• Tidak ada hasil yang ditemukan

46 Dinas ESDM 2013

N/A
N/A
Protected

Academic year: 2017

Membagikan "46 Dinas ESDM 2013"

Copied!
9
0
0

Teks penuh

(1)

KODE

REKENING

U R A I A N

JUMLAH

(Rp)

1

2

3

DASAR HUKUM

4

2 03 01 00 00 4

PEN D APATAN D AERAH

2 03 01 00 00 4 1

PEN D APATAN ASLI D AERAH

3 7 0 ,0 0 0 ,0 0 0 .0 0

2 03 01 00 00 4 1 2 Ret ribusi Daerah 370,000,000.00

JUM LAH PEN D APATAN

3 7 0 ,0 0 0 ,0 0 0 .0 0

BELAN JA

00 00 5

2 03 01

BELAN JA TI D AK LAN GSUN G

2 1 ,1 3 4 ,8 2 0 ,2 5 7 .0 0

00 00 5 1 2 03 01

Belanj a Pegaw ai 21,134,820,257.00

00 00 5 1 1 2 03 01

BELAN JA LAN GSUN G

5 0 ,0 1 5 ,9 9 1 ,0 0 0 .0 0

00 00 5 2 2 03 01

Pr ogr a m Pe n ge m ba n ga n Kin e r j a Pe n ge lola a n Air Be r sih D a n Air Lim ba h 7 5 0 ,0 0 0 ,0 0 0 .0 0 23

2 03 01

Pe m ba n gu n a n Sa r a n a Air Be r sih Be r su m be r D a r i Air Ta n a h D a la m D i W ila ya h Ke r j a Upt d Esdm W ila ya h I Cia n j u r

3 7 5 ,0 0 0 ,0 0 0 .0 0 23 01

2 03 01

Belanj a Pegaw ai 13,250,000.00

23 01 5 2 1 2 03 01

Belanj a Barang Dan Jasa 361,750,000.00

23 01 5 2 2 2 03 01

Pe m ba n gu n a n Sa r a n a Air Be r sih Be r su m be r D a r i Air Ta n a h D a la m D i W ila ya h Ke r j a Upt d Esdm W ila ya h I ii Ba n du n g

3 7 5 ,0 0 0 ,0 0 0 .0 0 23 02

2 03 01

Belanj a Pegaw ai 21,800,000.00

23 02 5 2 1 2 03 01

Belanj a Barang Dan Jasa 353,200,000.00

23 02 5 2 2 2 03 01

Pr ogr a m Pe n in gk a t a n Ka pa sit a s Su m be r D a ya Apa r a t u r 7 4 7 ,1 6 0 ,0 0 0 .0 0 59

2 03 01

Pe n in gk a t a n Ke m a m pu a n Su m be r da ya Apa r a t u r D in a s Esdm 7 4 7 ,1 6 0 ,0 0 0 .0 0 59 01

2 03 01

Belanj a Pegaw ai 433,400,000.00

59 01 5 2 1 2 03 01

Belanj a Barang Dan Jasa 313,760,000.00

59 01 5 2 2 2 03 01

Pr ogr a m Pe la ya n a n Adm in ist r a si Pe r k a n t or a n 3 ,1 4 4 ,8 3 0 ,0 0 0 .0 0 60

2 03 01

Pe n ye le n gga r a a n Adm n ist r a si Pe r k a n t or a n D in a s Esdm 1 ,4 1 0 ,1 8 0 ,0 0 0 .0 0 60 01

2 03 01

Belanj a Pegaw ai 3,700,000.00

60 01 5 2 1 2 03 01

Belanj a Barang Dan Jasa 1,406,480,000.00

60 01 5 2 2 2 03 01

Pe n ye le n gga r a a n Adm in ist r a si Pe r k a n t or a n Upt d Esdm W ila ya h I Cia n j u r 3 1 6 ,0 0 0 ,0 0 0 .0 0 60 02

(2)

1

2

3

4

Belanj a Barang Dan Jasa 316,000,000.00

60 02 5 2 2 2 03 01

Pe n ye le n gga r a a n Adm in ist r a si Pe r k a n t or a n Upt d Esdm W ila ya h I i Pu r w a k a r t a 2 9 1 ,0 0 0 ,0 0 0 .0 0 60 03

2 03 01

Belanj a Barang Dan Jasa 291,000,000.00

60 03 5 2 2 2 03 01

Pe n ye le n gga r a a n Adm in ist r a si Pe r k a n t or a n Upt d Esdm W ila ya h I ii Ba n du n g 2 4 1 ,0 0 0 ,0 0 0 .0 0 60 04

2 03 01

Belanj a Barang Dan Jasa 241,000,000.00

60 04 5 2 2 2 03 01

Pe n ye le n gga r a a n Adm in ist r a si Pe r k a n t or a n Upt d Esdm W ila ya h I v Ta sik m a la ya 3 2 6 ,6 5 0 ,0 0 0 .0 0 60 05

2 03 01

Belanj a Barang Dan Jasa 326,650,000.00

60 05 5 2 2 2 03 01

Pe n ye le n gga r a a n Adm in ist r a si Pe r k a n t or a n Upt d Esdm W ila ya h V Cir e bon 3 2 7 ,0 0 0 ,0 0 0 .0 0 60 06

2 03 01

Belanj a Barang Dan Jasa 327,000,000.00

60 06 5 2 2 2 03 01

Pe n ye le n gga r a a n Adm in ist r a si Pe r k a n t or a n Ba la i Pe n gu j ia n En e r gi D a n Su m be r D a ya M in e r a l

2 3 3 ,0 0 0 ,0 0 0 .0 0 60 07

2 03 01

Belanj a Pegaw ai 1,500,000.00

60 07 5 2 1 2 03 01

Belanj a Barang Dan Jasa 231,500,000.00

60 07 5 2 2 2 03 01

Pr ogr a m Pe n in gk a t a n Sa r a n a D a n Pr a sa r a n a Apa r a t u r 6 ,1 5 9 ,2 0 0 ,0 0 0 .0 0 61

2 03 01

Pe n in gk a t a n Sa r a n a D a n Pr a sa r a n a D in a s Esdm 1 ,9 3 4 ,2 0 0 ,0 0 0 .0 0 61 01

2 03 01

Belanj a Pegaw ai 48,300,000.00

61 01 5 2 1 2 03 01

Belanj a Barang Dan Jasa 66,100,000.00

61 01 5 2 2 2 03 01

Belanj a Modal 1,819,800,000.00

61 01 5 2 3 2 03 01

Pe n in gk a t a n Sa r a n a D a n Pr a sa r a n a Upt d Esdm W ila ya h I Cia n j u r 1 4 5 ,0 0 0 ,0 0 0 .0 0 61 02

2 03 01

Belanj a Pegaw ai 14,250,000.00

61 02 5 2 1 2 03 01

Belanj a Barang Dan Jasa 80,420,000.00

61 02 5 2 2 2 03 01

Belanj a Modal 50,330,000.00

61 02 5 2 3 2 03 01

Pe n in gk a t a n Sa r a n a D a n Pr a sa r a n a Upt d Esdm W ila ya h I i Pu r w a k a r t a 3 ,5 0 0 ,0 0 0 ,0 0 0 .0 0 61 03

2 03 01

Belanj a Pegaw ai 29,700,000.00

61 03 5 2 1 2 03 01

Belanj a Barang Dan Jasa 38,227,000.00

61 03 5 2 2 2 03 01

Belanj a Modal 3,432,073,000.00

61 03 5 2 3 2 03 01

(3)

1

2

3

4

Pe n in gk a t a n Sa r a n a D a n Pr a sa r a n a Upt d Esdm W ila ya h I ii Ba n du n g 1 4 5 ,0 0 0 ,0 0 0 .0 0 61 04

2 03 01

Belanj a Pegaw ai 1,500,000.00

61 04 5 2 1 2 03 01

Belanj a Barang Dan Jasa 50,000,000.00

61 04 5 2 2 2 03 01

Belanj a Modal 93,500,000.00

61 04 5 2 3 2 03 01

Pe n in gk a t a n Sa r a n a D a n Pr a sa r a n a Upt d Esdm W ila ya h I v Ta sik m a la ya 1 4 5 ,0 0 0 ,0 0 0 .0 0 61 05

2 03 01

Belanj a Pegaw ai 3,000,000.00

61 05 5 2 1 2 03 01

Belanj a Barang Dan Jasa 2,600,000.00

61 05 5 2 2 2 03 01

Belanj a Modal 139,400,000.00

61 05 5 2 3 2 03 01

Pe n in gk a t a n Sa r a n a D a n Pr a sa r a n a Upt d Esdm W ila ya h V Cir e bon 1 4 5 ,0 0 0 ,0 0 0 .0 0 61 06

2 03 01

Belanj a Pegaw ai 1,500,000.00

61 06 5 2 1 2 03 01

Belanj a Barang Dan Jasa 39,140,000.00

61 06 5 2 2 2 03 01

Belanj a Modal 104,360,000.00

61 06 5 2 3 2 03 01

Pe n in gk a t a n Sa r a n a D a n Pr a sa r a n a Ba la i Pe n gu j ia n Esdm 1 4 5 ,0 0 0 ,0 0 0 .0 0 61 07

2 03 01

Belanj a Pegaw ai 1,500,000.00

61 07 5 2 1 2 03 01

Belanj a Barang Dan Jasa 10,375,000.00

61 07 5 2 2 2 03 01

Belanj a Modal 133,125,000.00

61 07 5 2 3 2 03 01

Pr ogr a m Pe m e lih a r a a n Sa r a n a D a n Pr a sa r a n a Apa r a t u r 2 ,5 5 0 ,0 0 0 ,0 0 0 .0 0 62

2 03 01

Pe m e lih a r a a n Sa r a n a D a n Pr a sa r a n a Pe r k a n t or a n D in a s Esdm 8 0 0 ,0 0 0 ,0 0 0 .0 0 62 01

2 03 01

Belanj a Pegaw ai 4,600,000.00

62 01 5 2 1 2 03 01

Belanj a Barang Dan Jasa 795,400,000.00

62 01 5 2 2 2 03 01

Pe m e lih a r a a n Sa r a n a D a n Pr a sa r a n a Ka n t or Upt d Esdm W ila ya h I Cia n j u r 2 5 0 ,0 0 0 ,0 0 0 .0 0 62 02

2 03 01

Belanj a Pegaw ai 1,500,000.00

62 02 5 2 1 2 03 01

Belanj a Barang Dan Jasa 248,500,000.00

62 02 5 2 2 2 03 01

Pe m e lih a r a a n Sa r a n a D a n Pr a sa r a n a Ka n t or Upt d Esdm W ila ya h I i Pu r w a k a r t a 2 5 0 ,0 0 0 ,0 0 0 .0 0 62 03

2 03 01

Belanj a Pegaw ai 4,500,000.00

62 03 5 2 1 2 03 01

Belanj a Barang Dan Jasa 245,500,000.00

62 03 5 2 2 2 03 01

Pe m e lih a r a a n Sa r a n a D a n Pr a sa r a n a Ka n t or Upt d Esdm W ila ya h I ii Ba n du n g 2 5 0 ,0 0 0 ,0 0 0 .0 0 62 04

(4)

1

2

3

4

Belanj a Pegaw ai 1,500,000.00

62 04 5 2 1 2 03 01

Belanj a Barang Dan Jasa 248,500,000.00

62 04 5 2 2 2 03 01

Pe m e ilh a r a a n Sa r a n a D a n Pr a sa r a n a Ka n t or Upt d Esdm W ila ya h I v Ta sik m a la ya 2 5 0 ,0 0 0 ,0 0 0 .0 0 62 05

2 03 01

Belanj a Pegaw ai 4,500,000.00

62 05 5 2 1 2 03 01

Belanj a Barang Dan Jasa 245,500,000.00

62 05 5 2 2 2 03 01

Pe m e lih a r a a n Sa r a n a D a n Pr a sa r a n a Ka n t or Upt d Esdm W ila ya h V Cir e bon 2 5 0 ,0 0 0 ,0 0 0 .0 0 62 06

2 03 01

Belanj a Pegaw ai 1,500,000.00

62 06 5 2 1 2 03 01

Belanj a Barang Dan Jasa 248,500,000.00

62 06 5 2 2 2 03 01

Pe m e lih a r a a n Sa r a n a D a n Pr a sa r a n a Pe r k a n t or a n Ba la i Pe n gu j ia n En e r gi D a n Su m be r D a ya M in e r a l

5 0 0 ,0 0 0 ,0 0 0 .0 0 62 07

2 03 01

Belanj a Pegaw ai 3,000,000.00

62 07 5 2 1 2 03 01

Belanj a Barang Dan Jasa 464,160,000.00

62 07 5 2 2 2 03 01

Belanj a Modal 32,840,000.00

62 07 5 2 3 2 03 01

Pr ogr a m Pe n in gk a t a n Pe n ge m ba n ga n Sist e m Pe la por a n Ca pa ia n Kin e r j a D a n Ke u a n ga n

8 4 ,8 0 1 ,0 0 0 .0 0 66

2 03 01

Pe r e n ca n a a n , Eva lu a si, Pe la por a n I n t e r n a l D in a s Esdm 8 4 ,8 0 1 ,0 0 0 .0 0 66 01

2 03 01

Belanj a Pegaw ai 15,500,000.00

66 01 5 2 1 2 03 01

Belanj a Barang Dan Jasa 69,301,000.00

66 01 5 2 2 2 03 01

Pr ogr a m Pe n a n ggu la n ga n Be n ca n a Ala m D a n Pe r lin du n ga n M a sya r a k a t 2 5 0 ,0 0 0 ,0 0 0 .0 0 72

2 03 01

M it iga si Be n ca n a Ala m Ge ologi 2 5 0 ,0 0 0 ,0 0 0 .0 0

72 01 2 03 01

Belanj a Pegaw ai 32,700,000.00

72 01 5 2 1 2 03 01

Belanj a Barang Dan Jasa 217,300,000.00

72 01 5 2 2 2 03 01

Pr ogr a m Pe n ge m ba n ga n Su m be r da ya M in e r a l D a n Pa n a s Bu m i 7 ,2 3 0 ,0 0 0 ,0 0 0 .0 0 85

2 03 01

Pe n ge m ba n ga n Pot e n si Pa n a s Bu m i D a n M iga s D i Ja w a Ba r a t 1 ,9 5 0 ,0 0 0 ,0 0 0 .0 0 85 01

2 03 01

Belanj a Pegaw ai 203,100,000.00

85 01 5 2 1 2 03 01

Belanj a Barang Dan Jasa 1,746,900,000.00

85 01 5 2 2 2 03 01

Opt im a lisa si Pe n ge lola a n Pe n da pa t a n D a e r a h Se k t or En e r gi D a n Su m be r da ya M in e r a l

2 5 0 ,0 0 0 ,0 0 0 .0 0 85 02

2 03 01

(5)

1

2

3

4

Belanj a Pegaw ai 30,350,000.00

85 02 5 2 1 2 03 01

Belanj a Barang Dan Jasa 219,650,000.00

85 02 5 2 2 2 03 01

Pe n ge m ba n ga n I n ve st a si D a n Ke r j a sa m a Se k t or En e r gi D a n Su m be r D a ya M in e r a l 2 5 0 ,0 0 0 ,0 0 0 .0 0 85 03

2 03 01

Belanj a Pegaw ai 40,800,000.00

85 03 5 2 1 2 03 01

Belanj a Barang Dan Jasa 209,200,000.00

85 03 5 2 2 2 03 01

Pe n ge lola a n D a t a Ce n t e r En e r gi D a n Su m be r D a ya M in e r a l 6 0 0 ,0 0 0 ,0 0 0 .0 0 85 04

2 03 01

Belanj a Pegaw ai 117,100,000.00

85 04 5 2 1 2 03 01

Belanj a Barang Dan Jasa 322,292,650.00

85 04 5 2 2 2 03 01

Belanj a Modal 160,607,350.00

85 04 5 2 3 2 03 01

Eva lu a si Pe t a Zon a si D a n Pe la k sa n a a n Ke bij a k a n Pe n ge lola a n Air t a n a h D i Ja w a Ba r a t

6 0 0 ,0 0 0 ,0 0 0 .0 0 85 05

2 03 01

Belanj a Pegaw ai 41,250,000.00

85 05 5 2 1 2 03 01

Belanj a Barang Dan Jasa 558,750,000.00

85 05 5 2 2 2 03 01

Pe n in gk a t a n Upa ya Pe m u lih a n Kon disi M u k a Air t a n a h 7 5 0 ,0 0 0 ,0 0 0 .0 0 85 06

2 03 01

Belanj a Pegaw ai 23,200,000.00

85 06 5 2 1 2 03 01

Belanj a Barang Dan Jasa 56,800,000.00

85 06 5 2 2 2 03 01

Belanj a Modal 670,000,000.00

85 06 5 2 3 2 03 01

Pe m bin a a n , Pe n ga w a sa n D a n Pe n ge n da lia n Pe n gu sa h a a n Pe r t a m ba n ga n Um u m , Ba t u ba r a D a n Air t a n a h D i W ila ya h Ke r j a Upt d Esdm W ila ya h I Cia n j u r

1 0 0 ,0 0 0 ,0 0 0 .0 0 85 07

2 03 01

Belanj a Barang Dan Jasa 100,000,000.00

85 07 5 2 2 2 03 01

Pe m bin a a n , Pe n ga w a sa n D a n Pe n ge n da lia n Pe n gu sa h a a n Pe r t a m ba n ga n Um u m , Ba t u ba r a D a n Air t a n a h D i W ila ya h Ke r j a Upt D e sdm W ila ya h I i Pu r w a k a r t a

1 0 0 ,0 0 0 ,0 0 0 .0 0 85 08

2 03 01

Belanj a Barang Dan Jasa 100,000,000.00

85 08 5 2 2 2 03 01

Pe m bin a a n , Pe n ga w a sa n D a n Pe n ge n da lia n Pe n gu sa h a a n Pe r t a m ba n ga n Um u m , Ba t u ba r a D a n Air t a n a h D i W ila ya h Ke r j a Upt d Esdm W ila ya h I ii Ba n du n g

1 0 0 ,0 0 0 ,0 0 0 .0 0 85 09

2 03 01

Belanj a Barang Dan Jasa 100,000,000.00

85 09 5 2 2 2 03 01

Pe m bin a a n , Pe n ga w a sa n D a n Pe n ge n da lia n Pe n gu sa h a a n Pe r t a m ba n ga n Um u m , Ba t u ba r a D a n Air t a n a h D i W ila ya h Ke r j a Upt d Esdm W ila ya h I v Ta sik m a la ya

1 0 0 ,0 0 0 ,0 0 0 .0 0 85 10

2 03 01

Belanj a Barang Dan Jasa 100,000,000.00

(6)

1

2

3

4

Pe m bin a a n , Pe n ga w a sa n D a n Pe n ge n da lia n Pe n gu sa h a a n Pe r t a m ba n ga n Um u m , Ba t u ba r a D a n Air t a n a h D i W ila ya h Ke r j a Upt d Esdm V Cir e bon

1 0 0 ,0 0 0 ,0 0 0 .0 0 85 11

2 03 01

Belanj a Pegaw ai 7,000,000.00

85 11 5 2 1 2 03 01

Belanj a Barang Dan Jasa 93,000,000.00

85 11 5 2 2 2 03 01

Fa silit a si D a n Koor din a si Pe n ge lola a n M in e r a l, Ge ologi D a n Air t a n a h D i Ja w a Ba r a t 1 0 0 ,0 0 0 ,0 0 0 .0 0 85 12

2 03 01

Belanj a Pegaw ai 10,800,000.00

85 12 5 2 1 2 03 01

Belanj a Barang Dan Jasa 89,200,000.00

85 12 5 2 2 2 03 01

Sin e r git a s Pe r e n ca n a a n Pe m ba n gu n a n Bida n g En e r gi D a n Su m be r D a ya M in e r a l D i Ja w a Ba r a t

4 5 0 ,0 0 0 ,0 0 0 .0 0 85 13

2 03 01

Belanj a Pegaw ai 18,090,000.00

85 13 5 2 1 2 03 01

Belanj a Barang Dan Jasa 431,910,000.00

85 13 5 2 2 2 03 01

Pe n yia pa n Ka w a sa n Pe n gola h a n Pe r t a m ba n ga n M in e r a l 4 0 0 ,0 0 0 ,0 0 0 .0 0 85 14

2 03 01

Belanj a Pegaw ai 32,550,000.00

85 14 5 2 1 2 03 01

Belanj a Barang Dan Jasa 367,450,000.00

85 14 5 2 2 2 03 01

Pe n in gk a t a n N ila i Ta m ba h Usa h a Pe r t a m ba n ga n 2 5 0 ,0 0 0 ,0 0 0 .0 0 85 15

2 03 01

Belanj a Pegaw ai 19,400,000.00

85 15 5 2 1 2 03 01

Belanj a Barang Dan Jasa 230,600,000.00

85 15 5 2 2 2 03 01

Pe m bin a a n Te k n is Ek splor a si Pa n a s Bu m i D a n Fa silit a si Pe r h it u n ga n Pot e n si M iga s D i Ja w a Ba r a t

1 5 0 ,0 0 0 ,0 0 0 .0 0 85 16

2 03 01

Belanj a Pegaw ai 30,000,000.00

85 16 5 2 1 2 03 01

Belanj a Barang Dan Jasa 120,000,000.00

85 16 5 2 2 2 03 01

Opt im a lisa si Pe m a n fa a t a n La n gsu n g Pa n a s Bu m i 3 8 0 ,0 0 0 ,0 0 0 .0 0 85 17

2 03 01

Belanj a Pegaw ai 61,050,000.00

85 17 5 2 1 2 03 01

Belanj a Barang Dan Jasa 318,950,000.00

85 17 5 2 2 2 03 01

Fs Pe n ge m ba n ga n La bor a t or iu m Pe n gu j ia n Ba t u ba r a 1 5 0 ,0 0 0 ,0 0 0 .0 0 85 18

2 03 01

Belanj a Pegaw ai 7,995,000.00

85 18 5 2 1 2 03 01

Belanj a Barang Dan Jasa 142,005,000.00

85 18 5 2 2 2 03 01

(7)

1

2

3

4

Pe n ya j ia n I n for m a si Eva lu a si Ku a lit a s Air t a n a h Be r da sa r k a n H a sil Pe n gu j ia n D i La bor a t or iu m Ba la i Pe n gu j ia n Esdm Pr ovin si Ja w a Ba r a t .

1 5 0 ,0 0 0 ,0 0 0 .0 0 85 19

2 03 01

Belanj a Pegaw ai 12,950,000.00

85 19 5 2 1 2 03 01

Belanj a Barang Dan Jasa 137,050,000.00

85 19 5 2 2 2 03 01

Pe n yu su n a n Fs Ur ba n M in in g 3 0 0 ,0 0 0 ,0 0 0 .0 0

85 20 2 03 01

Belanj a Pegaw ai 141,200,000.00

85 20 5 2 1 2 03 01

Belanj a Barang Dan Jasa 158,800,000.00

85 20 5 2 2 2 03 01

Pr ogr a m Pe m bin a a n D a n Pe n ge m ba n ga n Bida n g Ke t e n a ga list r ik a n D a n En e r gi 2 9 ,1 0 0 ,0 0 0 ,0 0 0 .0 0 86

2 03 01

Ak se le r a si Pe n in gk a t a n Ra sio Ele k t r ifik a si Ja w a Ba r a t M e la lu i Ja r in ga n Pln D i W ila ya h Ke r j a Upt d Esdm W ila ya h I Cia n j u r

5 ,4 3 0 ,0 0 0 ,0 0 0 .0 0 86 01

2 03 01

Belanj a Pegaw ai 96,300,000.00

86 01 5 2 1 2 03 01

Belanj a Barang Dan Jasa 334,055,000.00

86 01 5 2 2 2 03 01

Belanj a Modal 4,999,645,000.00

86 01 5 2 3 2 03 01

Ak se le r a si Pe n in gk a t a n Ra sio Ele k t r ifik a si Ja w a Ba r a t M e la lu i Ja r in ga n Pln D i W ila ya h Ke r j a Upt d Esdm W ila ya h I i Pu r w a k a r t a

4 ,4 0 6 ,0 0 0 ,0 0 0 .0 0 86 02

2 03 01

Belanj a Pegaw ai 91,300,000.00

86 02 5 2 1 2 03 01

Belanj a Barang Dan Jasa 401,986,000.00

86 02 5 2 2 2 03 01

Belanj a Modal 3,912,714,000.00

86 02 5 2 3 2 03 01

Ak se le r a si Pe n in gk a t a n Ra sio Ele k t r ifik a si Ja w a Ba r a t M e la lu i Ja r in ga n Pln D i W ila ya h Ke r j a Upt d Esdm W ila ya h I ii Ba n du n g

4 ,3 9 7 ,0 0 0 ,0 0 0 .0 0 86 03

2 03 01

Belanj a Pegaw ai 91,050,000.00

86 03 5 2 1 2 03 01

Belanj a Barang Dan Jasa 417,090,000.00

86 03 5 2 2 2 03 01

Belanj a Modal 3,888,860,000.00

86 03 5 2 3 2 03 01

Ak se le r a si Pe n in gk a t a n Ra sio Ele k t r ifik a si Ja w a Ba r a t M e la lu i Ja r in ga n Pln D i W ila ya h Ke r j a Upt d Esdm W ila ya h I v Ta sik m a la ya

6 ,2 3 4 ,0 0 0 ,0 0 0 .0 0 86 04

2 03 01

Belanj a Pegaw ai 112,600,000.00

86 04 5 2 1 2 03 01

Belanj a Barang Dan Jasa 349,700,000.00

86 04 5 2 2 2 03 01

Belanj a Modal 5,771,700,000.00

86 04 5 2 3 2 03 01

Ak se le r a si Pe n in gk a t a n Ra sio Ele k t r ifik a si Ja w a Ba r a t M e la lu i Ja r in ga n Pln D i W ila ya h Ke r j a Upt d Esdm W ila ya h V Cir e bon

4 ,5 3 3 ,0 0 0 ,0 0 0 .0 0 86 05

(8)

1

2

3

4

Belanj a Pegaw ai 77,450,000.00

86 05 5 2 1 2 03 01

Belanj a Barang Dan Jasa 462,450,000.00

86 05 5 2 2 2 03 01

Belanj a Modal 3,993,100,000.00

86 05 5 2 3 2 03 01

Pe n ge m ba n ga n Pe m a n fa a t a n En e r gi Ba r u Te r ba r u k a n D i Ja w a Ba r a t 1 ,5 0 0 ,0 0 0 ,0 0 0 .0 0 86 06

2 03 01

Belanj a Pegaw ai 57,800,000.00

86 06 5 2 1 2 03 01

Belanj a Barang Dan Jasa 1,442,200,000.00

86 06 5 2 2 2 03 01

Pe n in gk a t a n Upa ya Kon se r va si D a n Pe n gh e m a t a n En e r gi 3 5 0 ,0 0 0 ,0 0 0 .0 0 86 07

2 03 01

Belanj a Pegaw ai 15,250,000.00

86 07 5 2 1 2 03 01

Belanj a Barang Dan Jasa 334,750,000.00

86 07 5 2 2 2 03 01

Pe n ge m ba n ga n D e sa M a n dir i En e r gi Be r ba sis En e r gi Ba r u Te r ba r u k a n 3 5 0 ,0 0 0 ,0 0 0 .0 0 86 08

2 03 01

Belanj a Pegaw ai 42,500,000.00

86 08 5 2 1 2 03 01

Belanj a Barang Dan Jasa 307,500,000.00

86 08 5 2 2 2 03 01

St u di Ke la ya k a n Pe n ge m ba n ga n Ga s Pe r k ot a a n 4 0 0 ,0 0 0 ,0 0 0 .0 0 86 09

2 03 01

Belanj a Pegaw ai 33,950,000.00

86 09 5 2 1 2 03 01

Belanj a Barang Dan Jasa 366,050,000.00

86 09 5 2 2 2 03 01

Aplik a si Te k n ologi Te pa t Gu n a D a la m D ive r sifik a si Pe m a n fa a t a n En e r gi : Pe n ge m ba n ga n Pe m a n fa a t a n Bio En e r gi Ke m ir i Su n a n

5 5 0 ,0 0 0 ,0 0 0 .0 0 86 10

2 03 01

Belanj a Pegaw ai 74,700,000.00

86 10 5 2 1 2 03 01

Belanj a Barang Dan Jasa 275,300,000.00

86 10 5 2 2 2 03 01

Belanj a Modal 200,000,000.00

86 10 5 2 3 2 03 01

Pe n ga w a sa n D ist r ibu si D a n N ia ga M iga s H ilir 2 5 0 ,0 0 0 ,0 0 0 .0 0 86 11

2 03 01

Belanj a Barang Dan Jasa 250,000,000.00

86 11 5 2 2 2 03 01

Pe n yu su n a n D e t a ile d En gin e e r in g D e sign ( de d) Pe m ba n gu n a n M ik r oh idr o 3 5 0 ,0 0 0 ,0 0 0 .0 0 86 12

2 03 01

Belanj a Pegaw ai 36,950,000.00

86 12 5 2 1 2 03 01

Belanj a Barang Dan Jasa 313,050,000.00

86 12 5 2 2 2 03 01

Fa silit a si Pe n ge m ba n ga n I n fr a st r u k t u r En e r gi D a n Ke t e n a ga list r ik a n D i Ja w a Ba r a t 3 5 0 ,0 0 0 ,0 0 0 .0 0 86 13

2 03 01

Belanj a Pegaw ai 56,200,000.00

86 13 5 2 1 2 03 01

(9)

1

2

3

4

Belanj a Barang Dan Jasa 293,800,000.00

86 13 5 2 2 2 03 01

Referensi

Garis besar

Dokumen terkait

Judul KTI : Prevalensi Pasien Infark Miokard Akut Yang Menjadi Cardiac Arrest di ICU/HCU RSUP Dr. Kariadi Semarang... Dengan ini

Atkinson (1983:58) mendefinisikan agresi sebagai perilaku yang yang bertujuan melukai orang lain (secara fisik maupun verbal). Artinya perilaku agresif yakni tindakan

Tabel 2.14 Jumlah Angka Kriminalitas di Kabupaten Probolinggo 26 Tabel 2.15 Matrik Gambaran Umum Kondisi Daerah Terhadap Capaian Kinerja. Penyelenggaraan Urusan Pemerintahan

Apabila setelah bulan Juni 2009 Peri Irawan belum memiliki NPWP maka atas PPh Pasal 21 yang terutang tidak ada yang ditanggung Pemerintah sehingga besarnya penghasilan yang

In other words, Feinberg did not remove the unconditioned Study 1 was conducted to provide a direct test of Feinberg’s stimulus—the credit card itself—when measuring the putative

Setelah berdiskusi, siswa mampu memberikan pendapat tentang sikap yang sesuai dan kurang sesuai dengan sila pertama dengan benar.. Setelah berdiskusi, siswa mampu menulis

The calculation of the ``geographical footprint'' of land consumed by buildings, roads, paths and other University infrastructure was achieved using AutoCAD 14 polyline analysis

Pada uji protein, sampel putih telur positif mengandung sulfur pada uji sulfur yang ditandai dengan adanya endapan coklat kehitaman, uji positif pada tes denaturasi protein