• Tidak ada hasil yang ditemukan

PERENCANAAN JEMBATAN KARANG PLOSO, BATU, MALANG - Diponegoro University | Institutional Repository (UNDIP-IR)

N/A
N/A
Protected

Academic year: 2017

Membagikan "PERENCANAAN JEMBATAN KARANG PLOSO, BATU, MALANG - Diponegoro University | Institutional Repository (UNDIP-IR)"

Copied!
3
0
0

Teks penuh

(1)

CHAPTER I

INTRODUCTION

1.1COMMON OBSERVATION

Bridge is a part from history of human development. Bridge existence is

beginning with human desire to reach a more fertile area which is location in

front of the river, that problem can increase some idea to make a connection to

that location. Two big rocks which located in the center of the river is a first

idea from a bridge.

From the beginning, using a bridge are was just to relate two places which

is separated by a small part of the bridge. But now, the bridge can also use to

relate two places which is neither separated by the ocean nor the other line

with a long part.

In the development of it, there’s a lot variation shape of bridge, from a

simple shape such as bridge with the concrete sheet, bridge with the steel sheet

until shape which involved element of art like arch bridge. Right design with

live survey for getting files on that area is very important to get a strength and

sturdy structure. Shape which is existent could be combinated with the other

structure to get a better structure.

The existent of the bridge, now is very important, the bridge not just for

supporting the transportation system but it also function for connection

something which could increase the value of aesthetics and the value of selling

a location.

1.2BACKGROUND

For developing real estate and also accelerate a traffic in Ngijo Village

Karang Ploso, Batu, Malang, it will design a bridge which is suitable with

situation and condition in that location. This bridge can also established to

increase a value of selling restaurant above the structure.

(2)

1.3AIM AND PURPOSE

Aim and purpose from “Design of Bridge in Karang Ploso, Batu, Malang” are:

- Design a bridge which is suitable with the condition in Ngijo Village

Karang Ploso, Batu, Malang

- Analyze and account efficiency of development cost from the bridge

1.4LOCATION

The location of the bridge is at Ngijo Village Karang Ploso, Batu, Malang.

1.5SCOPE

Scope of the problem which researched in this bridge design include :

1) Select the bridge type

2) Topography aspect

3) Soil condition aspect

4) Hydrology aspect

5) Traffic aspect

6) Bridge construction aspect

7) Bridge structure account

8) Composing cost estimate plan, that consist of : material prize and fee list,

analyze unit prize list, and cost recapitulation.

1.6SEQUNCE WRITING

In writing the final exam which title is “Design of Bridge in Karang Ploso,

Batu, Malang”, there are some chapter, and every chapter can divided into

some part. The chapter consist of :

Chapter I Introduction

The content of this chapter are common observation, background,

aim and purpose, scope and sequence writing.

Chapter II Literature Study

This chapter consist of theory and design basic which used to solve

the problems.

(3)

Chapter III Methodology

This chapter explain about the steps during writing and the method

of final exam collection.

Chapter IV File Analysis

Content of this chapter are the result from primary and secondary

files collecting also evaluation about bridge serve grade and give

bridge handling conclusion.

Chapter V Upper Structure Design

This chapter about upper structure analyze, which form are precast

concrete beam, railing and floor sheet.

Chapter VI Restaurant Supporting Structure Design

This chapter about restaurant supporting structure design, which

form is steel frame.

Chapter VII Sub Structure Design

This chapter contain with sub structure design which consist of

abutment design and bore pile foundation as useless also

reinforcement technic.

Chapter VIII Work Plan and Work Schedule Regulation

This chapter containt with work plan and the regulation which

known as RKS bridge construction schedule.

Chapter IX Cost Estimate Plan and Time Schedule

This chapter containt with work volume estimate, unit material

prize analysis also cost estimate plan.

Chapter X Ending

This chapter contain with conclusion also the suggestion about this

final exam.

Referensi

Dokumen terkait

Sesuai dengan namanya, Batu Night Spectacular merupakan sebuah tempat wisata keluarga yang hanya dapat dinikmati malam hari, buka mulai pukul 15.00 sampai 02.00.. Dengan memiliki

penyusunan laporan Tugas Akhir dengan judul “ Perencanaan Bangunan Pengendali.. Sedimen Waduk Selorejo Malang “, sebagai syarat untuk

dalam menyelesaikan Pendidikan Tingkat Sarjana (Strata - 1) pada Jurusan Teknik Sipil Fakultas Teknik Universitas Diponegoro. Disusun

Tugas akhir ini merupakan salah satu representasi dari keilmuan dan pengetahuan yang telah kami peroleh selama kuliah di Fakultas Teknik Jurusan Sipil Universitas Diponegoro,

Bab ini membahas mengenai hasil analisa data yang akan dihitung untuk perencanaan spesifikasi teknis bangunan dan perhitungan bangunan utama maupun bangunan penunjang atau

Dalam perencanaan abutment jembatan data-data tanah yang dibutuhkan berupa data-data sudut geser, kohesi dan berat jenis tanah yang digunakan untuk menghitung tekanan tanah

Apabila hasil-hasil dari analisa dan pengolahan data sudah didapat, maka tahap perencanaa desain jembatan bisa dilaksanakan, dengan tujuan mengetahui konstruksi jembatan

Hal ini menunjukkan bahwa jumlah kendaraan mempunyai pengaruh yang besar terhadap pertumbuhan jumlah LHR dan dapat digunakan sebagai variabel untuk memprediksi jumlah LHR pada