Page 1 of 14 PENGUMUMAN TRAFIK

12 MAC 2021

1. LANJUTAN PENUTUPAN LORONG SECARA BERKALA DI KM7.6 (ARAH KUALA LUMPUR & ARAH PUTRAJAYA) DI LEBUHRAYA MAJU EXPRESSWAY (MEX)

Tarikh 15 Mac 2021 – 9 April 2021

Masa 11.00 malam – 5.00 pagi

Jangka masa 26 hari

Tujuan Untuk kerja-kerja pembaikan pada kekotak segmen, pemasangan penghadang bunyi dan sebarang kerja yang berkaitan.

Untuk makluman, penutupan lorong secara berkala di KM7.6 (Arah Kuala Lumpur & Arah

Putrajaya) di Lebuhraya Maju Expressway (MEX) akan dilanjutkan dari 15 Mac 2021 hingga

9 April 2021. Tempoh masa untuk kerja-kerja akan bermula dari 11:00 malam - 5:00 pagi selama 26 hari. Pelan pengurusan trafik adalah seperti berikut:

Penutupan A & B - PETA 1(A): Penutupan sepanjang 500 meter di lorong paling kiri dan lorong tengah (Arah Kuala Lumpur & Arah Putrajaya). Pengguna jalan raya yang ingin ke Kuala Lumpur dan Putrajaya masing-masing masih boleh menggunakan satu lorong sedia ada (seperti yang

ditunjukkan oleh anak panah HIJAU &MAGENTA dalam peta).

Penutupan C & D - PETA 1(B): Penutupan sepanjang 500 meter di lorong paling kanan dan lorong tengah (Arah Kuala Lumpur & Arah Putrajaya). Pengguna jalan raya yang ingin ke Kuala Lumpur dan Putrajaya masing-masing masih boleh menggunakan satu lorong sedia ada (seperti

yang ditunjukkan oleh anak panah BIRU MUDA & MERAH JAMBU dalam peta).

Penutupan E - PETA 1(C): Penutupan sepanjang 500 meter di lorong paling kanan (Arah Kuala Lumpur & Arah Putrajaya). Pengguna jalan raya yang ingin ke Kuala Lumpur dan Putrajaya masing-masing masih boleh menggunakan dua lorong sedia ada (seperti yang ditunjukkan oleh

anak panah BIRU dalam peta).

Semua penutupan akan dilaksanakan secara berkala dan berperingkat.

Pengguna jalan raya dinasihatkan untuk mematuhi arahan papan tanda trafik dan pengawal bendera yang bertugas. Untuk maklumat lanjut, sila rujuk peta di bawah.

……….

1. CONTINUATION OF INTERMITTENT LANE CLOSURE AT KM7.6 (KUALA LUMPUR-BOUND & PUTRAJAYA-BOUND) AT MAJU EXPRESSWAY (MEX),

Date 15 March 2021 -9 April 2021

Time 11.00pm – 5.00am

Duration 26 days

Reason To facilitate the rectification works for segmental box girder, installation of noise barrier and any other related works.

(2)

Please be advised, intermittent lane closures will continue at KM7.6 (Kuala Lumpur-bound and

Putrajaya-bound) at Maju Expressway (MEX) from 15 March 2021 until 9 April 2021. The

construction works will be carried out from 11:00pm - 5:00am over a period of 26 days. The

traffic management plans are as below:

Closure A & B - MAP 1(A): Left-most lane and middle lane closure (Kuala Lumpur-bound & Putrajaya-bound) for a stretch 500 metres while, one lane will be made available for motorists

heading towards Kuala Lumpur and Putrajaya (as indicated by the GREEN & MAGENTAarrows

in the map appended map).

Closure C & D - MAP 1(B): Right-most lane and middle lane closure (Kuala Lumpur-bound &

Putrajaya-bound)for a stretch 500 metres while, one lane will be made available for motorists

heading towards Kuala Lumpur and Putrajaya (as indicated by the LIGHT BLUE & PINK arrows in

the appended map).

Closure E - MAP 1(C): Right-most lane closure (Kuala Lumpur-bound & Putrajaya-bound) for a stretch 500 metres while, two lanes will be made available for motorists heading towards Kuala

Lumpur and Putrajaya (as indicated by the BLUE arrows in the appended map).

All closures will be conducted intermittently by stages.

Motorists are advised to follow the traffic signage and the direction of the flagmen during the activation of these road closures. For further information, please refer to maps below.

(3)

Page 3 of 14 PETA 1(B): LANJUTAN PENUTUPAN LORONG SECARA BERKALA DI KM 7.6 (ARAH KUALA

LUMPUR & ARAH PUTRAJAYA) DI LEBUHRAYA MAJU EXPRESSWAY (MEX) (NORTH-BOUND AND SOUTH-BOUND)

(4)

PETA 1(C): LANJUTAN PENUTUPAN LORONG SECARA BERKALA DI KM 7.6 (ARAH KUALA LUMPUR & ARAH PUTRAJAYA) DI LEBUHRAYA MAJU EXPRESSWAY (MEX)

(5)

Page 5 of 14 2. LANJUTAN PENUTUPAN LORONG SECARA BERKALA DI KUCHAI LAMA DARI KM12.0 HINGGA KM12.4 (ARAH SUNGAI BESI & ARAH KUALA LUMPUR), LEBUHRAYA SUNGAI BESI

Tarikh 15 Mac 2021 – 14 April 2021

Masa 11.00 malam – 5.00pagi

Jangka masa 31 hari

Tujuan Untuk kerja-kerja pembaikan pada kekotak segmen, pemasangan penghadang bunyi dan sebarang kerja yang berkaitan.

Untuk makluman, penutupan lorong secara berkala di Kuchai Lama dari KM12.0 hingga KM12.4

(Arah Sungai Besi dan Arah Kuala Lumpur) di Lebuhraya Sungai Besi akan dilanjutkan 15 Mac

2021 hingga 14 April 2021. Tempoh masa untuk kerja-kerja akan bermula dari 11:00 malam -5:00 pagi, selama 31 hari.

Semasa penutupan lorong kanan dan lorong tengah di Lebuhraya Sungai Besi (Arah Sungai Besi), Pengguna jalan raya yang ingin ke arah Sungai Besi masih boleh menggunakan satu lorong

sedia ada (seperti yang ditunjukkan oleh anak panah BIRU dalam peta).

Manakala, semasa penutupan lorong kanan (Arah Kuala-Lumpur) dilaksanakan, Pengguna jalan raya yang ingin ke arah Kuala Lumpur masih boleh menggunakan dua lorong sedia ada (seperti yang ditunjukkan oleh anak panah HIJAU dalam peta).

Pengguna jalan raya dinasihatkan untuk mematuhi arahan papan tanda trafik dan pengawal bendera yang bertugas. Untuk maklumat lanjut, sila rujuk peta di bawah.

……….

2. CONTINUATION OF INTERMITTENT LANE CLOSURES AT KUCHAI LAMA FROM KM12.0 TO KM12.4 (SUNGAI BESI-BOUND & KUALA LUMPUR-BOUND), SUNGAI BESI HIGHWAY

Date 15 March 2021 -14 April 2021

Time 11.00pm – 5.00am

Duration 31 days

Reason To facilitate the rectification works for segmental box girder, installation of noise barrier and any other related works.

Please be advised, intermittent lane closures will continue from at Kuchai Lama from KM12.0 to

KM12.4 (Sungai Besi-bound and Kuala Lumpur-bound), Sungai Besi Highway from 15 March

2021 until 14 April 2021. Construction works will be carried out from 11:00pm - 5:00am over a period of 31 days.

During the right-most lane and middle lane closure (Sungai Besi-bound), one lane will be made

available for the motorists heading towards Sungai Besi (as indicated by the BLUE arrows in the

appended map).

Meanwhile during the right-most lane (Kuala Lumpur-bound), motorists heading towards Kuala

Lumpur may use the two existing lanes (as indicated by the GREEN arrow in the appended

(6)

Motorists are advised to follow the traffic signage and the direction of the flagmen during the activation of these road closures. For further information, please refer to the map below.

PETA 2 : LANJUTAN PENUTUPAN LORONG SECARA BERKALA DI KUCHAI LAMA DARI KM12.0 HINGGA KM12.4 (ARAH SUNGAI BESI & ARAH KUALA LUMPUR)

DI LEBUHRAYA SUNGAI BESI (NORTH-BOUND AND SOUTH-BOUND)

(7)

Page 7 of 14 3. LANJUTAN PENUTUPAN LORONG SECARA BERKALA DAN BERPERINGKAT DI LEBUHRAYA SUNGAI BESI BERHAMPIRAN KAMPUNG MALAYSIA RAYA (ARAH SUNGAI BESI & ARAH KUCHAI LAMA)

Tarikh 15 Mac 2021 – 9 April 2021

Masa 11:00 malam – 5:00 pagi

Jangka Masa 26 hari

Tujuan Untuk kerja-kerja pembaikan pada kekotak segmen, pemasangan lampu jalan dan sebarang kerja yang berkaitan.

Untuk makluman, penutupan lorong secara berkaladan berperingkat di Lebuhraya Sungai Besi

berhampiran Kampung Malaysia Raya (Arah Sungai Besi dan Arah Kuchai Lama) akan

dilanjutkan dari 15 Mac 2021 hingga 9 April 2021. Tempoh masa untuk kerja-kerja akan

bermula dari 11.00 malam - 5.00 pagi, selama 26 hari. Pelan pengurusan trafik adalah seperti

berikut:

Penutupan A - PETA 3(A): Penutupan lorong kiri sepanjang 300 meter (Arah Sungai Besi). Pengguna jalan raya akan dilencongkan ke lorong tengah untuk menuju ke Sungai Besi (seperti yang ditunjukkan oleh anak panah HIJAU dalam peta).

Penutupan B - PETA 3(B): Penutupan sepanjang 500 meter di tiga lorong (Arah Sungai Besi) dan satu lorong (Arah Kuchai Lama). Pengguna jalan raya akan dilencongkan ke lorong paling kiri untuk meneruskan perjalanan ke Sungai Besi manakala pengguna yang ingin menuju Kuchai

Lama akan dilencongkan ke lorong tengah (seperti yang ditunjukkan oleh anak panah HIJAU

dalam peta).

Penutupan C - PETA 3(C): Penutupan sepanjang 500 meter di dua lorong (Arah Sungai Besi) dan tiga lorong (Arah Kuchai Lama). Pengguna jalan raya yang akan dilencongkan ke lorong kiri untuk menuju ke Sungai Besi manakala pengguna yang ingin menuju Kuchai Lama akan

dilencongkan ke lorong paling kiri (seperti yang ditunjukkan oleh anak panah HIJAU dalam

peta).

Penutupan D - PETA 3(D): Penutupan tiga lorong sepanjang 300 meter (Arah Kuchai Lama). Pengguna jalan raya yang ingin menuju ke Kuchai Lama akan dilencongkan ke lorong kanan (seperti yang ditunjukkan oleh anak panah HIJAU dalam peta).

Penutupan A, B, C & D akan dilaksanakan secara berkala dan berperingkat.

Pengguna jalan raya dinasihatkan untuk mematuhi arahan papan tanda trafik dan pengawal bendera yang bertugas. Untuk maklumat lanjut, sila rujuk peta di bawah.

(8)

3. CONTINUATION OF INTERMITTENT LANE CLOSURES BY STAGES ALONG SUNGAI BESI HIGHWAY NEAR KAMPUNG MALAYSIA RAYA (SUNGAI BESI BOUND & KUCHAI LAMA BOUND)

Date 15 March 2021 – 9 April 2021

Time 11:00pm – 5:00am

Duration 26 days

Reason To facilitate the rectification works for segmental box girder, installation of street lights and any other related works.

Please be advised, intermittent lane closure by stages will continue at Sungai Besi Highway

near Kampung Malaysia Raya (Sungai Besi-bound and Kuchai Lama-bound) from 15 March 2021

until 9 April 2021. The construction works will be carried out from 11.00pm - 5.00am over a period of 26 days. The traffic management plans are as below:

Closure A – MAP 3(A): Left lane closure for a stretch of 300 metres (Sungai Besi-bound) while, motorists will be diverted to the middle lane to continue heading towards Sungai Besi (as indicated by the GREEN arrows in the appended map).

Closure B - MAP 3(B): Three lane closures (Sungai Besi-bound) and one lane closure (Kuchai Lama-bound) for a stretch of 500 metres. Motorists will be diverted to the left most lane to continue heading towards Sungai Besi while motorists heading to Kuchai Lama will be diverted to the middle lane (as indicated by the GREEN arrows in the appended map).

Closure C - MAP 3(C): Two lane closures (Sungai Besi-bound) and three lane closures (Kuchai Lama-bound) for a stretch of 500 metres. Motorists will be diverted to the left lane to continue heading towards Sungai Besi while motorists heading to Kuchai Lama will be diverted to the left most lane (as indicated by the GREEN arrows in the appended map).

Closure D - MAP 3(D): Three lane closures for a stretch of 300 metres (Kuchai Lama-bound). Motorists will be diverted to the right lane to continue heading towards Kuchai Lama (as indicated by the GREEN arrows in the appended map).

Closure A, B, C & D will be conducted intermittently by stages.

Motorists are advised to follow the traffic signage and the direction of the flagmen during the activation of these road closures. For further information, please refer to the maps below.

(9)

Page 9 of 14

PETA 3(A): LANJUTAN PENUTUPAN LORONG SECARA BERKALA DAN BERPERINGKAT DI LEBUHRAYA SUNGAI BESI BERHAMPIRAN KAMPUNG MALAYSIA RAYA

(ARAH SUNGAI BESI & ARAH KUCHAI LAMA)

PETA 3(B): LANJUTAN PENUTUPAN LORONG SECARA BERKALA DAN BERPERINGKAT DI LEBUHRAYA SUNGAI BESI BERHAMPIRAN KAMPUNG MALAYSIA RAYA

(10)

PETA 3(C) : LANJUTAN PENUTUPAN LORONG SECARA BERKALA DAN BERPERINGKAT DI LEBUHRAYA SUNGAI BESI BERHAMPIRAN KAMPUNG MALAYSIA RAYA

(11)

Page 11 of 14 4. LANJUTAN PENUTUPAN LORONG DI LEBUHRAYA PINTASAN DENGKIL FT29 – PUTRAJAYA (ARAH PUCHONG DAN CYBERJAYA)

Tarikh 15 Mac 2021 - 23 Jun 2021

Masa 7:00 pagi – 7:00 malam & 8:00 malam – 6:00 pagi

Jangka masa 3 bulan

Tujuan Untuk kerja-kerja penyelengaraan serta membaik pulih jalan dan sebarang kerja berkaitan

Untuk makluman, penutupan lorong di Lebuhraya Pintasan Dengkil FT29 (Arah Puchong & Arah

Cyberjaya) akan dilanjutkan dari 15 Mac 2021 sehingga 23 Jun 2021. Tempoh masa untuk

kerja-kerja akan bermula dari 7:00 pagi - 7:00 malam dan 8:00 malam - 6:00 pagi, selama 3 bulan.

Pelan pengurusan trafik adalah seperti berikut:

Penutupan A: Semasa penutupan sepanjang 100-meter di lorong kiri dan laluan motosikal di susur keluar ke Persimpangan Putrajaya Sentral, pengguna jalan raya dan penunggang motosikal akan dilencongkan ke lorong kanan.

Penutupan B: Semasa penutupan sepanjang 200-meter di lorong paling kanan menghala ke Puchong/Kajang dan Cyberjaya/Dengkil, pengguna jalan raya akan dilencongkan ke lorong tengah, di kedua-dua arah.

Pengguna jalan raya dinasihatkan untuk mematuhi arahan papan tanda trafik dan pengawal bendera yang bertugas. Untuk maklumat lanjut, sila rujuk peta di bawah.

………. 4. CONTINUATION OF LANE CLOSURES ALONG PINTASAN DENGKIL HIGHWAY FT29

PUTRAJAYA (PUCHONG AND CYBERJAYA BOUND)

Date 15 March 2021 - 23 June 2021

Time 7:00 am – 7:00 pm & 8:00 am – 6:00 am

Duration 3 months

Reason To facilitate the maintenance, reinstatement road and any other related works Please be advised, lane closures will continue along Pintasan Dengkil Highway FT29

(Putrajaya-bound and Cyberjaya-(Putrajaya-bound) from 15 March 2021 until 23 June 2021. Construction works will

be carried out from 7:00am – 7:00pm and 8:00pm – 6:00am over a period of 3 months. The

traffic management plans are as below:

Closure A: During the left lane closure and motorcycle lane closure for a stretch of 100 metres on the ramp going down to Persimpangan Putrajaya Sentral, motorists will be diverted to the right lane.

Closure B: During the right-most lane (both bounds) closure for a stretch of 200 metres heading towards Puchong/Kajang and Cyberjaya/Dengkil, motorists will be diverted to the middle lane for both bounds.

(12)

Motorists are advised to follow the traffic signage and the direction of the flagmen during the activation of these road closures. For further information, please refer to the map below.

PETA 4: LANJUTAN PENUTUPAN LORONG DI LEBUHRAYA PINTASAN DENGKIL FT29 –

(13)

Page 13 of 14 5. LANJUTAN PENUTUPAN LORONG KIRI SECARA BERKALA DI LEBUH FT29 PINTASAN DENGKIL (ARAH PUCHONG DAN ARAH CYBERJAYA)

Tarikh 15 Mac 2021 - 23 Jun 2021

Masa 7:00 pagi – 7:00 malam & 8:00 malam – 6:00 pagi

Jangka masa 3 bulan

Tujuan Untuk kerja-kerja penghantaran barang binaan dan sebarang kerja berkaitan

Untuk makluman, penutupan lorong kiri secara berkala di Lebuh Pintasan Dengkil FT29 (Arah

Puchong dan Arah Cyberjaya) akan dilanjutkan dari 15 Mac 2021 hingga 23 Jun 2021. Tempoh

masa untuk kerja-kerja akan bermula dari 7:00 pagi – 7:00 malam dan 8:00 malam – 6:00 pagi,

selama 3 bulan. Pelan pengurusan trafik adalah seperti berikut:

Penutupan A: Semasa penutupan lorong kiri sepanjang 120-meter di susur keluar ke Persimpangan Putrajaya Sentral, Lebuh Pintasan Dengkil FT29, pengguna jalan raya menghala ke Putrajaya Sentral akan dilencongkan ke lorong kanan (seperti yang ditunjukkan oleh anak

panah UNGU dalam peta).

Penutupan B: Semasa penutupan lorong kiri sepanjang 120-meter di susur keluar ke Persiaran APEC, pengguna jalan raya menghala ke Persiaran APEC akan dilencongkan ke lorong kanan (seperti yang ditunjukkan oleh anak panah HIJAU dalam peta).

Pengguna jalan raya dinasihatkan untuk mematuhi arahan papan tanda trafik dan pengawal bendera yang bertugas. Untuk maklumat lanjut, sila rujuk peta di bawah.

……… 5. CONTINUATION OF INTERMITTENT LEFT LANE CLOSURES ALONG LEBUH PINTASAN DENGKIL, FT29 (PUCHONG-BOUND AND CYBERJAYA-BOUND)

Date 15 March 2021 - 23 June 2021

Time 7:00 am – 7:00 pm & 8:00 am – 6:00 am

Duration 3 months

Reason To facilitate the construction material delivery and any other related works Please be advised, intermittent left lane closures will continue along Lebuh Pintasan Dengkil

FT29 (Puchong-Bound and Cyberjaya-Bound) from 15 March 2021 until 23 June 2021. The

Construction works will start from 7:00am – 7:00pm and 8:00pm – 6:00am, for 3 months. The

traffic management plans are as below:

Closure A: During the left lane closure for a stretch of 120 metres at the slip road heading to Persimpangan Putrajaya Sentral, Lebuh Pintasan Dengkil FT29, motorists heading to Putrajaya

Sentral will be diverted to the right lane (as indicated by the PURPLE arrows in the appended

(14)

Closure B: During the left lane closure for a stretch of 120 metres at the slip road heading to Persiaran APEC, Cyberjaya, motorists heading to Persiaran APEC will be diverted to the right lane (as indicated by the GREEN arrows in the appended map).

Motorists are advised to follow the traffic signage and the direction of the flagmen during the activation of these road closures. For further information, please refer to the map below.

For media enquiries, please contact:

Anizam bin Ali (Item 1-3) Tel: +6019 293 4056 [email protected]

Muhammad Amir Norasikin (Item 4-5) Tel: 6014 667 8879 [email protected]

Mohar Zainal Abidin (Item 1-5) Tel: +603 7493 3961 [email protected]

PETA 5: LANJUTAN PENUTUPAN LORONG KIRI SECARA BERKALA DI LEBUH FT29 PINTASAN DENGKIL

Referensi

Dokumen terkait

Semasa penutupan lorong sepanjang 150 meter di Jalan Putra Permai (Arah Puchong) dilaksanakan, pengguna jalan raya dari arah Serdang menghala ke Puchong dan

PETA 6(B) – (Penutupan 2): Semasa penutupan jalan penuh di hadapan Kompleks Mutiara (Arah Kuala Lumpur) dijalankan, pengguna jalan raya di Jalan Ipoh yang

180 AEON Taman Maluri Shopping Centre Kuala Lumpur 181 Amber Plaza 3A, Jalan Jelawat 1 Kuala Lumpur 182 Ativo Plaza, Bandar Sri Damansara Kuala Lumpur. 183 Aurora Place, Bukit

Secara umum dapat disimpulkan bahwa dari sembilan Sasaran Strategis yang ditetapkan dalam Perjanjian Kinerja Tahun 2016, 8 (delapan) diantaranya berwarna hijau

Dasar pelaksanaan kegiatan SUPM Pontianak tahun 2016, mengacu kepada Sistem Akuntabilitas Kinerja Instansi Pemerintah (SAKIP), yang terdiri dari kebijakan yang telah ditetapkan

Persiapan peneliti untuk melaksanakan analisis dengan mencari sebuah cerepn yang akan dijadikan objek penelitian. Selanjutnya peneliti menentukan sebuah cerpen

Pada gambar 2 dapat dilihat simulasi sistem kontrol pada software TIA Portal yang tertera pada gambar 3 dengan blok PID Compact sebagai controller lalu blok Plant motor DC

Dalam pengumpulan data untuk pembuatan dokumen SLR, SLA dan OLA dilakukan dengan wawancara terhadap pengguna layanan email yang berfokus pada dosen dan staff,