• Tidak ada hasil yang ditemukan

ANALISIS KEBUTUHAN KAPASITAS PADA FASILITAS SISI DARAT TERMINAL PENUMPANG KEBERANGKATAN DOMESTIK BANDAR UDARA INTERNASIONAL JUANDA Repository - UNAIR REPOSITORY

N/A
N/A
Protected

Academic year: 2019

Membagikan "ANALISIS KEBUTUHAN KAPASITAS PADA FASILITAS SISI DARAT TERMINAL PENUMPANG KEBERANGKATAN DOMESTIK BANDAR UDARA INTERNASIONAL JUANDA Repository - UNAIR REPOSITORY"

Copied!
21
0
0

Teks penuh

(1)

ANALISIS KEBUTUHAN KAPASITAS PADA FASILITAS

SISI DARAT TERMINAL PENUMPANG KEBERANGKATAN

DOMESTIK BANDAR UDARA INTERNASIONAL JUANDA

DIAJUKAN UNTUK MEMENUHI SEBAGIAN PERSYARATAN

DALAM MEMPEROLEH GELAR SARJANA MANAJEMEN

DEPARTEMEN MANAJEMEN

PROGRAM STUDI MANAJEMEN

DIAJUKAN OLEH :

APRINA KARTIKA PUTRI

NIM : 040811361

FAKULTAS EKONOMI DAN BISNIS

UNIVERSITAS AIRLANGGA

(2)
(3)
(4)

iv

KATA PENGANTAR

Dengan segala kerendahan hati, penulis mengucapkan puji dan syukur ke

hadirat Tuhan Yesus Kristus yang telah melimpahkan berkat, rahmat dan

penyertaanNya kepada penulis sehingga akhirnya dapat menyelesaikan skripsi

yang berjudul “Analisis Kebutuhan Kapasitas pada Fasilitas Sisi Darat Terminal

Keberangkatan Penumpang Domestik Bandar Udara Internasional Juanda”.

Penulisan skripsi ini bertujuan untuk memenuhi persyaratan dalam

memperoleh gelar Sarjana Manajemen pada Fakultas Ekonomi dan Bisnis

Universitas Airlangga. Selama penulisan skripsi ini, penulis menyadari bahwa

masih terdapat banyak kekurangan, baik dari segi isi maupun cara penyajiannya.

Hal ini disebabkan keterbatasan yang dihadapi penulis dalam hal waktu dan

informasi, tetapi dengan bantuan, dukungan, doa, dan bimbingan dari berbagai

pihak, maka penulis dapat menyelesaikan skripsi ini. Oleh karena itu, penulis

ingin menyampaikan ucapan terima kasih kepada semua pihak yang telah

berkenan meluangkan waktunya untuk memberikan bantuan dan dukungannya

kepada penulis.

Adapun ucapan terima kasih penulis sampaikan kepada:

1. Tuhan Yesus Kristus atas kasih, kekuatan, penghiburan, hikmat dan

(5)

v

Maria untuk setiap penyertaan di dalam doa dan ketenangan dari awal hingga

akhir pemikiran, penulisan dan pertanggungjawaban skripsi ini.

2. Bapak Alm. Ir. Ignatius Soelarso Seputro, M.Si, ayah penulis, untuk setiap

kasih sayang dan doa dari surga, dan Ibu Sri Bidaryati, Amd. Keb., ibu

penulis, yang telah memberikan dukungan material, doa restu dan semangat

sehingga skripsi ini dapat terselesaikan. Untuk kakakku Gunala Agustinus,

terima kasih untuk kasih sayang sekali pun tak terungkap serta untuk seluruh

keluarga besar penulis, terima kasih semuanya.

3. Bapak Sastra Kosasih selaku komisaris Wismilak beserta para donator

beasiswa Save The Student, yang telah memberikan beasiswa selama penulis

belajar di perguruan tinggi dan dana untuk penelitian ini.

4. Bapak Drs. Hermawanto, M.Sc., M.BA., selaku Dosen Pembimbing yang

telah menyediakan waktu, bimbingan, pikiran, dan motivasi atas

penyelesaian skripsi ini.

5. Bapak Prof. Dr. Muslich Anshori, SE., M.Sc., Ak., selaku Dekan Fakultas

Ekonomi dan Bisnis Universitas Airlangga.

6. Bapak Sri Gunawan, DBA., selaku Ketua Departemen Manajemen Fakultas

Ekonomi dan Bisnis Universitas Airlangga.

7. Ibu Dra. Ec. Nuri Herachwati, M.Si, M.Sc., selaku Ketua Program Studi

Manajemen Fakultas Ekonomi dan Bisnis Universitas Airlangga beserta staf

tata usaha yang telah banyak membantu hingga terselesaikannnya skripsi ini

8. Seluruh dosen, staf, dan karyawan Fakultas Ekonomi dan Bisnis Universitas

(6)

vi

Indrianawati Usman, S.E., M.Sc. yang sekaligus dosen wali penulis, Ibu

Febriana Wurjaningrum, S.E., M.T., Ibu Yetty Dwi Lestari, S.E., M.T.,

Bapak Tuwanku Aria Auliandri, S.E., M.Sc., Bapak Drs. Ec. Indro Kirono,

M.M., Bapak Drs. Puspandam Katias, M.M., MILog., Bapak Ir. Baling

Kustriyono, M.M, Bapak Amak Mohamad Yaqoub, S.E., M.S.M., atas

segala ilmu pengetahuan, masukan, dan motivasi yang diberikan

9. Bapak Drs. Firstson Mansyur selaku Asisten Manajer SIM, TAPOR &

HUMAS, Ibu Maya Damayanti, S.T., selaku Asisten Manajer Teknik

Bangunan, Bapak dan Ibu staff di Divisi Teknik Bangunan, dan Bapak dan

Ibu di Divisi SIM, TAPOR & HUMAS PT Angkasa Pura I (Persero) yang

telah memberikan informasi dan wawasan secara teori selama penelitian di

Bandar Udara Internasional Juanda dan Bapak-bapakAirport Duty Manager

dan Bapak-bapak Inspektur Terminal Bandar Udara Internasional Juanda

yang telah memberikan bimbingan aplikatif selama proses magang sehingga

penulis lebih mengerti setiap proses di lapangan.

10. Dr. Cissy Caecilia The, SpRM, Prof. Joseph Glinka, SVD., kakak – kakak

damping dan rekan-rekan penerima beasiswa Save The Student yang selalu

memotivasi untuk segera menyelesaikan studi dan penelitian ini.

11. Prof. Dr. Dicky Hastjarjo, M.A, Ph.D., Ibu Dra. Irma Syahrial, M.M., Ibu

Irta Syahrial, S.H., M.S, Dr. dr. Windhu Purnomo, M.S., Robby Sondakh

dan papa-mama lainnya di Retret Nasional yang begitu mendukung dan

(7)

vii

12. Sahabat-sahabat tercinta penulis dalam kelompok System View, Dicksen

Huang, Inge Sindya Pridawardani, Ermitha Ardiani Sita, Rurid Dwi

Anggraeni, dan Purba Sari Nastiti. Terima kasih untuk dukungan dalam

kasih dan semangat yang luar biasa mulai dalam setiap perjuangan dari

pengerjaan tugas kuliah, prosesinternshipsampai penyelesaian skripsi ini.

13. Teman – teman Manajemen angkatan 2008, khusususnya saudara –

saudaraku di konsentrasi Manajemen Operasi. Terima kasih atasspirit, unity,

and pridedalam perjuangan kita.

14. Teman – teman Program Studi Teknik Telekomunikasi angkatan 2007 dan

KMK. St John Politeknik Negeri Malang, terima kasih untuk kebersamaan

dan pengalaman berharga semasa kuliah teknik yang berat.

15. Rm. Cornelius Triwidja Utama,Pr, sebagai pastor pembimbing yang

memberikan kasih sayang seperti seorang ayah; Rm. Laurensius Roni, Pr.,

sebagai pastor pembimbing yang senantiasa menjadi kakak; Rm. Astanto

Adi, CM, sebagai pastor pendamping mahasiswa, Sr. Alfonza, P.Carm,

konselor yang bersyafaat bagi penulis; Sr. Hedwig, Ak., dan Sr. Caroline,

Ak, suster pembimbing penulis sedari kecil. Terima kasih untuk setiap

didikan dan pendampingan dalam setiap proses iman hingga penulis boleh

menjadi semakin dewasa.

16. Kak Anselmus Agung Pramudito, Mas Andreas K. Triantoro, dan Donny

Adrian Limadinata untuk setiap waktu yang di berikan untuk mendengarkan

(8)

viii

dalam doa, menguatkan ketika dalam kesesakan, dan membantu untuk

mengambil keputusan hidup.

17. Mas Tito Hario Rahadi untuk waktu, kesabaran, dan ketelatenan dalam

mengajarkan program Autocad dan dasar – dasar teknik sipil untuk

kelancaran proses pengerjaan skripsi ini.

18. Teman – teman kos, Lailatul Fitri, Jhessy Siagian, Yohana Ferdian, Nia

Ariestha, Agustin Dianita, Dian Jheny, Desi, dan Bu Roso, Terima kasih

untuk candaan, semangat, pengertian, dan persaudaraannya.

19. Teman-teman KKN – BBM Angkatan 44 Desa Tandon Sentul,

Kec.Lumbang, Kab. Probolinggo untuk kebersamaan selama bertugas

bersama masyarakat.

20. Teman – teman di UKM Paduan Suara Universitas Airlangga yang

memberikan irama dalam harmonisasi hidup perkuliahan penulis di kampus.

21. Kakak, adik, dan saudaraku di Unit Kegiatan Mahasiswa Kerohanian

Katholik Universitas Airlangga dan Pelayanan Kerohanian Katholik Fakultas

Ekonomi dan Bisnis Universitas Airlangga, yang telah menjadi keluarga

kedua bagi penulis, terima kasih untuk kasih persaudaraan dan bantuan tanpa

pamrih selama ini.

22. Teman – teman pelayanan di Pianis dan Organis Kristus Radja, Paduan

Suara Gemma Inventa, Sophistest Cantate Choir, Paduan Suara Mudika

Kristus Radja, Shalam Creative Ministry – Streamer DancerdanKeyboard

Class, yang memberikan pengalaman – pengalaman luar biasa dalam simfoni

(9)

ix

23. Teman – teman yang mampu menghibur dan membuat penulis tetap riang

dikegalauan penulisan skripsi ini, Mas Christian Setiawan, Mas Reza

Brianto, teman – teman di kelompok sel Shalam (Ce Sandra, Ce Lia, Ce

Suzan, Ko Wawan, Ce Dewi, Alvando dan Tya).

24. Teman – teman dan semua pihak yang membantu terselesaikannya skripsi ini

yang tidak dapat penulis sebutkan satu persatu, yang senantiasa menghibur,

menguatkan di dalam doa, mendukung baik material dan spiritual. Terima

kasih, berkat Tuhan senantiasa melimpah dalam kehidupan Saudara.

Penulis menyadari bahwa masih banyak kekurangan dalam skripsi ini

yang disebabkan adamya keterbatasan pengethuan, akses, referensi, dan

pengalaman. Oleh karena itu, penulis mengharapkan saran dan kritik yang

membangun sehingga dapat dijadikan acuan dalam penulisan skripsi-skripsi

selanjutnya. Akhir kata, penulis berharap semoga skripsi ini dapat bermanfaat

bagi penulis maupun semua pihak yang membutuhkan.

Surabaya, 3 Juli 2012

(10)

x

ABSTRAK

Bandar udara merupakan fasilitas berupa lapangan udara, termasuk segala bangunan dan peralatan, yang merupakan kelengkapan minimal untuk menjamin tersedianya fasilitas bagi angkutan udara dan penggunanya. Terkait denganlevel

of service, peningkatan pertumbuhan transportasi udara pun menuntut

ketersediaan fasilitas pada bandara untuk memberikan pelayanan secara profesional terhadap seluruh pengguna jasa yang memerlukannya. Perencanaan kapasitas merupakan proses untuk menentukan tipe dan jumlah dari sumber daya

yang dibutuhkan untuk mengimplementasikan rencana bisnis strategis

perusahaan. Tujuan dari perencanaan kapasitas adalah untuk menentukan level yang tepat dari kapasitas jasa dengan menentukan perpaduan yang tepat dari fasilitas, peralatan, dan pekerja yang dibutuhkan untuk memenuhi antisipasi permintaan.

Penelitian ini melakukan perencanaan kapasitas sebagai analisis kebutuhan kapasitas pada fasilitas sisi darat terminal penumpang keberangkatan domestik di Bandar Udara Internasional Juanda. Sebelum melakukan perencanaan kapasitas, penelitian ini menganalisis pemanfaatan kapasitas fasilitas sisi darat di tahun 2011 untuk mengetahui kondisi eksisting. Kemudian perencanaan kapasitas dimulai dengan meramalkan jumlah permintaan penumpang di tahun 2012 sampai dengan tahun 2025 dengan metode ekstrapolasi linier. Melalui

typical peak hour passenger(TPHP), hasil peramalan yang diperoleh digunakan

sebagai input untuk memprediksi kebutuhan kapasitas di tahun 2015 dan 2020

berdasarkan SKEP/77/VI/2005, standar level of service PT Angkasa Pura I

(Persero), dan standarlevel of servicedari IATA.

Hasil penelitian ini menunjukkan bahwa secara perspektif teknis, kebutuhan hall keberangkatan, check-in area, dan ruang tunggu keberangkatan di tahun 2011 telah melebihi kapasitas yang tersedia. Begitu pula dengan kebutuhan di tahun 2015 dan 2020, secara matematis masing-masing fasilitas

terkecuali toilet memerlukan penambahan kapasitas. Mengetahui adanya gap

antara kebutuhan di masa depan dengan ketersediaan fasilitas terminal

penumpang keberangkatan domestik saat ini, penelitian ini mengembangkan dan mengevaluasi alternatif – alternatif melalui perspektif teknis dan operasi yang

dapat digunakan sebagai perencanaan kapasitas di masa depan. Alternatif base

case ditawarkan sebagai strategi mengakomodasi kebutuhan kapasitas tanpa

melakukan ekspansi, dan alternatif ekspansi kapasitas ditawarkan sebagai strategi perencanaan kapasitas bila pihak manajemen melakukan rencana ekspansi. Kedua alternatif tersebut diharapkan mampu menjadi strategi untuk

mengakomadasi pertumbuhan transportasi udara yang tidak pasti dan sulit

diprediksikan.

Kata kunci : kapasitas, fasilitas, terminal penumpang keberangkatan

(11)

xi

ABSTRACT

Airport is a facility such as airfields, including all buildings and equipments, which is as a minimum furnished to ensure the availability of facilities for air transport and its users. Dependent of the level of service, increased growth in air transport demand require on the availability of airport facilities to provide professional services to all users. Capacity planning is a

process to determine types and amounts of resources that are required to

implement an company's strategic business plan. The purpose of capacity planning is to determine the appropriate level of service capacity to determine the proper mix of facilities, equipment, and workers needed to meet anticipated demand.

This paper will look in capacity planning as capacity requirements on the landside facilities in domestic departure passsenger terminal at the Juanda International Airport. Before doing capacity planning, this study analyzes the utilization of the capacity of the land side facilities in 2011 to determine the existing condition. Capacity planning begins with forecast passenger demand in 2012 until 2025 with the linear extrapolation method. Through a typical peak

hour passenger (TPHP), the forecast results is used as input to predict the

capacity requirements in 2015 and 2020 based on SKEP/77/VI/2005, the standard level of service PT Angkasa Pura I (Limited), and standard level of service of IATA.

This study indicates the capacity requirements in the year of 2011 of departure hall, check-in area and departure lounge as engineering perspective has exceeded the exsisting capacity. Similarly, Both the capacity requirement of each facilities, except toilet, in 2015 and 2020 are require additional capacity. Coping thee gap between the needs of the future with the availability of passenger terminal facilities at the domestic departure, this study develops and evaluates alternatives that can be used as a planning capacity in the future through engineering and operations perspective. Base case alternative is offered as an strategy to accommodate capacity requirement without expanding, and capacity expansion alternative is offered as capacity expansion planning strategy when airport management plan to expansion. Both alternatives are expected to be a strategy to accommodate growth in air transport which is uncertain and difficult to predict.

(12)

xii

DAFTAR ISI

Halaman Judul ...i

Halaman Persetujuan ... ii

Halaman Pernyataan Orisinalitas Skripsi ... iii

Kata Pengantar...iv

Abstrak ...x

Abstract ...xi

Daftar Isi ... xii

Daftar Tabel ... xviii

Daftar Gambar ...xxi

Daftar Lampiran... xxii

BAB I PENDAHULUAN ...1

1.1. Latar Belakang ...1

1.2. Rumusan Masalah ...7

1.3. Tujuan Penelitian ...8

1.4. Manfaat Penelitian ...9

1.5. Sistematika Penulisan ...10

(13)

xiii

2.1. Landasan Teori ...12

2.1.1. Kapasitas...12

2.1.1.1. Definisi Kapasitas ...12

2.1.1.2 Perencanaan Kapasitas...14

2.1.2. Peramalan ...17

2.1.2.1. Peramalan ...17

2.1.2.2. Keterkaitan antara Pengelolaan Kapasitas dengan Peramalan ...20

2.1.3. Bandara ...21

2.1.3.1. Pengertian Bandara ...21

2.1.3.2. Fasilitas Sisi Daraat (landside) ...22

2.1.3.3. Terminal Penumpang...22

2. 1.3.4. Fasilitas Terminal Penumpang Keberangkatan Domestik...23

2.1.3.5. Metode Peramalan Angkutan Udara...33

2.2. Penelitian Sebelumnya ...34

2.3. Pertanyaan Penelitian ...36

2.4. Kerangka Berpikir ...40

BAB III METODE PENELITIAN ...41

(14)

xiv

3.2. Ruang Lingkup Penelitian ...42

3.3. Jenis dan Sumber Data ...45

3.4. Prosedur Pengumpulan Data ...46

3.5. Teknik Analisis...48

3.5.1 Analisis Ketersediaan dan Kebutuhan Kapasitas Terminal Penumpang Keberangkatan Domestik di Tanuh 2011 ...48

3.5.2. Analisis Peramalan Permintaan Permintaan Penumpang di Masa Datang dengan Metode Ekstrapolasi Linier ...49

3.5.3. Analisis Kebutuhan Kapasitas Terminal yang Diperlukan di Tahun 2015 dan 2020 ...48

3.5.2. Anlisis Alternatif-Alternatif Perencanaan ...49

3.6. Tahapan Penelitian ...51

BAB IV ANALISIS DAN PEMBAHASAN ...56

4.1. Gambaran Umum Objek Penelitian...56

4.1.1. Sejarah Perusahaan ...56

4.1.2. Visi dan Misi Perusahaan ...57

4.1.3. Bidang Usaha ...58

4.1.4. Lokasi Perusahaan ...59

(15)

xv

4.1.6. Logo dan Arti ...64

4.1.7. Struktur Organisasi dan Pembagian Tugas ...65

4.2. Pengumpulan Data Jumlah Penumpang Tahun 2006 - 2011...66

4.3. Perhitungan Pemanfaatan Kapasitas Terminal Penumpang

Keberangkatan Domestik Tahun 2011 ...74

4.3.1. Perhitungan Pemanfaatan Kapasitas Fasilitas Sisi Darat Tahun

2011 berdasarkan Peraturan Direktur Jenderal Perhubungan

Udara Nomor SKEP/77/VI/2005 ...74

4.3.2. Perhitungan Pemanfaatan Kapasitas Fasilitas Sisi Darat Tahun

2011 berdasarkan Standar Level of Service Bandara

Internasional Juanda ...79

4.3.3. Perhitungan Pemanfaatan KapasitasCheck – inAre dan Ruang

Tunggu Keberangkatan pada Bulan Nopember Tahun 2011 ...80

4.4. Perhitungan Persamaan Ekstrapolasi Linier sebagai Metode Peramalan

...86

4.4.1. Perhitungan Persamaan Regresi Linier ...86

4.4.1. Uji Kooefesien Regresi Linier Sederhana...91

4.5 Perhitungan Kebutuhan Fasilitas Sisi Darat Terminal Penumpang

(16)

xvi

4.5.1 Perhitungan Kebutuhan Kapasitas Fasilitas Sisi Darat Terminal

Penumpang Keberangkatan Domestik Berdasarkan

SKEP/77/VI/2005 ...93

4.5.2. Perhitungan Kebutuhan Kapasitas Fasilitas Sisi Darat Terminal Penumpang Keberangkatan Domestik Berdasarkan Standar LOS PT Angkasa Pura I (Persero) ...99

4.5.3. Perhitungan Kebutuhan Kapasitas Fasilitas Sisi Darat Terminal Penumpang Keberangkatan Domestik Berdasarkan Standar LOS IATA ...100

4.6. Pembahasan ...104

4.6.1. Analisis Pemanfaatan Kapasitas Fasilitas Sisi Darat Tahun 2011 ...104

4.6.2. Analisis Pemanfaatan Kapasitas Check – in Area dan Ruang Tunggu Keberangkatan pada Bulan Nopember Tahun 2011 ...115

4.6.3. Analisis Kebutuhan Fasilitas Sisi Darat Terminal Penumpang Keberangkatan Domestik di Tahun 2015 dan Tahun 2020 ....115

4.6.4. Pengembangan dan Evaluasi Alternatif ...127

4.6.4.1. Analisis Alternatif Metode Perhitungan ...12

4.6.4.2. Analisis Rencana Alternatif ...128

(17)

xvii

4.6.4.2.2 Analisis Alternatif Ekspansi Kapasitas ...134

BAB V SIMPULAN DAN SARAN...135

5.1. Simpulan...135

5.1. Saran ...144

Daftar Pustaka...146

(18)

xviii

DAFTAR TABEL

Tabel 2.1 Lebar Kerb Standar...24

Tabel 2.2 LuasHallKeberangkatan berdasarkan Klasifikasi Terminal ...25

Tabel 2.3 JumlahSecurity GateBerdasarkan Klasifikasi Terminal ...27

Tabel 2.4 Standar Ruang LOS IATA untuk Terminal Penumpang Bandara pada Jam Sibuk ...31

Tabel 2.5 Standar LOS dari IATA dengan Versi Baru untukCheck-in Area ...31

Tabel 2.6 Standar LOS dari IATA dengan Versi Baru untuk Area Tunggu ...32

Tabel 2.7 Pertanyaan Penelitian ...24

Tabel 3.1 Typical Peak Hour Passenger (TPHP)menurut FAA ...25

Tabel 4.1 Spesifikasi Bandara Juanda ...60

Tabel 4.2 Data Pergerakan Penumpang Terminal Keberangkatan Domesik Bandar Udara Internasional Juanda Tahun 2006-2011 ...67

Tabel 4.3 Typical Peak Hour Passenger (TPHP)menurut FAA ...68

Tabel 4.4 Typical Peak Hour Passenger(TPHP) Terminal Keberangkatan Domestik Bandar Udara Internasional Juanda Tahun 2006-2011 ....69

(19)

xix

Tabel 4.6 Laporan Harian Kapasitas Ruang Tunggu Keberangkatan (Boarding

Lounge)Terminal Keberangkatan Domestik Tanggal 10 – 16

Nopember 2011 ...72

Tabel 4.7 Ukuran Fasilitas – Fasilitas Sisi Darat Terminal Penumpang

Keberangkatan Domestik Bandara Internasional Juanda ...73

Tabel 4.8 Kebutuhan Fasilitas Sisi Darat Terminal pada Keberangkatan

Domestik Bandara Internasional Juanda Tahun 2011 Berdasarkan

SKEP/VI/77/2005 ...74

Tabel 4.9 Laporan Pemanfaatan KapasitasCheck-in AreaTerminal

Keberangkatan Domestik Bandar Udara Internasional Juanda

Tanggal 10-16 Nopember, 2011 ...80

Tabel 4.10 Laporan Harian Pemanfaatan Kapasitas Ruang Tunggu

Keberangkatan Domestik Bandara Internasional Juanda Bulan

Nopember 2011...81

Tabel 4.11 Rekapitulasi Data Kapasitas RuangCheck-InPenumpang Pada Jam

Sibuk Di Bandar Udara Internasinal Juanda Bulan Nopember Tahun

2011 ...84

Tabel 4.12 Rekapitulasi Data Kapasitas Ruang Tunggu Penumpang Pada Jam

Sibuk di Bandar Udara Internasional Juanda Bulan Nopember Tahun

2011 ...84

Tabel 4.13 Data dan Perhitungan yang Diperlukan untuk Ekstrapolasi Linier ..86

Tabel 4.14 Nilai Parameter untuk Persamaan Regresi ...86

(20)

xx

Tabel 4.16 Level of Service IATA Versi Lama di Area Tunggu/Sirkulasi ...100

Tabel 4.17 StanderLevel of ServiceIATA Versi Baru ...101

Tabel 4.18 Hasil Perhitungan Kebutuhan Kapasitas ...101

Tabel 4.19 Standar LOS dari IATA untukCheck-in Area Versi LamaKebutuhan Fasilitas Sisi Darat Terminal pada Keberangkatan Domestik Bandara nternasional Juanda Tahun 2011 Berdasarkan SKEP/VI/77/2005 ...102

Tabel 4.20 Standar LOS dari IATA Versi Baru untuk Check-in Area...103

Tabel 4.21 Kebutuhan KapasitasCheck-in AreaTahun 2015 dan 2020 ...103

Tabel 4.22 Kalkulasi Kebutuhan Kapasitas Tahun 2011...104

Tabel 4.23 Perhitungan Kebutuhan Kapasitas FasilitasCheck-in Area ...117

Tabel 4.24 Perhitungan Gap Kebutuhan Fasilitas di Tahun 2011, 2015, dan 2020 dengan Kapasitas Eksisting berdasarkan SKEP/77/VI/2005 123 Tabel 4.25 Perhitungan Gap Kebutuhan Fasilitas di Tahun 2011, 2015, dan 2020 dengan Kapasitas Eksisting berdasarkan StandarLevel of Service2,04 m2perpaxoleh PT Angkasa Pura I (Persero) ...124

Tabel 4.26 Perhitungan Gap Kebutuhan Fasilitas di Tahun 2011, 2015, dan 2020 dengan Kapasitas Eksisting berdasarkan StandarLevel of Service Tipe C dari IATA Versi Lama ...124

(21)

xxi

DAFTAR GAMBAR

Gambar 4.1 Logo PT Angkasa Pura I (Persero) ...64

Gambar 4.2. Grafik Pertumbuhan Penumpang Domestik Tahun 2006-2011...68

Gambar 4.3 Grafik Pemanfaatan Kapastias Terminal Penumpang Tahun 2006-2011 ...68

Gambar 4.4 Grafik Linier Trendline untuk Model Persamaan Regresi ...89

Gambar 4.5 Kerb Bandar Udara Internasional Juanda ...106

Gambar 4.6 Hall Terminal Keberangkatan Bandara Juanda ...107

Gambar 4.7Check-in areaTerminal Keberangkatan Domestik ...109

Gambar 4.8 Check-in CounterTerminal Keberangkatan Domestik ...110

Gambar 4.9 Antrian Melewati Security Gate ...111

Gambar 4.10 Ruang Tunggu Keberangkatan (boarding lounge) ...113

Gambar 4.11 Kursi di RuangMeeting Point ...114

Referensi

Dokumen terkait

Pada setiap stasiun belajar disediakan juga kunci jawaban dalam amplop yang dapat dilihat atau dibaca setelah pembelajar menyelesaikan tugas di stasiun tersebut.Tugas-tugas

Buah mangga yang disimpan secara modifikasi atmosfir lebih rendah persentase kerusakan dan susut beratnya daripada tanpa kemasan, Aktivitas enzim ACC oksidase

Penelitian bertujuan untuk mengetahui beberapa aspek biologi ikan Bujuk ( Channa cy- anospilos ) meliputi pola pertumbuhan, Fekun- ditas dan hubungannya dengan panjang total dan

Dari tabel dan gambar tersebut dapat dilihat bahwa semua klon bawang merah yang diuji dengan varietas pembanding Bauji dan Bima Brebes menunjukkan intensitas serangan yang

20 M B A Ismail, Perbankan Syariah (Kencana, 2017), 211–212. Barang Gadai Penerima Gadai Pembiayaan Nasabah Akad Pembayaran + biaya.. dengan jumlah yang telah ditaksir

di bidang penyediaan data dan informasi statistik yang berkualitas, sedangkan Program PSPA BPS bertujuan untuk memelihara dan meningkatkan sarana dan prasarana

Analisis farmer’s share digunakan untuk membandingkan tingkat harga yang diterima oleh petani dengan harga yang dibayarkan oleh konsumen akhir (Limbong dan Sitorus ,

The demands of the religious minorities greatly unnerved the more conservative Hindus, especially the Hindutva-oriented ones (Hoftun, Reaper and Whelpton 1999: 312-13). The issue