8.1.02.03.04.0026.00019 1 M3 Pemasangan Batu Bata Merah, Kelas 1, Campuran (1 Pc : 3 Pp) M3 Nilai Hspk 1,634,600.00
sbu_64 Tenaga Mandor 0.240 Oh 214,800.00 51,552.00
sbu_63 Tenaga Kepala Tukang 0.240 Oh 193,300.00 46,392.00
sbu_69 Tenaga Tukang 1.200 Oh 179,000.00 214,800.00
sbu_66 Tenaga Pekerja 2.400 Oh 143,200.00 343,680.00
ssh_459 Semen Pc 40 Kg 132.000 kg 1,885.00 248,820.00
ssh_362 Pasir Pasang 0.370 M3 390,000.00 144,300.00
ssh_41 Bata Merah Kelas 1 500.000 Buah 1,170.00 585,000.00
8.1.02.03.04.0026.00020 1 M3 Pemasangan Batu Bata Merah, Kelas 1, Campuran (1 Pc : 4 Pp) M3 Nilai Hspk 1,588,500.00
sbu_64 Tenaga Mandor 0.240 Oh 214,800.00 51,552.00
sbu_63 Tenaga Kepala Tukang 0.240 Oh 193,300.00 46,392.00
sbu_69 Tenaga Tukang 1.200 Oh 179,000.00 214,800.00
sbu_66 Tenaga Pekerja 2.400 Oh 143,200.00 343,680.00
ssh_459 Semen Pc 40 Kg 106.500 kg 1,885.00 200,752.50
ssh_362 Pasir Pasang 0.375 M3 390,000.00 146,250.00
ssh_41 Bata Merah Kelas 1 500.000 Buah 1,170.00 585,000.00
8.1.02.03.04.0026.00021 1 M3 Pemasangan Batu Bata Merah, Kelas 1, Campuran (1 Pc : 5 Pp) M3 Nilai Hspk 1,569,100.00
sbu_64 Tenaga Mandor 0.240 Oh 214,800.00 51,552.00
sbu_63 Tenaga Kepala Tukang 0.240 Oh 193,300.00 46,392.00
sbu_69 Tenaga Tukang 1.200 Oh 179,000.00 214,800.00
sbu_66 Tenaga Pekerja 2.400 Oh 143,200.00 343,680.00
ssh_459 Semen Pc 40 Kg 89.000 kg 1,885.00 167,765.00
ssh_362 Pasir Pasang 0.410 M3 390,000.00 159,900.00
ssh_41 Bata Merah Kelas 1 500.000 Buah 1,170.00 585,000.00
8.1.02.03.04.0026.00022 1 M3 Pemasangan Batu Bata Merah, Kelas 1, Campuran (1 Pc : 6 Pp) M3 Nilai Hspk 1,573,900.00
sbu_64 Tenaga Mandor 0.240 Oh 214,800.00 51,552.00
sbu_63 Tenaga Kepala Tukang 0.240 Oh 193,300.00 46,392.00
sbu_69 Tenaga Tukang 1.200 Oh 179,000.00 214,800.00
sbu_66 Tenaga Pekerja 2.400 Oh 143,200.00 343,680.00
ssh_459 Semen Pc 40 Kg 75.000 kg 1,885.00 141,375.00
ssh_362 Pasir Pasang 0.490 M3 390,000.00 191,100.00
ssh_41 Bata Merah Kelas 1 500.000 Buah 1,170.00 585,000.00
8.1.02.03.04.0026.00034 1 M3 Pembuatan Bronjong Dengan Kawat Galvanis M3 Nilai Hspk 1,014,800.00
sbu_66 Tenaga Pekerja 2.033 Oh 143,200.00 291,182.88
sbu_69 Tenaga Tukang 0.733 Oh 179,000.00 131,278.60
sbu_64 Tenaga Mandor 0.025 Oh 214,800.00 5,370.00
ssh_217 Kawat Bronjong Uk. 2 x 1 x 0,5 M, Lubang 8 x 10 cm 1.000 M3 183,950.00 183,950.00
ssh_59 Batu Pecah Mesin Uk. 3 - 5 cm 1.000 M3 403,000.00 403,000.00
9.1.2.18.04.11.004 Pekerjaan Pemancangan
8.1.02.03.04.0026.00023 1 M1 Pemancangan Panjang Cerucuk Gelam Dia. 8–10 Cm M1 Nilai Hspk 53,100.00
sbu_64 Tenaga Mandor 0.003 Oh 214,800.00 644.40
sbu_66 Tenaga Pekerja 0.030 Oh 143,200.00 4,296.00
ssh_122 Dolken Kayu Dia. 8 - 10 x 400 cm 0.263 Batang 19,500.00 5,118.75
sbu_37 Sewa Excavator 0.040 Jam 1,075,382.10 43,015.28
8.1.02.03.04.0026.00024 1 M2 Pemasangan Turap Papan Tebal 3 Cm M2 Nilai Hspk 293,200.00
sbu_64 Tenaga Mandor 0.025 Oh 214,800.00 5,370.00
sbu_63 Tenaga Kepala Tukang 0.008 Oh 193,300.00 1,546.40
sbu_69 Tenaga Tukang 0.080 Oh 179,000.00 14,320.00
sbu_66 Tenaga Pekerja 1.000 Oh 143,200.00 143,200.00
ssh_562 Kayu Kamper Papan Uk. 2 x 20 x 400 cm 0.030 M3 4,030,000.00 120,900.00
ssh_352 Paku Biasa Uk. 2 inch - 5 inch 0.300 Kg 26,000.00 7,800.00
9.1.2.18.04.11.005 Pekerjaan Dewatering
9.1.2.18.05.01.001 Pekerjaan Beban Pemeliharaan Aset Tetap Lainnya
8.1.02.03.04.0026 1 Batang Pengapuran Dan Pengecatan Pohon Batang Nilai Hspk 28,200.00
sbu_64 Tenaga Mandor 0.002 Oh 214,800.00 429.60
Kode Barang Uraian Spesifikasi Vol. Sat. Harga Sat. Jumlah
sbu_63 Tenaga Kepala Tukang 0.006 Oh 193,300.00 1,140.47
sbu_69 Tenaga Tukang 0.059 Oh 179,000.00 10,471.50
ssh_94 Cat Tembok 0.050 Galon 237,250.00 11,862.50
ssh_96 Cat Kayu 0.050 Kg 75,400.00 3,770.00
ssh_333 Minyak Cat Biasa 0.015 Kaleng 32,500.00 487.50
8.1.02.03.04.0026 1 M2 Membabat/ Merapikan Rumput Tinggi < 20 Cm M2 Nilai Hspk 3,400.00
sbu_64 Tenaga Mandor 0.001 Oh 214,800.00 107.40
sbu_69 Tenaga Tukang 0.010 Oh 179,000.00 1,790.00
sbu_66 Tenaga Pekerja 0.010 Oh 143,200.00 1,432.00
8.1.02.03.04.0026 1 M2 Membabat/ Merapikan Rumput 20 Cm < Tinggi < 50 Cm M2 Nilai Hspk 5,200.00
sbu_64 Tenaga Mandor 0.001 Oh 214,800.00 107.40
sbu_69 Tenaga Tukang 0.020 Oh 179,000.00 3,580.00
sbu_66 Tenaga Pekerja 0.010 Oh 143,200.00 1,432.00
8.1.02.03.04.0026 1 M2 Membabat/ Merapikan Rumput Tinggi > 50 Cm Ringan M2 Nilai Hspk 8,400.00
sbu_64 Tenaga Mandor 0.001 Oh 214,800.00 107.40
sbu_69 Tenaga Tukang 0.030 Oh 179,000.00 5,370.00
sbu_66 Tenaga Pekerja 0.020 Oh 143,200.00 2,864.00
8.1.02.03.04.0026 1 M2 Membabat/ Merapikan Rumput Tinggi > 50 Cm Berat M2 Nilai Hspk 12,000.00
sbu_64 Tenaga Mandor 0.001 Oh 214,800.00 107.40
sbu_69 Tenaga Tukang 0.030 Oh 179,000.00 5,370.00
sbu_66 Tenaga Pekerja 0.045 Oh 143,200.00 6,444.00
8.1.02.03.04.0026 1 M2 Mengolah Tanah (mencangkul) Sedalam 30 Cm M2 Nilai Hspk 18,700.00
sbu_64 Tenaga Mandor 0.004 Oh 214,800.00 751.80
sbu_69 Tenaga Tukang 0.100 Oh 179,000.00 17,900.00
8.1.02.03.04.0026 1 M2 Ongkos Kerja Menanam Tanaman Pagar M2 Nilai Hspk 19,000.00
sbu_64 Tenaga Mandor 0.005 Oh 214,800.00 1,074.00
sbu_69 Tenaga Tukang 0.100 Oh 179,000.00 17,900.00
8.1.02.03.04.0026 1 M2 Ongkos Menanam Semak Hias (15 Batang) M2 Nilai Hspk 63,400.00
sbu_64 Tenaga Mandor 0.020 Oh 214,800.00 4,296.00
sbu_69 Tenaga Tukang 0.330 Oh 179,000.00 59,070.00
8.1.02.03.04.0026 Ongkos Kerja Penanaman Pohon Pelindung Tinggi 1,5 M Batang Nilai Hspk 75,900.00
sbu_64 Tenaga Mandor 0.020 Oh 214,800.00 4,296.00
sbu_69 Tenaga Tukang 0.400 Oh 179,000.00 71,600.00
8.1.02.03.04.0026 Ongkos Kerja Penanaman Pohon Semak Tinggi 1 M Pohon Nilai Hspk 75,900.00
sbu_64 Tenaga Mandor 0.020 Oh 214,800.00 4,296.00
sbu_69 Tenaga Tukang 0.400 Oh 179,000.00 71,600.00
8.1.02.03.04.0026 Ongkos Kerja Penanaman Pohon Semak Tinggi : 30-40 Cm Pohon Nilai Hspk 75,900.00
sbu_64 Tenaga Mandor 0.020 Oh 214,800.00 4,296.00
sbu_69 Tenaga Tukang 0.400 Oh 179,000.00 71,600.00
8.1.02.03.04.0026 Ongkos Kerja Penanaman Pohon Semak Tinggi : 10 Cm Pohon Nilai Hspk 75,900.00
sbu_64 Tenaga Mandor 0.020 Oh 214,800.00 4,296.00
sbu_69 Tenaga Tukang 0.400 Oh 179,000.00 71,600.00
8.1.02.03.04.0026 Ongkos Kerja Penanaman Pohon Semak Tinggi : 100-120 Cm Pohon Nilai Hspk 75,900.00
sbu_64 Tenaga Mandor 0.020 Oh 214,800.00 4,296.00
sbu_69 Tenaga Tukang 0.400 Oh 179,000.00 71,600.00
8.1.02.03.04.0026 Ongkos Kerja Penanaman Pohon Semak Tinggi : 40-50 Cm Pohon Nilai Hspk 75,900.00
sbu_64 Tenaga Mandor 0.020 Oh 214,800.00 4,296.00
sbu_69 Tenaga Tukang 0.400 Oh 179,000.00 71,600.00
8.1.02.03.04.0026 Ongkos Kerja Penanaman Pohon Semak Panjang Daun : 20 Cm Pohon Nilai Hspk 75,900.00
sbu_64 Tenaga Mandor 0.020 Oh 214,800.00 4,296.00
sbu_69 Tenaga Tukang 0.400 Oh 179,000.00 71,600.00
8.1.02.03.04.0026 1 M2 Pembuatan Grill Hollow Gutter M2 Nilai Hspk 1,127,900.00
sbu_64 Tenaga Mandor 0.003 Oh 214,800.00 644.40
sbu_63 Tenaga Kepala Tukang 0.006 Oh 193,300.00 1,159.80
sbu_69 Tenaga Tukang 0.060 Oh 179,000.00 10,740.00
sbu_66 Tenaga Pekerja 0.060 Oh 143,200.00 8,592.00
ssh_79 Besi Hollow Uk. 40 x 40 Tebal 1,2 mm 3.000 Meter 235,560.00 706,680.00
Hspk107.a Pengelasan 40.000 Cm 10,000.00 400,000.00
8.1.02.03.04.0026 1 Kg Pemasangan Baja Ringan Canai Dingin Profil C. 75 Kg Nilai Hspk 404,100.00
sbu_66 Tenaga Pekerja 0.734 Oh 143,200.00 105,108.80
sbu_69 Tenaga Tukang 0.734 Oh 179,000.00 131,386.00
sbu_63 Tenaga Kepala Tukang 0.073 Oh 193,300.00 14,110.90
sbu_64 Tenaga Mandor 0.037 Oh 214,800.00 7,947.60
ssh_78 Besi Canai Dingin C. 75 0.873 batang 149,500.00 130,513.50
ssh aksesoris 0.100 % 149,500.00 14,950.00
8.1.02.03.04.0026 1 M1 Pekerjaan Sumur Bor Chasing 4" M1 Nilai Hspk 852,000.00
Kode Barang Uraian Spesifikasi Vol. Sat. Harga Sat. Jumlah
sbu_64 Tenaga Mandor 0.282 Oh 214,800.00 60,466.20
sbu_63 Tenaga Kepala Tukang 0.373 Oh 193,300.00 72,062.24
sbu_69 Tenaga Tukang 0.463 Oh 179,000.00 82,860.73
sbu_66 Tenaga Pekerja 0.498 Oh 143,200.00 71,284.96
ssh_406 Pipa Pvc Aw Uk. 4 Inch x 4 M 0.791 Batang 530,400.00 419,811.19
sbu_15 Sewa Alat Bantu Strouss Pile 1.808 Jam 12,800.00 23,142.96
sbu_12 sewa Mud Pumping Machine 1.419 Jam 86,200.00 122,322.37
8.1.02.03.03.0001.00318 1 M3 Pemasangan Batu/talud M3 Nilai Hspk 1,342,900.00
sbu_64 Tenaga Mandor 0.075 Oh 214,800.00 16,110.00
sbu_63 Tenaga Kepala Tukang 0.075 Oh 193,300.00 14,497.50
sbu_66 Tenaga Pekerja 1.500 Oh 143,200.00 214,800.00
sbu_69 Tenaga Tukang 0.750 Oh 179,000.00 134,250.00
ssh_50 Batu Kali Uk. 15 - 20 cm 1.200 M3 364,000.00 436,800.00
ssh_362 Pasir Pasang 0.485 M3 390,000.00 189,150.00
ssh_459 Semen Pc 40 Kg 178.906 kg 1,885.00 337,237.06
8.1.02.03.03.0001.00319 1 M3 Pekerjaan Beton Bertulang Pilon + Angker M3 Nilai Hspk 72,145,900.00
ssh_459 Semen Pc 40 Kg 195.525 kg 1,885.00 368,565.53
ssh_362 Pasir Pasang 12.423 M3 390,000.00 4,845,142.05
ssh_58 Batu Pecah Mesin Uk. 2 - 3 cm 19.487 M3 284,375.00 5,541,656.39
ssh_225 Kayu Perancah 3.442 M3 3,250,000.00 11,187,637.50
ssh_345 Paku Uk. 4 - 7 cm 34.424 Kg 26,390.00 908,436.17
sbu_66 Tenaga Pekerja 275.388 Oh 143,200.00 39,435,561.60
sbu_69 Tenaga Tukang 55.078 Oh 179,000.00 9,858,890.40
8.1.02.03.03.0001.00320 1 M3 Galian Tanah Di Situ/sungai (standard) M3 Nilai Hspk 42,700.00
sbu_66 Tenaga Pekerja 0.034 Oh 143,200.00 4,926.08
sbu_64 Tenaga Mandor 0.003 Oh 214,800.00 730.32
sbu_37 Sewa Excavator 0.034 Jam 1,075,382.10 36,993.14
8.1.02.03.03.0001.00321 1 M3 Meratakan Hasil Galian Tanah Di Sungai (standard) M3 Nilai Hspk 24,000.00
sbu_66 Tenaga Pekerja 0.055 Oh 143,200.00 7,904.64
sbu_64 Tenaga Mandor 0.006 Oh 214,800.00 1,181.40
sbu_37 Sewa Excavator 0.014 Jam 1,075,382.10 14,840.27
8.1.02.03.03.0001.00322 1 M3 Pembuatan Dan Pemasangan Tiang Kayu Klas I M3 Nilai Hspk 9,565,500.00
sbu_66 Tenaga Pekerja 7.000 Oh 143,200.00 1,002,400.00
sbu_69 Tenaga Tukang 21.000 Oh 179,000.00 3,759,000.00
sbu_63 Tenaga Kepala Tukang 2.100 Oh 193,300.00 405,930.00
sbu_64 Tenaga Mandor 0.350 Oh 214,800.00 75,180.00
ssh_561 Kayu Balok 1.100 M3 3,900,000.00 4,290,000.00
ssh_345 Paku Uk. 4 - 7 cm 1.250 Kg 26,390.00 32,987.50
8.1.02.03.03.0001 1 M1 Pekerjaan Sumur Bor Chasing 6" M1 Nilai Hspk 330,000.00
sbu_64 Tenaga Mandor 0.075 Oh 214,800.00 16,110.00
sbu_63 Tenaga Kepala Tukang 0.125 Oh 193,300.00 24,162.50
sbu_69 Tenaga Tukang 0.125 Oh 179,000.00 22,375.00
sbu_66 Tenaga Pekerja 0.250 Oh 143,200.00 35,800.00
ssh_408 Pipa Pvc Aw Uk. 6 Inch x 4 M 0.600 Batang 220,900.00 132,540.00
sbu_15 Sewa Alat Bantu Strouss Pile 1.000 Jam 12,800.00 12,800.00
sbu_12 sewa Mud Pumping Machine 1.000 Jam 86,200.00 86,200.00
8.1.02.03.03.0001.00347 1 Unit Pekerjaan Membuat Meja Booth Tinggi 80 Cm Unit Nilai Hspk 4,300,000.00
ssh Tenaga Pekerja 2.432 Oh 143,200.00 348,305.88
ssh Tukang Kayu 3.446 Oh 179,000.00 616,805.88
ssh Kepala Tukang Kayu 0.075 Oh 193,300.00 14,468.38
ssh Tenaga Mandor 0.080 Oh 214,800.00 17,155.88
ssh Multipleks 12 Mm, Ex. Mercy 1.335 Lbr 325,000.00 433,795.47
ssh Multipleks 15 Mm Ex. Mercy 1.252 Lbr 370,500.00 463,722.55
ssh Melaminto 1.818 Lbr 227,500.00 413,708.66
ssh Hpl Ex. Taco 6.262 Lbr 273,000.00 1,709,409.63
ssh Paku Tembak F 30 0.364 Dos 71,500.00 26,055.88
ssh Sekrup 5 Cm -0.065 Kg 84,500.00 -5,469.12
ssh Sekrup 3 Cm -0.015 Kg 84,500.00 -1,244.12
ssh Sekrup 2,5 Cm -0.066 Kg 58,500.00 -3,844.12
ssh Lem Kayu Putih -0.063 Kg 45,500.00 -2,869.12
ssh Lem Kuning 0.201 Kg 65,000.00 13,055.88
ssh Engsel Lemari Ex. Dekson 1.627 Psg 26,000.00 42,305.88
ssh Handle Ex. Huben 1.503 Bh 19,500.00 29,305.88
ssh Signboard 0.950 Set 195,000.00 185,305.88
8.1.02.03.03.0001.00348 1 Kg Rangka Kuda-kuda Baja Iwf Baja Iwf 250 (125x10x19), Iwf 200 (150x9x16) kg Nilai Hspk 46,800.00
sshx Tenaga Pekerja 0.069 Oh 143,200.00 9,860.00
sshx Tukang Las Konstruksi 0.060 Oh 179,000.00 10,740.00
sshx Kepala Tukang 0.006 Oh 195,000.00 1,170.00
sshx Tenaga Mandor 0.003 Oh 214,800.00 644.40
sshx Besi Baja Iwf 1.150 Kg 21,190.00 24,368.50
8.1.02.03.03.0001.00349 1 M2 pekerjaan Lantai Floorboard Shera Floor Board 15 X 1200 X 2400 Mm m2 Nilai Hspk 950,000.00
sshx Tenaga Pekerja 1.125 Oh 143,200.00 161,100.00
sshx Tukang 0.375 Oh 179,000.00 67,125.00
sshx Kepala Tukang 0.038 Oh 195,000.00 7,312.50
Kode Barang Uraian Spesifikasi Vol. Sat. Harga Sat. Jumlah
sshx Tenaga Mandor 0.570 Oh 214,800.00 122,436.00
sshx Shera Floorboard 15 X 1200 X 2400 0.360 Lbr 792,350.00 285,115.40
sshx Besi Hollow 50.50.2 Mm 2.910 M1 104,650.00 304,531.50
sshx Drywall Screww 25 Mmx 083 1.000 Bh 260.00 260.00
sshx Screw 10-16x16 0.700 Bh 2,990.00 2,093.00
8.1.02.03.03.0001.00350 1 M2 Pekerjaan Dinding Wallboard Shera Wallboard 8 X 200 X 3000 Mm m2 Nilai Hspk 670,000.00
sshx Tenaga Pekerja 1.167 Oh 143,200.00 167,112.50
sshx Tulang 0.408 Oh 180,000.00 73,512.50
sshx Kepala Tukang 0.068 Oh 195,000.00 13,325.00
sshx Tenaga Mandor 0.598 Oh 214,800.00 128,448.50
sshx Shera Floorboard 8 X 200 X 3000 0.440 Lbr 79,300.00 34,877.70
sshx Besi Hollow 40.60.2 Mm 2.985 M1 79,820.00 238,288.70
sshx Drywall Screww 25 Mmx 083 24.125 Bh 260.00 6,272.50
sshx Screw 10-16x16 2.711 Bh 2,990.00 8,105.50
8.1.02.03.03.0001.00351 1 M2 Shera Wallboard 8 X 200 X 3000 ( Pekerjaan Tempat Duduk) Shera Wallboard 8 X 200 X 3000 Mm m2 Nilai Hspk 665,000.00
sshx Tenaga Pekerja 1.163 Oh 143,200.00 166,487.50
sshx Tulang 0.405 Oh 180,000.00 72,887.50
sshx Kepala Tukang 0.065 Oh 195,000.00 12,700.00
sshx Tenaga Mandor 0.595 Oh 214,800.00 127,823.50
sshx Shera Floorboard 8 X 200 X 3000 0.432 Lbr 79,300.00 34,252.70
sshx Besi Hollow 40.60.2 Mm 2.977 M1 79,820.00 237,663.70
sshx Drywall Screww 25 Mmx 083 21.721 Bh 260.00 5,647.50
sshx Screw 10-16x16 2.502 Bh 2,990.00 7,480.50
8.1.02.03.03.0001.00352 1 M2 Shera Wallboard 8 X 200 X 3000 ( Pekerjaan Atap) Shera Wallboard 8 X 200 X 3000 Mm m2 Nilai Hspk 661,000.00
sshx Tenaga Pekerja 1.135 Oh 143,200.00 162,570.00
sshx Tulang 0.383 Oh 180,000.00 68,970.00
sshx Kepala Tukang 0.045 Oh 195,000.00 8,782.50
sshx Tenaga Mandor 0.577 Oh 214,800.00 123,906.00
sshx Shera Floorboard 8 X 200 X 3000 0.383 Lbr 79,300.00 30,335.20
sshx Besi Hollow 40.60.2 Mm 2.928 M1 79,820.00 233,746.20
sshx Drywall Screww 25 Mmx 083 6.654 Bh 260.00 1,730.00
sshx Screw 10-16x16 1.192 Bh 2,990.00 3,563.00
sshx Cat Penutup 2 X Lapis 0.318 Kg 80,600.00 25,650.00
sshx Thinner Super / Pengencer 0.088 Kg 18,850.00 1,658.50
8.1.02.03.03.0001.00353 1 M2 (pek Tangga Rangka Hollo50.100.2 Mm Plan Teak Floor 12 X 200 X 3000 Mm m2 Nilai Hspk 955,000.00
sshx Tenaga Pekerja 1.125 Oh 143,200.00 161,100.00
sshx Tulang 0.375 Oh 180,000.00 67,500.00
sshx Kepala Tukang 0.038 Oh 195,000.00 7,312.50
sshx Tenaga Mandor 0.570 Oh 214,800.00 122,436.00
sshx Shera Plank Teak Floor 12 X 200 X 3000 1.942 Lbr 104,650.00 203,276.55
sshx Besi Hollow 50.100.2 Mm 3.185 M1 104,650.00 333,356.50
sshx Drywall Screww 25 Mmx 083 111.865 Bh 260.00 29,085.00
sshx Screw 10-16x16 10.340 Bh 2,990.00 30,918.00
8.1.02.03.03.0001 1titik Instalasi Penerangan Dalam Bangunan (pek Me) titik Nilai Hspk 477,000.00
sshx Tenaga Mandor 0.100 Hr 214,800.00 21,480.00
sshx Kepala Tukang Listrik 0.250 Hr 195,000.00 48,750.00
sshx Tukang 0.300 Hr 179,000.00 53,700.00
sshx Kabel Nym 3x2,5 Mm2 8.178 M' 27,950.00 228,566.67
sshx Pipa Conduit 8.849 M' 5,850.00 51,766.67
sshx Pipa Flexible 1.735 M' 6,760.00 11,726.67
sshx Tee Doos 1.588 Bh 8,450.00 13,416.67
sshx Klem Pipa 7.245 Bh 1,170.00 8,476.67
sshx Fisher + Sekrup 18.735 Bh 390.00 7,306.67
sshx Las Doop 41.205 Bh 130.00 5,356.67
sshx Isolasi Listrik 0.353 Bh 32,500.00 11,466.67
sshx Alat Bantu 1.497 Ls 10,000.00 14,966.67
8.1.02.03.03.0001.00355 1 M2 Pekerjaan Selasar (shera Wallboard 8x200x3000)Shera Wallboard 8x200x3000 Mm m2 Nilai Hspk 757,400.00
sshx Tenaga Pekerja 1.125 Oh 143,200.00 161,100.00
sshx Tulang 0.375 Oh 180,000.00 67,500.00
sshx Kepala Tukang 0.038 Oh 195,000.00 7,312.50
sshx Tenaga Mandor 0.570 Oh 214,800.00 122,436.00
sshx Shera Floorboard 8 X 200 X 3000 1.677 Lbr 79,300.00 132,986.10
sshx Besi Hollow 50.50.2,3 Mm 2.910 M1 90,610.00 263,675.10
sshx Drywall Screww 25 Mmx 083 1.000 Bh 260.00 260.00
sshx Screw 10-16x16 0.700 Bh 2,990.00 2,093.00
8.1.02.03.04.0126.00001 1 M1 Pemasangan Kabel Instalansi Nyy 3x2.5 M1 Nilai Hspk 34,000.00
sshx Pekerja 0.002 Oh 143,200.00 286.40
sshx Tukang Listrik 0.020 Oh 179,000.00 3,580.00
sshx Mandor 0.002 Oh 214,800.00 429.60
sshx Kabel Nyy 3x 2.5 1.200 M1 24,700.00 29,640.00
8.1.02.03.04.0126.00002 1 M1 Pemasangan Kabelinstalansi Nyy 3x1.5 M1 Nilai Hspk 23,700.00
sshx Pekerja 0.002 Oh 143,200.00 286.40
sshx Tukang Listrik 0.020 Oh 179,000.00 3,580.00
sshx Mandor 0.002 Oh 214,800.00 429.60
sshx Kabel Nyy 3x 1.5 1.200 M1 16,120.00 19,344.00
Kode Barang Uraian Spesifikasi Vol. Sat. Harga Sat. Jumlah
8.1.02.03.04.0068.00001 1 M1 Pemasangan Tali Sling / Baja M1 Nilai Hspk 23,000.00
sshx Pekerja 0.022 Oh 143,200.00 3,150.40
sshx Tukang Listrik 0.022 Oh 179,000.00 3,938.00
sshx Mandor 0.001 Oh 214,800.00 236.28
sshx Tali Sling 1.000 M1 15,600.00 15,600.00
8.1.02.03.04.0068.00002 1 M1 Pekerjaan Sumur Bor Chasing 8 Inch M1 Nilai Hspk 1,445,700.00
sshx Tenaga Mandor 0.075 Oh 214,800.00 16,110.00
sshx Tenaga Kepala Tukang 0.125 Oh 193,300.00 24,162.50
sshx Tenaga Tukang 0.125 Oh 179,000.00 22,375.00
sshx Tenaga Pekerja 0.250 Oh 143,200.00 35,800.00
sshx Pipa Pvc Aw Uk. 8 Inch X 4 M 0.600 Batang 2,080,300.00 1,248,180.00
sshx Sewa Alat Bantu Strouss Pile 1.000 Jam 12,800.00 12,800.00
sshx Sewa Mud Pumping Machine 1.000 Jam 86,200.00 86,200.00
8.1.02.03.04.0068.00003 1 M1 Pemasangan Pipa Pvc Ø 10 Inch (250 Mm) M1 Nilai Hspk 996,800.00
sshx Pekerja 0.256 Oh 143,200.00 36,659.20
sshx Tukang Pipa 0.128 Oh 179,000.00 22,912.00
sshx Mandor 0.026 Oh 214,800.00 5,584.80
sshx Pipa Pvc Ø 250 Mm 1.000 M 690,040.00 690,040.00
sshx Perlengkapan 0.350 % 690,040.00 241,514.00
8.1.02.03.04.0068.00004 1 M1 Pemasangan Pipa Pvc Ø 6 Inch (150 Mm) M1 Nilai Hspk 328,300.00
sshx Pekerja 0.118 Oh 143,200.00 16,897.60
sshx Tukang Pipa 0.059 Oh 179,000.00 10,561.00
sshx Mandor 0.012 Oh 214,800.00 2,577.60
sshx Pipa Pvc Ø 150 Mm 1.000 M 220,870.00 220,870.00
sshx Perlengkapan 0.350 % 220,870.00 77,304.50
8.1.02.03.04.0068.00005 1 M1 Pemasangan Pipa Pvc Ø 5 Inch (125 Mm) M1 Nilai Hspk 325,100.00
sshx Pekerja 0.105 Oh 143,200.00 15,036.00
sshx Tukang Pipa 0.053 Oh 179,000.00 9,487.00
sshx Mandor 0.011 Oh 214,800.00 2,362.80
sshx Pipa Pvc Ø 125 Mm 1.000 M 220,870.00 220,870.00
sshx Perlengkapan 0.350 % 220,870.00 77,304.50
8.1.02.03.04.0068.00006 1 M1 Pemasangan Pipa Galvanis Diameter 11/2 Inch M1 Nilai Hspk 230,300.00
sshx Pekerja 0.108 Oh 143,200.00 15,465.60
sshx Tukang Batu 0.180 Oh 179,000.00 32,220.00
sshx Kepala Tukang 0.018 Oh 193,300.00 3,479.40
sshx Mandor 0.005 Oh 214,800.00 1,074.00
sshx Pipa Galvanis 11/2 Inch 1.100 M 122,800.00 135,080.00
sshx Perlengkapan 0.350 % 122,800.00 42,980.00
8.1.02.03.04.0068.00007 1 M3 Membuat Gravel Pack M3 Nilai Hspk 1,321,900.00
sshx Pekerja 1.040 Oh 143,200.00 148,928.00
sshx Tukang Bor 0.260 Oh 179,000.00 46,540.00
sshx Kepala Tukang 0.104 Oh 193,300.00 20,103.20
sshx Mandor 0.083 Oh 214,800.00 17,828.40
sshx Semen Portland 325.000 Kg 1,885.00 612,625.00
sshx Split 1-2 Cm 1.200 M3 396,500.00 475,800.00
8.1.02.03.04.0068.00008 1 M1 Pemasangan Pipa Galvanis Diameter 2 Inch M1 Nilai Hspk 292,600.00
sshx Pekerja 0.108 Oh 143,200.00 15,465.60
sshx Tukang Batu 0.180 Oh 179,000.00 32,220.00
sshx Kepala Tukang 0.018 Oh 193,300.00 3,479.40
sshx Mandor 0.005 Oh 214,800.00 1,074.00
sshx Pipa Galvanis 2 Inch 1.100 M 165,700.00 182,270.00
sshx Perlengkapan 0.350 % 165,700.00 57,995.00
8.1.02.03.04.0068.00009 1 Buah Pemasangan Knee G1 Ø 1/2 Inch Buah Nilai Hspk 97,500.00
sshx Pekerja 0.010 Oh 143,200.00 1,432.00
sshx Tukang Pipa 0.400 Oh 179,000.00 71,600.00
sshx Kepala Tukang 0.040 Oh 193,300.00 7,732.00
sshx Mandor 0.005 Oh 214,800.00 1,074.00
sshx Knee G1 Ø 1/2 Inch 1.000 Bh 15,500.00 15,500.00
sshx Seal Tape 0.025 Bh 4,800.00 120.00
8.1.02.03.04.0068.00010 1 Unit Pembuatan Sambungan Rumah Unit Nilai Hspk 1,789,900.00
sshx Female Thread Elbow Hdpe Dia. 3/4" X 1/2" 3.000 Bh 44,029.00 132,087.00
sshx Knee Gi Dia. 1/2" 3.000 Bh 93,878.00 281,634.00
sshx Double Nipple Pvc Dia. 1/2" 2.000 Bh 90,478.00 180,956.00
sshx Stop Kran Kuningan Dia. 1/2" 1.000 Bh 135,778.00 135,778.00
sshx Meteran Air Dia. 1/2" 1.000 Bh 403,228.00 403,228.00
sshx Kran Air Brass Dia. 1/2" 1.000 Bh 127,278.00 127,278.00
sshx Pipa G1 Dia. 1/2" 2.500 M1 82,583.77 206,459.42
sshx Pemasangan Pipa Hdpe Dia. 3/4" 12.000 M1 25,600.00 307,200.00
sshx Landasan Meteran Air Beton K.175 Uk (0,50x0,25x0,05 M) 0.010 M3 1,526,000.00 15,260.00
8.1.02.03.04.0068.00011 1 M1 Pemasangan Pipa Hdpe Ø 3/4 Inch M1 Nilai Hspk 25,600.00
sshx Pekerja 0.035 Oh 143,200.00 5,012.00
sshx Tukang Pipa 0.017 Oh 179,000.00 3,043.00
Kode Barang Uraian Spesifikasi Vol. Sat. Harga Sat. Jumlah
sshx Mandor 0.003 Oh 214,800.00 644.40
sshx Pipa Hdpe Ø 3/4 Inch 1.000 M 16,900.00 16,900.00
8.1.02.03.04.0068.00012 1 Kg Pemasangan Jaring Kawat Baja (wiremash) Kg Nilai Hspk 200,200.00
sshx Pekerja 0.025 Oh 143,200.00 3,580.00
sshx Tukang Besi 0.025 Oh 179,000.00 4,475.00
sshx Kepala Tukang 0.025 Oh 193,300.00 4,832.50
sshx Mandor 0.001 Oh 214,800.00 214.80
sshx Besi Beton (polos/ulir) 10.200 Kg 18,200.00 185,640.00
sshx Kawat Beton 0.050 Kg 28,600.00 1,430.00
8.1.02.03.04.0068.00013 1 M2 Pemasangan Bondek M2 Nilai Hspk 576,900.00
sshx Pekerja 0.660 Oh 143,200.00 94,512.00
sshx Tukang Alumunium 0.330 Oh 179,000.00 59,070.00
sshx Kepala Tukang 0.033 Oh 193,300.00 6,378.90
sshx Mandor 0.033 Oh 214,800.00 7,088.40
sshx Bondek 1.100 M2 128,700.00 141,570.00
sshx Paku 5 - 12 Cm 0.400 Kg 25,000.00 10,000.00
sshx Plywood 9 Mm 0.350 Lbr 147,300.00 51,555.00
sshx Bambu 6.000 Batang 34,450.00 206,700.00
8.1.02.03.04.0068.00014 1 Unit Instalasi Pre-treament Unit Nilai Hspk 190,116,400.00
sshx Tukang Listrik 20.000 Oh 178,030.00 3,560,600.00
sshx Kepala Tukang 20.000 Oh 192,272.40 3,845,448.00
sshx Mandor 10.000 Oh 213,636.00 2,136,360.00
sshx Pre-treatment Pump 1.000 Unit 11,953,500.00 11,953,500.00
sshx Pressure Tank Media Treatment/filter 3.000 Unit 5,525,000.00 16,575,000.00
sshx 1. Sand Filter 4.000 Zak 102,700.00 410,800.00
sshx 2. Carbon Active/calgon Usa (granular F100) 3.000 Zak 2,762,500.00 8,287,500.00
sshx 3. Ion Exchange Resin Cation Softener Dowex Ir-100 5.000 Zak 3,835,000.00 19,175,000.00
sshx 4. Multiramp/gromax (gx2-4, Gx4-8 & Gx8-16 ) 5.000 Zak 292,500.00 1,462,500.00
sshx 5. Gravel Smooth Surface (d.range 5mm-25mm) 3.000 Zak 102,700.00 308,100.00
sshx Housing Filter Guard Media Filtration 1.000 Unit 2,405,000.00 2,405,000.00
sshx Catridge Filter 20.000 Unit 29,250.00 585,000.00
sshx Piping Unit Module Pretreatment 1.000 Lot 15,431,000.00 15,431,000.00
sshx Connector Unit Module 1.000 Lot 14,950,000.00 14,950,000.00
sshx Pressure Switch 2.000 Pcs 390,000.00 780,000.00
sshx Pressure Gauge 3.000 Pcs 390,000.00 1,170,000.00
sshx Solenoid Valve 2.000 Unit 2,600,000.00 5,200,000.00
sshx Rota Meter 2.000 Pcs 1,950,000.00 3,900,000.00
sshx Gate Valve 2.000 Pcs 58,500.00 117,000.00
sshx Ball Valve 13.000 Pcs 149,500.00 1,943,500.00
sshx Level Swtich Control 4.000 Pcs 279,500.00 1,118,000.00
sshx Swing Check Valve/tusen Klep 3.000 Pcs 812,500.00 2,437,500.00
sshx Disk Check Valve 1.000 Pcs 1,254,500.00 1,254,500.00
sshx Pretreatment Module Frame 1.000 Set 15,600,000.00 15,600,000.00
sshx Dosing Pump 1.000 Unit 20,410,000.00 20,410,000.00
sshx Chemical 1.000 Zak 2,600,000.00 2,600,000.00
sshx Cabling & Electrical Unit Module 1.000 Pcg 32,500,000.00 32,500,000.00
8.1.02.03.04.0068.00015 1 Unit Instalasi Modul Reverse Osmosis (ro) Unit Nilai Hspk 198,302,500.00
sshx Tukang Listrik 20.000 Oh 178,030.00 3,560,600.00
sshx Kepala Tukang 20.000 Oh 192,272.40 3,845,448.00
sshx Mandor 10.000 Oh 213,636.00 2,136,360.00
sshx High Pressure Pump 1.000 Unit 21,671,000.00 21,671,000.00
sshx Ro Membrane Housing 2.000 Set 13,390,000.00 26,780,000.00
sshx Ro Membrane Element 2.000 Unit 22,100,000.00 44,200,000.00
sshx Inline Uv Lamp 2.000 Unit 2,275,000.00 4,550,000.00
sshx Cip Pump 1.000 Unit 6,500,000.00 6,500,000.00
sshx Housing Filter Cip 2.000 Unit 45,500.00 91,000.00
sshx Catridge Filter 10.000 Pcs 23,400.00 234,000.00
sshx Cip Tank 1.000 Unit 169,000.00 169,000.00
sshx Pressure Switch 3.000 Unit 390,000.00 1,170,000.00
sshx Pressure Gauge 4.000 Unit 390,000.00 1,560,000.00
sshx Solenoid Valve 2.000 Unit 2,600,000.00 5,200,000.00
sshx Rota Meter 3.000 Unit 1,950,000.00 5,850,000.00
sshx Gate Valve 3.000 Unit 58,500.00 175,500.00
sshx Level Switch Control 2.000 Set 279,500.00 559,000.00
sshx Swing Check Valve 1.000 Unit 812,500.00 812,500.00
sshx Disc Check Valve 4.000 Unit 1,254,500.00 5,018,000.00
sshx Inline Tds Meter 1.000 Unit 1,170,000.00 1,170,000.00
sshx Piping & Connectors Unit Module 1.000 Lot 16,250,000.00 16,250,000.00
sshx Frame Unit Module Ro 1.000 Set 14,300,000.00 14,300,000.00
sshx Cabling & Electrical Unit Module 1.000 Pcg 32,500,000.00 32,500,000.00
8.1.02.03.04.0068.00016 1 M1 Pemasangan Pipa Pvc Dia. 110 Mm M1 Nilai Hspk 423,400.00
sshx Tenaga Mandor 0.011 Oh 214,800.00 2,362.80
sshx Tenaga Tukang 0.053 Oh 179,000.00 9,487.00
sshx Tenaga Pekerja 0.105 Oh 143,200.00 15,036.00
sshx Pipa Pvc Diameter 110 Mm Uk. 4 Inch X 6 M 0.200 Batang 720,807.00 144,161.40
sshx Perlengkapan 0.350 Batang 720,807.00 252,282.45
8.1.02.03.04.0068.00017 1 Buah Pemasangan Bend 90° Dia. 75 Mm Buah Nilai Hspk 102,500.00
Kode Barang Uraian Spesifikasi Vol. Sat. Harga Sat. Jumlah
sshx Tenaga Pekerja 0.036 Oh 143,200.00 5,155.20
sshx Tenaga Tukang 0.060 Oh 179,000.00 10,740.00
sshx Tenaga Mandor 0.002 Oh 214,800.00 429.60
sshx Bend 90° Dia. 75 Mm 1.000 Buah 86,112.00 86,112.00
8.1.02.03.04.0068.00018 1 Buah Pemasangan Bend 45° Dia. 110 Mm Buah Nilai Hspk 105,400.00
sshx Tenaga Pekerja 0.036 Oh 143,200.00 5,155.20
sshx Tenaga Tukang 0.060 Oh 179,000.00 10,740.00
sshx Tenaga Mandor 0.002 Oh 214,800.00 429.60
sshx Bend 45° Dia. 110 Mm 1.000 Buah 89,050.00 89,050.00
8.1.02.03.04.0068.00019 1 Buah Pemasangan Bend 90° Dia. 110 Mm Buah Nilai Hspk 107,600.00
sshx Tenaga Pekerja 0.036 Oh 143,200.00 5,155.20
sshx Tenaga Tukang 0.060 Oh 179,000.00 10,740.00
sshx Tenaga Mandor 0.002 Oh 214,800.00 429.60
sshx Bend 90° Dia. 110 Mm 1.000 Buah 91,260.00 91,260.00
8.1.02.03.04.0068.00020 1 Buah Pemasangan Repair Socket Buah Nilai Hspk 80,000.00
sshx Tenaga Pekerja 0.036 Oh 143,200.00 5,155.20
sshx Tenaga Tukang 0.060 Oh 179,000.00 10,740.00
sshx Tenaga Mandor 0.002 Oh 214,800.00 429.60
sshx Repair Socket Dia. 110 Mm (4'') 1.000 Buah 63,648.00 63,648.00
8.1.02.03.04.0068.00021 1 Buah Pemasangan Tee Y Buah Nilai Hspk 122,000.00
sshx Tenaga Pekerja 0.106 Oh 143,200.00 15,179.20
sshx Tenaga Tukang 0.053 Oh 179,000.00 9,487.00
sshx Tenaga Mandor 0.011 Oh 214,800.00 2,362.80
sshx Tee Y Dia. 110 Mm (4'') 1.000 Buah 94,939.00 94,939.00
8.1.02.03.04.0068.00022 1 Buah Pemasangan Tee Pvc Aw 3 Inch X 3 Inch Buah Nilai Hspk 113,300.00
sshx Tenaga Pekerja 0.106 Oh 143,200.00 15,179.20
sshx Tenaga Tukang 0.053 Oh 179,000.00 9,487.00
sshx Tenaga Mandor 0.011 Oh 214,800.00 2,362.80
sshx Tee Pvc Aw 3 Inch X 3 Inch 1.000 Buah 86,203.00 86,203.00
8.1.02.03.04.0068.00023 1 Unit Pemasangan Bak Resapan Buah Nilai Hspk 760,300.00
sshx Tenaga Pekerja 0.750 Oh 143,200.00 107,400.00
sshx Tenaga Tukang 0.025 Oh 179,000.00 4,475.00
sshx Tenaga Kepala Tukang 0.015 Oh 193,300.00 2,899.50
sshx Tenaga Mandor 0.050 Oh 214,800.00 10,740.00
sshx Buis Beton Dia. 60 Cm 1.000 Unit 325,000.00 325,000.00
sshx Kerikil 0.118 M3 325,000.00 38,285.00
sshx Ijuk 6.000 M2 26,000.00 156,000.00
sshx Pasir 0.029 M3 396,500.00 11,657.10
sshx Penutup Beton 0.029 M3 1,526,000.00 44,864.40
sshx Besi Beton 3.238 Kg 18,200.00 58,933.42
8.1.02.03.04.0068.00024 1 M1 Pengetesan Pipa Diameter 110 Mm M2 Nilai Hspk 2,900.00
sshx Pekerja 0.008 Oh 143,200.00 1,145.60
sshx Mandor 0.001 Oh 214,800.00 171.84
sshx Air Test (air Bersih) 0.008 M3 1,300.00 10.40
sshx Bahan Bakar 0.060 Liter 22,880.00 1,372.80
sshx Oli 0.002 Liter 59,000.00 118.00
8.1.02.03.04.0068.00025 1 M2 Pembongkaran Dan Pemasangan Kembali Paving Blok M2 Nilai Hspk 135,300.00
sshx Pekerja 0.250 Oh 143,200.00 35,800.00
sshx Tukang Batu 0.500 Oh 179,000.00 89,500.00
sshx Kepala Tukang 0.050 Oh 193,300.00 9,665.00
sshx Mandor 0.001 Oh 214,800.00 279.24
1.3.02.18.01.0001.00007 1 Unit Pengadaan Angkur Untuk Dudukan Box Control Unit Nilai Hspk 2,255,400.00
Hspk55.a 1 M3 Pembuatan Beton Mutu K-175 k-175 0.380 M3 1,505,663.25 572,152.04
ssh_13 Angkur Dia. 25 mm 4.000 Buah 420,810.00 1,683,240.00
1.3.02.18.01.0001.00008 1 Unit Ongkos Angkut Ke Lokasi (rambu, Delineator, Rppj) Unit Nilai Hspk 29,000.00
sbu_72 Petugas Sopir 0.010 Hari 193,300.00 1,933.00
sbu_66 Tenaga Pekerja 0.040 Oh 143,200.00 5,728.00
ssh_25 Solar Industri 0.670 Liter 22,880.00 15,329.60
sbu_43 Sewa Kendaraan 0.010 Unit/hari 595,348.00 5,953.48
1.3.02.18.01.0001.00009 1 Buah Ongkos Angkut Ke Lokasi (pagar Pengaman Jalan) Buah Nilai Hspk 95,600.00
sbu_72 Petugas Sopir 0.030 Hari 193,300.00 5,799.00
sbu_66 Tenaga Pekerja 0.130 Oh 143,200.00 18,616.00
ssh_25 Solar Industri 2.330 Liter 22,880.00 53,310.40
sbu_43 Sewa Kendaraan 0.030 Unit/hari 595,348.00 17,860.44
1.3.02.18.01.0001.00010 1 Unit Ongkos Angkut Ke Lokasi (warning Light, Alat Pemberi Isyarat Lalu Lintas, Marka) Unit Nilai Hspk 2,305,900.00
sbu_72 Petugas Sopir 0.780 Hari 193,300.00 150,774.00
sbu_66 Tenaga Pekerja 3.110 Oh 143,200.00 445,352.00
ssh_25 Solar Industri 54.430 Liter 22,880.00 1,245,358.40
sbu_43 Sewa Kendaraan 0.780 Unit/hari 595,348.00 464,371.44
1.3.02.18.01.0001.00011 1 Unit Ongkos Angkut Ke Lokasi (paku Jalan) Unit Nilai Hspk 5,100.00
Kode Barang Uraian Spesifikasi Vol. Sat. Harga Sat. Jumlah
sbu_72 Petugas Sopir 0.002 Hari 193,300.00 328.61
sbu_66 Tenaga Pekerja 0.007 Oh 143,200.00 959.44
ssh_25 Solar Industri 0.120 Liter 22,880.00 2,745.60
sbu_43 Sewa Kendaraan 0.002 Unit/hari 595,348.00 1,012.09
1.3.02.18.01.0001.00039 1 M1 Pengadaan Dan Pemasangan Marka Jalan Ukuran 3 X 120 Mm (thermoplastic) M1 Nilai Hspk 48,300.00
ssh_105 Cat Thermoplastic Marka Jalan 0.900 Kg 33,800.00 30,420.00
ssh_157 Glass Beads (marka) 0.100 Kg 31,200.00 3,120.00
hspk567.a Ongkos Pengecatan 1.000 M1 14,678.00 14,678.00
1.3.02.18.01.0001.00013 1 M1 Pengadaan Dan Pemasangan Marka Jalan Ukuran 3 X 120 Mm (coldplastic) M1 Nilai Hspk 51,100.00
ssh_110 Cold Plastic (marka) 0.900 Kg 36,920.00 33,228.00
ssh_157 Glass Beads (marka) 0.100 Kg 31,200.00 3,120.00
hspk567.a Ongkos Pengecatan 1.000 M1 14,678.00 14,678.00
1.3.02.18.01.0001.00014 1 M1 Pengadaan Dan Pemasangan Marka Jalan Ukuran 2 X 120 Mm (thermoplastic) M1 Nilai Hspk 35,200.00
ssh_105 Cat Thermoplastic Marka Jalan 0.540 Kg 33,800.00 18,252.00
ssh_157 Glass Beads (marka) 0.070 Kg 31,200.00 2,184.00
hspk567.a Ongkos Pengecatan 1.000 M1 14,678.00 14,678.00
1.3.02.18.01.0001.00015 1 M1 Pengadaan Dan Pemasangan Marka Jalan Ukuran 2 X 120 Mm (coldplastic) M1 Nilai Hspk 22,200.00
ssh_110 Cold Plastic (marka) 0.540 Kg 36,920.00 19,936.80
ssh_157 Glass Beads (marka) 0.070 Kg 31,200.00 2,184.00
1.3.02.18.01.0001.00016 1 Unit Pengadaan Dan Pemasangan Warning Light (lampu Peringatan) Unit Nilai Hspk 133,625,200.00
ssh_410 Pipa Pvc C Uk. 5/8 inch x 4 Cm 40.000 Batang 219,700.00 8,788,000.00
ssh_14 Armatur Box Lampu Warning Light 8.000 Buah 287,300.00 2,298,400.00
ssh_258 Kontrol Wl Dengan Konfigurasi (double Flasher) 1.000 Buah 9,750,000.00 9,750,000.00
ssh_184 Kabel Nyy Uk. 4 x 2,5 mm 300.000 M1 46,540.00 13,962,000.00
sbu_9 Set Terminal Kabel 3.000 Buah 78,000.00 234,000.00
ssh_498 Terminal Kabel 4 Jalur 3.000 Buah 109,850.00 329,550.00
ssh_293 Lampu Traffic Light (box Lamp) Uk. 2 Aspek 30 Cm Led (super Bright) 4.000 Buah 10,400,000.00 41,600,000.00
ssh_358 pemasangan Dan Set Box Lampu 22.000 Buah 62,010.00 1,364,220.00
ssh_118 Delineator (patok Pengaman) 3.000 Buah 1,149,200.00 3,447,600.00
ssh_501 Tiang Lampu Overhead/lengkung 2.000 Buah 11,050,000.00 22,100,000.00
hspk564.a Penggelaran Kabel 460.000 M1 6,800.00 3,128,000.00
hspk565.a Penanaman Pipa Pelindung 160.000 M1 5,000.00 800,000.00
hspk566.a Gali Dan Tutup Aspal 2.500 M3 946,915.50 2,367,288.75
Hspk23.a Gali Dan Tutup Tanah Keras 100.000 M3 117,567.20 11,756,720.00
Hspk55.a Pengecoran Tiang Lengkung (4 Buah) k-175 1.870 M3 1,505,663.25 2,815,590.28
Hspk55.a Pengecoran Patok Pengaman (3 Buah) k-175 0.310 M3 1,505,663.25 466,755.61
hspk557.a Pengadaan Angkur Untuk Dudukan Box Control 1.000 Buah 2,427,037.65 2,427,037.65
Hspk55.a Beton Mutu K-175 k-175 0.380 M3 1,505,663.25 572,152.04
hspk568.a Pengecatan Tiang Dan Patok Pengaman 15.000 Buah 34,612.00 519,180.00
sbu_2 Biaya jasa Penyambungan Pln 1.000 Unit 2,700,000.00 2,700,000.00
hspk560.a Ongkos Angkut Lampu Peringatan Ke Lokasi 1.000 Set 2,198,693.20 2,198,693.20
1.3.02.18.01.0001.00017 1 Unit Pengadaan Dan Pemasangan Lampu Peringatan Tenaga Surya (warning Light Solar Cell) Tiang Lengkung Unit Nilai Hspk 59,013,200.00
ssh_43 Battery Jenis Vrla Deep Cycle Pv Kap. 50 Ah 12 V 1.000 Pcs 4,550,000.00 4,550,000.00
ssh_292 Lampu Traffic Light (box Lamp) Uk. 2 Aspek 30 Cm Led (super Bright) 2.000 Unit 10,400,000.00 20,800,000.00
ssh_112 Controller Solar Cell 220VAC, 2 Signal Group 12 VDC, 4 Mode, 2 Speed 1.000 Unit 8,450,000.00 8,450,000.00
ssh_472 Panel Surya Monocrystaline 100 WP 1.000 Unit 2,730,000.00 2,730,000.00
ssh_118 Delineator (patok Pengaman) 3.000 Buah 1,149,200.00 3,447,600.00
ssh_501 Tiang Lampu Overhead/lengkung 1.000 Buah 12,350,000.00 12,350,000.00
Hspk23.a Gali Dan Tutup Tanah Keras 2.400 M3 117,567.20 282,161.28
Hspk55.a Pengecoran k-175 0.600 M3 1,505,663.25 903,397.95
sbu_5 Pemasangan Dan Akomodasi 1.000 Ls 5,500,000.00 5,500,000.00
1.3.02.18.01.0001.00018 1 Unit Pengadaan & Pemasangan Rambu Lalu Lintas Uk. 45 X 45 Cm Unit Nilai Hspk 1,287,200.00
ssh_83 Besi Plat Strip Uk. 4 x 30 mm x 6 meter 0.600 Kg 18,200.00 10,920.00
ssh_70 Besi Angkur Uk. 30 x 30 x 3 mm 0.600 M 22,750.00 13,650.00
ssh_336 Mur Baut Uk. 10 Mm 4.000 Buah 12,740.00 50,960.00
ssh_382 Pipa Galvanis Dia. 2 Inch x 6 Meter Medium A 0.500 Batang 589,200.00 294,600.00
ssh_529 Tutup Pipa Dia. 2 Inch 1.000 Buah 16,250.00 16,250.00
ssh_115 Daun Rambu Reflective Sheeting Tebal 2 Mm 0.200 M2 1,755,000.00 351,000.00
ssh_475 Sticker Perlengkapan Jalan 1.000 Buah 5,000.00 5,000.00
hspk567.a Pengecatan besi Belakang Daun Rambu 0.200 M2 101,800.00 20,360.00
hspk555.a Pemotongan Dan Pengeboran 1.000 Unit 14,471.45 14,471.45
Hspk107.a Pengelasan 14.300 Cm 2,202.66 31,498.02
hspk556.a Perakitan Dan Penyetelan 1.000 Unit 85,268.00 85,268.00
Hspk55.a 1 M3 Pembuatan Beton Mutu K-175 k-175 0.110 M3 1,505,663.25 165,622.96
Hspk23.a Gali Dan Tutup Tanah Keras 0.250 M3 117,567.20 29,391.80
Hspk28.a Urugan Tanah Kembali 0.250 M3 278,301.60 69,575.40
ssh_364 Pasir Urug 0.040 M3 176,428.20 7,057.13
Hspk79.a 1 M2 pemasangan Bekisting Untuk Pondasi 1.120 M3 83,848.69 93,910.53
hspk559.a Ongkos Angkut Ke Lokasi 1.000 Buah 27,570.20 27,570.20
1.3.02.18.01.0001.00019 1 Unit Pengadaan & Pemasangan Rambu Lalu Lintas Uk. 60 X 60 Cm Unit Nilai Hspk 1,584,300.00
ssh_83 Besi Plat Strip Uk. 4 x 30 mm x 6 meter 0.600 Kg 18,200.00 10,920.00
ssh_70 Besi Angkur Uk. 30 x 30 x 3 mm 0.600 M 22,750.00 13,650.00
ssh_336 Mur Baut Uk. 10 Mm 4.000 Buah 12,740.00 50,960.00
ssh_382 Pipa Galvanis Dia. 2 Inch x 6 Meter Medium A 0.500 Batang 589,200.00 294,600.00
ssh_529 Tutup Pipa Dia. 2 Inch 1.000 Buah 16,250.00 16,250.00
Kode Barang Uraian Spesifikasi Vol. Sat. Harga Sat. Jumlah
ssh_115 Daun Rambu Reflective Sheeting Tebal 2 Mm 0.360 M2 1,755,000.00 631,800.00
ssh_475 Sticker Perlengkapan Jalan 1.000 Buah 5,000.00 5,000.00
hspk567.a Pengecatan besi Belakang Daun Rambu 0.360 M2 101,800.00 36,648.00
hspk555.a Pemotongan Dan Pengeboran 1.000 Unit 14,471.45 14,471.45
Hspk107.a Pengelasan 14.310 Cm 2,202.66 31,520.04
hspk556.a Perakitan Dan Penyetelan 1.000 Unit 85,268.00 85,268.00
Hspk55.a 1 M3 Pembuatan Beton Mutu K-175 k-175 0.110 M3 1,505,663.25 165,622.96
Hspk23.a Gali Dan Tutup Tanah Keras 0.250 M3 117,567.20 29,391.80
Hspk28.a Urugan Tanah Kembali 0.250 M3 278,301.60 69,575.40
ssh_364 Pasir Urug 0.040 M3 176,428.20 7,057.13
Hspk79.a 1 M2 pemasangan Bekisting Untuk Pondasi 1.120 M3 83,848.69 93,910.53
hspk559.a Ongkos Angkut Ke Lokasi 1.000 Buah 27,570.20 27,570.20
1.3.02.18.01.0001.00020 1 Unit Pengadaan & Pemasangan Rambu Lalu Lintas Uk. 75 X 75 Cm Unit Nilai Hspk 2,174,500.00
ssh_85 Besi Siku L Uk. 30 x 30 x 3 cm 0.410 Batang 89,700.00 36,777.00
ssh_336 Mur Baut Uk. 10 Mm 4.000 Buah 12,740.00 50,960.00
ssh_383 Pipa Galvanis Dia. 2 Inch x 6 Meter Medium A 0.670 Batang 765,960.00 513,193.20
ssh_529 Tutup Pipa Dia. 2 Inch 1.000 Buah 16,250.00 16,250.00
ssh_115 Daun Rambu Reflective Sheeting Tebal 2 Mm 0.560 M2 1,755,000.00 982,800.00
ssh_475 Sticker Perlengkapan Jalan 1.000 Buah 5,000.00 5,000.00
hspk567.a Pengecatan besi Belakang Daun Rambu 0.560 M2 101,800.00 57,008.00
hspk555.a Pemotongan Dan Pengeboran 1.000 Unit 14,471.45 14,471.45
Hspk107.a Pengelasan 14.310 Cm 2,202.66 31,520.04
hspk556.a Perakitan Dan Penyetelan 1.000 Unit 85,268.00 85,268.00
Hspk55.a 1 M3 Pembuatan Beton Mutu K-175 k-175 0.110 M3 1,505,663.25 165,622.96
Hspk28.a Galian Tanah Dan Urug Kembali 0.250 M3 117,567.20 29,391.80
ssh_364 Pasir Urug 0.040 M3 176,428.20 7,057.13
Hspk79.a 1 M2 pemasangan Bekisting Untuk Pondasi 1.120 M3 83,848.69 93,910.53
hspk559.a Ongkos Angkut Ke Lokasi 1.000 Buah 85,268.00 85,268.00
1.3.02.18.01.0001.00021 1 Unit Pengadaan & Pemasangan Rambu Lalu Lintas Uk. 90 X 90 Cm Unit Nilai Hspk 2,979,500.00
ssh_85 Besi Siku L Uk. 30 x 30 x 3 cm 0.550 Batang 89,700.00 49,335.00
ssh_336 Mur Baut Uk. 10 Mm 8.000 Buah 12,740.00 101,920.00
ssh_383 Pipa Galvanis Dia. 2 Inch x 6 Meter Medium A 0.670 Batang 765,960.00 513,193.20
ssh_531 Tutup Pipa Dia. 2 Inch 1.000 Unit 16,250.00 16,250.00
ssh_115 Daun Rambu Reflective Sheeting Tebal 2 Mm 1.000 M2 1,755,000.00 1,755,000.00
ssh_475 Sticker Perlengkapan Jalan 1.000 Buah 6,500.00 6,500.00
hspk567.a Pengecatan besi Belakang Daun Rambu 0.810 M2 101,800.00 82,458.00
hspk555.a Pemotongan Dan Pengeboran 1.000 Unit 14,471.45 14,471.45
Hspk107.a Pengelasan 14.310 Cm 2,202.66 31,520.04
hspk556.a Perakitan Dan Penyetelan 1.000 Unit 85,268.00 85,268.00
Hspk55.a 1 M3 Pembuatan Beton Mutu K-175 k-175 0.110 M3 1,505,663.25 165,622.96
Hspk28.a Galian Tanah Dan Urug Kembali 0.250 M3 117,567.20 29,391.80
ssh_364 Pasir Urug 0.040 M3 176,428.20 7,057.13
Hspk79.a 1 M2 pemasangan Bekisting Untuk Pondasi 1.120 M3 83,848.69 93,910.53
hspk559.a Ongkos Angkut Ke Lokasi 1.000 Buah 27,570.20 27,570.20
1.3.02.18.01.0001.00022 1 Unit Pengadaan Dan Pemasangan Rppj 120 X 180 (overhead) Unit Nilai Hspk 17,725,100.00
ssh_85 Besi Siku L Uk. 30 x 30 x 3 cm 1.620 Batang 89,700.00 145,314.00
ssh_11 Angkur Dia. 19 mm Panjang 60 cm 4.000 Buah 123,500.00 494,000.00
ssh_338 Mur Baut klem 16.000 Buah 5,000.00 80,000.00
ssh_528 Tutup Baut Angkur 4.000 Buah 25,733.50 102,934.00
ssh_443 Rivet / Panel 22.000 Buah 156,000.00 3,432,000.00
ssh_253 Klem Uk. 3 x 40 x 450 mm 16.000 Buah 780.00 12,480.00
ssh_337 Mur Baut Uk. 3/4 Inch 8.000 Buah 11,823.50 94,588.00
ssh_138 Flange Pipa Dia. 3 Inch Tebal 10 mm 4.000 Buah 104,325.00 417,300.00
ssh_383 Pipa Galvanis Dia. 3 Inch x 6 Meter Medium A 1.000 Batang 1,244,490.00 1,244,490.00
ssh_389 Pipa Galvanis Dia. 6 Inch @6 Meter Medium A 1.000 Batang 3,546,140.00 3,546,140.00
ssh_394 Pipa Hitam Dia. 1,5 Inch x 6 Meter Medium A 0.270 Batang 104,325.00 28,167.75
ssh_439 Rib Base Plate Tebal 10mm 4.000 Buah 136,500.00 546,000.00
ssh_440 Rib Plate Flange Pipa Dia. 3 Inch Tebal 10 mm 24.000 Buah 23,647.00 567,528.00
ssh_532 Tutup Pipa Dia. 3 Inch 4.000 Buah 18,200.00 72,800.00
ssh_533 Tutup Pipa Dia. 6 Inch 1.000 Buah 23,400.00 23,400.00
ssh_39 Base Plate Uk. 400 x 400 x 12 mm 1.000 Buah 535,600.00 535,600.00
ssh_116 Daun Rppj Uk. 120 x 180 M Dengan Reflektif Sheeting Tebal 3 mm 1.000 Lembar 1,950,000.00 1,950,000.00
ssh_304 Logo Kementerian 1.000 Buah 6,500.00 6,500.00
Hspk23.a Gali Dan Tutup Tanah Keras 0.560 M3 117,567.20 65,837.63
Hspk55.a Pekerjaan Pengecoran k-175 0.430 M3 1,505,663.25 647,435.20
Hspk68.a Pekerjaan Pembesian 36.000 Kg 22,069.30 794,494.80
ssh_486 Urugan Pasir Bawah Pondasi 0.050 M3 361,792.08 18,089.60
Hspk107.a Biaya Pembuatan/ Pengelasan 293.400 Kg 2,202.66 646,260.02
Hspk79.a 1 M2 pemasangan Bekisting Untuk Pondasi 0.500 M3 83,848.69 41,924.35
hspk559.a Ongkos Angkut Ke Lokasi 3.600 Buah 27,570.20 99,252.72
sbu_34 Sewa Crane Kap. 25 Ton 0.500 Shift 4,225,000.00 2,112,500.00
1.3.02.18.01.0001.00023 1 M Galian Jalur Kabel Tanah Dan Tutup Kembali M1 Nilai Hspk 408,500.00
sshx Pekerja 1.250 Oh 143,200.00 179,000.00
sshx Mandor 0.125 Oh 214,800.00 26,850.00
sshx Pipa PVC 3" 1.000 Meter 162,800.00 162,800.00
sshx Alat bantu 1.000 Jam 39,812.50 39,812.50
1.3.02.18.01.0001.00024 1 M Pemotongan Jalan Boring Jalur Kabel Tanah M1 Nilai Hspk 503,100.00
sshx Pekerja 0.750 Oh 143,200.00 107,400.00