,501.00 395,501.00 Dibulatkan 395,500.00

72 1 BH. PAS. KUNCI 2 SLAAG SETARA YALE/BELUCI 1.0000

bh Kunci 2 slaag 60,000.00 60,000.00 - 60,000.00 0.0050

Uph Mandor 40,000.00 - 200.00 200.00 0.5000

Uph Tukang kayu 37,000.00 - 18,500.00 18,500.00 0.0100

Uph Pekerja 35,000.00 - 350.00 350.00 JUMLAH 60,000.00 19,050.00 79,050.00 Dibulatkan 79,050.00

73 1 BH. PAS. KUNCI 2 SLAAG SETARA ROYAL 1.0000

bh Kunci 2 slaag 30,000.00 30,000.00 - 30,000.00 0.0035

Uph Mandor 40,000.00 - 140.00 140.00 0.3500

Uph Tukang kayu 37,000.00 - 12,950.00 12,950.00 0.0100

Uph Pekerja 35,000.00 - 350.00 350.00 JUMLAH 30,000.00 13,440.00 43,440.00 Dibulatkan 43,440.00

(15)

1 2 3 4 5 6 7 8 74 1BH.PAS.DAUN PINTU PVC KM/WC ( LENGKAP)

1.0000

Set Daun Pintu PVC lengkap 140,000.00 140,000.00 - 140,000.00 0.0150

Uph Mandor 40,000.00 - 600.00 600.00 0.7500

Uph Tukang kayu 37,000.00 - 27,750.00 27,750.00 0.1500

Uph Pekerja 35,000.00 - 5,250.00 5,250.00 JUMLAH 140,000.00 33,600.00 173,600.00 Dibulatkan 173,600.00

75 1 BH. PAS. DAUN JENDELA. Uk. 0.62 x 1,02 ( J1 ) 0.0105

M3 Kayu lokal Keras 6/12 3,800,000.00 39,995.76 - 39,995.76 0.0600

kg Paku biasa uk. 2" - 5" 9,000.00 540.00 - 540.00 0.8000 M2 Kaca polos tbl. 3 mm 40,000.00 32,000.00 - 32,000.00 1.0000 set Engsel 3" 4,500.00 4,500.00 - 4,500.00 1.0000 bh Grendel 2,500.00 2,500.00 - 2,500.00 2.0000 bh Hak angin 3,000.00 6,000.00 - 6,000.00 0.0225 Uph Mandor 40,000.00 - 900.00 900.00 0.9000

Uph Tukang kayu 37,000.00 - 33,300.00 33,300.00 0.2250

Uph Pekerja 35,000.00 - 7,875.00 7,875.00 JUMLAH 85,535.76 42,075.00 127,610.76 Dibulatkan 127,610.00

76 1 BH. PAS. DAUN JENDELA. Uk.0,62 x 1,40 ( PJ2) 0.0125

M3 Kayu lokal Keras 6/12 3,800,000.00 47,369.28 - 47,369.28 0.0600

kg Paku biasa uk. 2" - 5" 9,000.00 540.00 - 540.00 1.0000 M2 Kaca polos tbl. 3 mm 40,000.00 40,000.00 - 40,000.00 1.0000 set Engsel 3" 4,500.00 4,500.00 - 4,500.00 1.0000 bh Grendel 2,500.00 2,500.00 - 2,500.00 2.0000 bh Hak angin 3,000.00 6,000.00 - 6,000.00 0.0250 Uph Mandor 40,000.00 - 1,000.00 1,000.00 1.0000

Uph Tukang kayu 37,000.00 - 37,000.00 37,000.00 0.2500

Uph Pekerja 35,000.00 - 8,750.00 8,750.00 JUMLAH 100,909.28 46,750.00 147,659.28 Dibulatkan 147,650.00

77 1 M2 PASANG KACA POLOS t = 3 mm 4.0000

M' List kaca kayu lokal 1,500.00 6,000.00 - 6,000.00 1.0000

M2 Kaca polos tbl. 3 mm 40,000.00 40,000.00 - 40,000.00 0.0500

set Paku triplek 350.00 17.50 - 17.50 0.0050

Uph Mandor 40,000.00 - 200.00 200.00 0.1000

Uph Tukang kayu 37,000.00 - 3,700.00 3,700.00 0.0500

Uph Pekerja 35,000.00 - 1,750.00 1,750.00 JUMLAH 46,017.50 5,650.00 51,667.50 Dibulatkan 51,660.00

78 1 M2 PASANG KACA BURAM/ES t = 3 mm 4.0000

M' List kaca kayu lokal 1,500.00 6,000.00 - 6,000.00 1.0000

M2 Kaca Es tbl. 3 mm 40,000.00 40,000.00 - 40,000.00 0.0500

set Paku triplek 350.00 17.50 - 17.50 0.0050

Uph Mandor 40,000.00 - 200.00 200.00 0.1000

Uph Tukang kayu 37,000.00 - 3,700.00 3,700.00 0.0500

Uph Pekerja 35,000.00 - 1,750.00 1,750.00 JUMLAH 46,017.50 5,650.00 51,667.50 Dibulatkan 51,660.00

79 1 M3 PASANG BALOK GORDING / NOCK / JURAI / SOPI 6/12 1.1000

M3 Kayu lokal Keras 6/12 3,500,000.00 3,850,000.00 - 3,850,000.00 15.0000

kg Besi Strip 10,000.00 150,000.00 - 150,000.00 3.0000

kg Paku biasa uk. 2" - 5" 10,000.00 30,000.00 30,000.00 0.2000

Uph Mandor 40,000.00 - 8,000.00 8,000.00 7.9000

Uph Tukang kayu 37,000.00 - 292,300.00 292,300.00 2.4000 Uph Pekerja 35,000.00 - 84,000.00 84,000.00 JUMLAH 4,030,000.00 384,300.00 4,414,300.00 Dibulatkan 4,414,300.00 1 m3 = 138.89 m' 1.0000

m' Balok Gording/Nock/Jurai/Sopi uk. 6/12 cm 31,782.71 31,782.71 Dibulatkan 31,780.00

(16)

1 2 3 4 5 6 7 8 80 1 M' PAS. LISTPLANK KAYU 3/20

0.0072

M3 Kayu Papan lokal Keras 2,200,000.00 15,840.00 - 15,840.00 0.0375

Kg. Paku biasa uk. 2" - 5" 9,000.00 337.50 - 337.50 0.0050

Uph Mandor 40,000.00 - 200.00 200.00 0.2000

Uph Tukang Kayu 37,000.00 - 7,400.00 7,400.00 0.1000

Uph Pekerja 35,000.00 - 3,500.00 3,500.00 JUMLAH 16,177.50 11,100.00 27,277.50 Dibulatkan 27,270.00

81 1 M' PAS. LISTPLANK KAYU 2/20 0.0044

M3 Kayu Papan lokal Keras 2,200,000.00 9,680.00 - 9,680.00 0.0500

Kg. Paku biasa uk. 2" - 5" 9,000.00 450.00 - 450.00 0.0500

Uph Mandor 40,000.00 - 2,000.00 2,000.00 0.1000

Uph Tukang Kayu 37,000.00 - 3,700.00 3,700.00 0.1000

Uph Pekerja 35,000.00 - 3,500.00 3,500.00 JUMLAH 10,130.00 9,200.00 19,330.00 Dibulatkan 19,330.00

82 1 M' PAS. LISTPLANK CEMENT SILICA UK. 0.8/20 1.0000

M' Kalsiplank/Woodplank 12,500.00 12,500.00 - 12,500.00 0.0100

Kg. Paku biasa Triplek 10,000.00 100.00 - 100.00 0.0025

Uph Mandor 40,000.00 - 100.00 100.00 0.0250

Uph Tukang Kayu 37,000.00 - 925.00 925.00 0.0125

Uph Pekerja 35,000.00 - 437.50 437.50 JUMLAH 12,600.00 1,462.50 14,062.50 Dibulatkan 14,060.00

83 1 M' PASANG PAPAN NOK 4/6 0.0026

M3 Kayu Kaso lokal uk 4/6 3,500,000.00 9,240.00 - 9,240.00 0.0250

kg Paku biasa uk. 2" - 5" 9,000.00 225.00 - 225.00 0.0075

Uph Mandor 40,000.00 - 300.00 300.00 0.0500

Uph Tukang Kayu 37,000.00 - 1,850.00 1,850.00 0.0250

Uph Pekerja 35,000.00 - 875.00 875.00 JUMLAH 9,465.00 3,025.00 12,490.00 Dibulatkan 12,490.00

84 1 M' PASANG PAPAN NOK 3/20 0.0066

M3 Kayu lokal Keras 2,200,000.00 14,520.00 - 14,520.00 0.0250

kg Paku biasa uk. 2" - 5" 9,000.00 225.00 - 225.00 0.0050

Uph Mandor 40,000.00 - 200.00 200.00 0.2000

Uph Tukang Kayu 37,000.00 - 7,400.00 7,400.00 0.1000

Uph Pekerja 35,000.00 - 3,500.00 3,500.00 JUMLAH 14,745.00 11,100.00 25,845.00 Dibulatkan 25,840.00

85 1 M' PASANG PAPAN TALANG 2 X 2/20 LAPIS SENG BJLS 20 0.0088

M3 Kayu Papan lokal Keras 900,000.00 7,920.00 - 7,920.00 0.5000

M' Seng BJLS 22 17,500.00 8,750.00 - 8,750.00 0.0500

kg Paku biasa uk. 2" - 5" 9,000.00 450.00 - 450.00 0.0500

Uph Mandor 40,000.00 - 2,000.00 2,000.00 0.1500

Uph Tukang Kayu 37,000.00 - 5,550.00 5,550.00 0.1000

Uph Pekerja 35,000.00 - 3,500.00 3,500.00 JUMLAH 17,120.00 11,050.00 28,170.00 Dibulatkan 28,170.00

86 1 M2 PAS.RANGKA ATAP KY. LOKAL 4/6 & 2/3 U/ GENTENG PALENTONG 25 BH/M2 0.0036

M3 Reng Kayu Lokal 2/3 3,500,000.00 12,705.00 - 12,705.00 0.0079

M3 Kaso Kayu Lokal 4/6 3,500,000.00 27,720.00 - 27,720.00 0.0500

kg Paku biasa uk. 2" - 5" 9,000.00 450.00 - 450.00 0.0500

kg Paku 1,5 " 9,000.00 450.00 - 450.00 0.0050

Uph Mandor 40,000.00 - 200.00 200.00 0.1000

Uph Tukang Kayu 37,000.00 - 3,700.00 3,700.00 0.1000

Uph Pekerja 35,000.00 - 3,500.00 3,500.00 JUMLAH 41,325.00 7,400.00 48,725.00 Dibulatkan 48,720.00

(17)

1 2 3 4 5 6 7 8 87 1 M2 PAS.RANGKA ATAP KAYU Uk. 5/7 & 3/4 UNTUK GENTENG BETON 12 BH./ M2

0.0046

M3 Reng Kayu Lokal 3/4 3,500,000.00 16,170.00 - 16,170.00 0.0096

kg Kaso Kayu Lokal 5/7 3,500,000.00 33,687.50 - 33,687.50 0.0500

kg Paku biasa uk. 2" - 5" 9,000.00 450.00 - 450.00 0.0500

kg Paku 1,5 " 9,000.00 450.00 - 450.00 0.0050

Uph Mandor 40,000.00 - 200.00 200.00 0.1000

Uph Tukang Kayu 37,000.00 - 3,700.00 3,700.00 0.1000

Uph Pekerja 35,000.00 - 3,500.00 3,500.00 JUMLAH 50,757.50 7,400.00 58,157.50 Dibulatkan 58,150.00

88 1 M2 PAS.RANGKA ATAP KAYU Uk. 5/7 & 3/4 UNTUK GENTENG METAL 1,62 LB/M2 0.0034

M3 Reng Kayu Lokal 3/4 3,500,000.00 12,012.00 - 12,012.00 0.0077

kg Kaso Kayu Lokal 5/7 3,500,000.00 26,950.00 - 26,950.00 0.0400

kg Paku biasa uk. 2" - 5" 9,000.00 360.00 - 360.00 0.0400

kg Paku 1,5 " 9,000.00 360.00 - 360.00 0.0050

Uph Mandor 40,000.00 - 200.00 200.00 0.1000

Uph Tukang Kayu 37,000.00 - 3,700.00 3,700.00 0.1000 Uph Pekerja 35,000.00 - 3,500.00 3,500.00 JUMLAH 39,682.00 7,400.00 47,082.00 Dibulatkan 47,080.00 89 1 M2 PAS.GENTENG PALENTONG 25 BH/M2 25.0000 Bh. Genteng Palentong 600.00 15,000.00 - 15,000.00 0.0080 Uph Mandor 40,000.00 - 320.00 320.00 0.0750

Uph Tukang Batu 37,000.00 - 2,775.00 2,775.00 0.1500

Uph Pekerja 35,000.00 - 5,250.00 5,250.00 JUMLAH 15,000.00 8,345.00 23,345.00 Dibulatkan 23,340.00

90 1 M' PAS.NOK GENTENG PALENTONG 5 BH/M' 5.0000

Bh. Nok Genteng Palentong 3,500.00 17,500.00 - 17,500.00 0.1250

Sak PC (Portland Cement ) 40 kg 45,000.00 5,625.00 - 5,625.00 0.0325

M3 Pasir 90,000.00 2,925.00 - 2,925.00 0.0020

Uph Mandor 40,000.00 - 80.00 80.00 0.2000

Uph Tukang Batu 37,000.00 - 7,400.00 7,400.00 0.2000

Uph Pekerja 35,000.00 - 7,000.00 7,000.00 JUMLAH 26,050.00 14,480.00 40,530.00 Dibulatkan 40,530.00

91 1 M2 PAS.GENTENG MORANDO GLAZUR 12 BH/M2 12.0000

Bh. Genteng Marando glazur 2,800.00 33,600.00 - 33,600.00 0.0075

Uph Mandor 40,000.00 - 300.00 300.00 0.0600

Uph Tukang Batu 37,000.00 - 2,220.00 2,220.00 0.1500

Uph Pekerja 35,000.00 - 5,250.00 5,250.00 JUMLAH 33,600.00 7,770.00 41,370.00 Dibulatkan 41,370.00

92 1 M' PAS.NOCK GENTENG MORANDO GLAZUR 4 BH/M' 4.0000

Bh. Nock Genteng Morando glazur 4,000.00 16,000.00 - 16,000.00 0.2000

Sak PC (Portland Cement ) 40 kg 45,000.00 9,000.00 - 9,000.00 0.0325

M3 Pasir 90,000.00 2,925.00 - 2,925.00 0.0020

Uph Mandor 40,000.00 - 80.00 80.00 0.2000

Uph Tukang Batu 37,000.00 - 7,400.00 7,400.00 0.2000 Uph Pekerja 35,000.00 - 7,000.00 7,000.00 JUMLAH 27,925.00 14,480.00 42,405.00 Dibulatkan 42,400.00 93 1 M2 PAS.GENTENG METAL 1.62 LB/M2 1.6200 lb Genteng Metal 25,000.00 40,500.00 - 40,500.00 0.0250

kg Paku genteng metal 22,500.00 - 562.50 562.50 0.0075

Uph Mandor 40,000.00 - 300.00 300.00 0.0600

Uph Tukang Batu 37,000.00 - 2,220.00 2,220.00 0.1500

Uph Pekerja 35,000.00 - 5,250.00 5,250.00 JUMLAH 40,500.00 8,332.50 48,832.50 Dibulatkan 48,830.00

Referensi

Dokumen terkait

Tampilan Contoh Data Nilai Dari data nilai tersebut dilakukan proses penjurusan pada halaman penjurusan, seperti yang terlihat pada Gambar 4.15, dengan memilih nama siswa pada

Sifat proyek konstruksi yang kompleks dan dinamis menyebabkan potensi resiko pada proyck konstruktif relatif besar. Apabila rcsiko ini tidak ditangani dcngan baik dcngan

Prioritas - Strategi 2015 • Pertumbuhan ekonomi • Pengembangan Agribisnis berbasis kawasan • Pengembangan pariwisata berbasis kawasan • Peningkatan pelayanan pendidikan

vektor normal.. Diskritisasi domain dengan partikel SPH Data yang akan dimodelkan dengan metode SPH harus berupa partikel-partikel kecil. Pilihan jarak partikel batas

NARATOR  :: MENANTU SUNAN GUNUNG JATI/ DARI MENANTU SUNAN GUNUNG JATI/ DARI KESULTANAN DEMAK/ YANG BERNAMA KESULTANAN DEMAK/ YANG BERNAMA FATAHILAH// DATANG KE CIREBON/

Tuhan memelihara firman-Nya, Ia tidak akan menipu kita, Allah akan menyelamatkan kita ketika kita berada di bawah tanda darah itu, ketika kita percaya di dalam

Perbandingan pengeringan menggunakan dryer dan dengan menggunakan sinar matahari,hasil dari praktikum menunjukkan bahwa singkong yang dikeringkan dengan

Visi perusahaan Nusa Kita adalah menjadi agen Tour dan Travel yang terkemuka dikalangan masyarakat yang mampu menyediakan segala kebutuhan yang