9.1.2.18.04.04.001 Pekerjaan Pelebaran Perkerasan

8.1.02.03.04.0003.00004 1 M3 Lapis Pondasi Agregat Kelas A M3 Nilai Hspk 1,570,600.00

sbu_66 Tenaga Pekerja 0.009 Oh 143,200.00 1,217.20

sbu_64 Tenaga Mandor 0.001 Oh 214,800.00 279.24

ssh_54 Agregat Kelas A 1.259 M3 325,000.00 409,077.50

sbu_61 Sewa Wheel Loader 0.009 Jam 932,924.20 7,929.86

sbu_36 Sewa Dump Truck Kap. 10 Ton 1.112 Jam 1,016,814.50 1,130,392.68

sbu_47 Sewa Motor Grader 0.009 Jam 1,235,231.40 11,611.18

sbu_58 Sewa Vibro Roller 0.012 Jam 839,736.30 9,992.86

8.1.02.03.04.0003.00005 1 M3 Lapis Pondasi Agregat Kelas B M3 Nilai Hspk 543,500.00

sbu_55 Sewa Tandem Roller 0.009 Jam 868,331.10 7,380.81

sbu_60 Sewa Water Tanker 0.001 Jam 546,000.00 709.80

sbu_66 Tenaga Pekerja 1.259 Oh 143,200.00 180,245.84

sbu_64 Tenaga Mandor 0.009 Oh 214,800.00 1,825.80

ssh_55 Batu Agregat Kelas B 1.112 M3 284,375.00 316,139.69

sbu_61 Sewa Wheel Loader 0.009 Jam 932,924.20 8,769.49

sbu_36 Sewa Dump Truck Kap. 10 Ton 0.011 Jam 1,016,814.50 10,981.60

sbu_47 Sewa Motor Grader 0.014 Jam 1,235,231.40 17,416.76

8.1.02.03.04.0003.00006 1 Ton Semen Untuk Lapis Pondasi Semen Tanah Ton Nilai Hspk 2,892,000.00

sbu_66 Tenaga Pekerja 0.347 Oh 143,200.00 49,733.36

sbu_64 Tenaga Mandor 0.023 Oh 214,800.00 4,983.36

ssh_459 Semen Pc 40 Kg 1,050.000 kg 1,885.00 1,979,250.00

sbu_36 Sewa Dump Truck Kap. 10 Ton 0.844 Jam 1,016,814.50 857,988.08

8.1.02.03.04.0003.00007 1 M3 Pengadaan Agregat Kelas A M3 Nilai Hspk 370,200.00

sbu_66 Tenaga Pekerja 0.009 Oh 143,200.00 1,288.80

sbu_64 Tenaga Mandor 0.005 Oh 214,800.00 966.60

ssh_55 Agregat Pecah Kasar 0.734 M3 284,375.00 208,589.06

ssh_54 Agregat Halus Lapis Pondasi A 0.317 M3 325,000.00 102,895.00

sbu_61 Sewa Wheel Loader 0.032 Jam 932,924.20 29,387.11

sbu_24 Sewa Blending Equipment 0.048 Jam 560,773.20 27,029.27

8.1.02.03.04.0003.00008 1 M3 Pengadaan Agregat Kelas B M3 Nilai Hspk 383,100.00

sbu_66 Tenaga Pekerja 0.009 Oh 143,200.00 1,288.80

sbu_64 Tenaga Mandor 0.005 Oh 214,800.00 966.60

ssh_55 Agregat Pecah Kasar 0.416 M3 284,375.00 118,243.13

ssh_54 Agregat Halus Lapis Pondasi A 0.634 M3 325,000.00 206,115.00

sbu_61 Sewa Wheel Loader 0.032 Jam 932,924.20 29,387.11

sbu_24 Sewa Blending Equipment 0.048 Jam 560,773.20 27,029.27

8.1.02.03.04.0003.00009 1 M3 Pengadaan Agregat Kelas S M3 Nilai Hspk 384,500.00

sbu_66 Tenaga Pekerja 0.009 Oh 143,200.00 1,288.80

sbu_64 Tenaga Mandor 0.005 Oh 214,800.00 966.60

ssh_55 Agregat Pecah Kasar 0.189 M3 284,375.00 53,746.88

ssh_58 Agregat Lolos # 1 Inch 0.192 M3 284,375.00 54,656.88

ssh_54 Agregat Halus Lapis Pondasi A 0.669 M3 325,000.00 217,392.50

sbu_61 Sewa Wheel Loader 0.032 Jam 932,924.20 29,387.11

sbu_24 Sewa Blending Equipment 0.048 Jam 560,773.20 27,029.27

8.1.02.03.04.0003 1 M3 Pengadaan Lapis Pondasi Agregat (cbr 60%) M3 Nilai Hspk 357,300.00

sbu_66 Tenaga Pekerja 0.009 Oh 143,200.00 1,288.80

sbu_64 Tenaga Mandor 0.005 Oh 214,800.00 966.60

ssh_55 Agregat Pecah Kasar 0.252 M3 284,375.00 71,662.50

ssh_58 Agregat Lolos # 1 Inch 0.223 M3 284,375.00 63,444.06

ssh_53 Batu Pecah Mesin (screen 0-37,5 Mm) 0.575 M3 284,375.00 163,515.63

sbu_61 Sewa Wheel Loader 0.032 Jam 932,924.20 29,387.11

sbu_24 Sewa Blending Equipment 0.048 Jam 560,773.20 27,029.27

8.1.02.03.04.0003 1 M3 Pengadaan Lapis Permukaan Agregat (cbr 60%) M3 Nilai Hspk 295,700.00

sbu_66 Tenaga Pekerja 0.009 Oh 143,200.00 1,288.80

sbu_64 Tenaga Mandor 0.005 Oh 214,800.00 966.60

ssh_55 Agregat Pecah Kasar 0.479 M3 284,375.00 136,158.75

ssh_364 Pasir Urug 0.571 M3 176,428.20 100,775.79

sbu_61 Sewa Wheel Loader 0.032 Jam 932,924.20 29,387.11

sbu_24 Sewa Blending Equipment 0.048 Jam 560,773.20 27,029.27

9.1.2.18.04.04.002 Pekerjaan Bahu Jalan

8.1.02.03.04.0003.00012 1 M3 Lapis Pondasi Semen Tanah M3 Nilai Hspk 1,506,600.00

sbu_66 Tenaga Pekerja 0.008 Oh 143,200.00 1,159.92

sbu_64 Tenaga Mandor 0.001 Oh 214,800.00 257.76

Kode Barang Uraian Spesifikasi Vol. Sat. Harga Sat. Jumlah

ssh_488 Tanah Urug 1.200 M3 177,125.00 212,550.00

sbu_61 Sewa Wheel Loader 0.008 Jam 932,924.20 7,556.69

sbu_36 Sewa Dump Truck Kap. 10 Ton 1.176 Jam 1,016,814.50 1,195,570.49

sbu_47 Sewa Motor Grader 0.009 Jam 1,235,231.40 11,611.18

sbu_58 Sewa Vibro Roller 0.027 Jam 839,736.30 22,504.93

sbu_50 Sewa Pneumatic Tyre Roller 0.007 Jam 843,611.60 5,483.48

sbu_60 Sewa Water Tanker 0.014 Jam 546,000.00 7,698.60

sbu_27 Sewa Cold Milling 0.017 Jam 2,507,547.90 42,126.80

8.1.02.03.04.0003.00013 1 M2 Bahan Agregat Penutup Burtu M2 Nilai Hspk 26,300.00

sbu_66 Tenaga Pekerja 0.000 Oh 143,200.00 57.28

sbu_64 Tenaga Mandor 0.000 Oh 214,800.00 21.48

ssh_55 Batu Pecah Mesin Agregat Pecah Kasar 0.018 M3 284,375.00 5,005.00

sbu_61 Sewa Wheel Loader 0.000 Jam 932,924.20 186.58

sbu_36 Sewa Dump Truck Kap. 10 Ton 0.020 Jam 1,016,814.50 20,437.97

sbu_50 Sewa Pneumatic Tyre Roller 0.001 Jam 843,611.60 590.53

8.1.02.03.04.0003.00014 1 M3 Lapis Pondasi Agregat Kelas S M3 Nilai Hspk 1,525,800.00

sbu_66 Tenaga Pekerja 0.009 Oh 143,200.00 1,217.20

sbu_64 Tenaga Mandor 0.001 Oh 214,800.00 279.24

ssh_54 Batu Pecah Mesin Agregat Pecah Halus 1.259 M3 325,000.00 409,077.50

sbu_61 Sewa Wheel Loader 0.009 Jam 932,924.20 7,929.86

sbu_36 Sewa Dump Truck Kap. 10 Ton 1.072 Jam 1,016,814.50 1,089,516.74

sbu_47 Sewa Motor Grader 0.004 Jam 1,235,231.40 5,311.50

sbu_55 Sewa Tandem Roller 0.005 Jam 868,331.10 4,688.99

sbu_60 Sewa Water Tanker 0.014 Jam 546,000.00 7,698.60

8.1.02.03.04.0003.00015 1 M2 Lapisan Perkerasan 5-10 Cm (padat Digilas) M2 Nilai Hspk 116,200.00

sbu_64 Tenaga Mandor 0.038 Oh 214,800.00 8,162.40

sbu_66 Tenaga Pekerja 0.095 Oh 143,200.00 13,604.00

ssh_59 Batu Pecah Mesin Uk. 3 - 5 cm 0.040 M3 403,000.00 16,120.00

ssh_50 Batu Kali Uk. 15 - 20 cm 0.100 M3 364,000.00 36,400.00

ssh_22 Aspal Panas Ac 60/70 1.500 Kg 19,500.00 29,250.00

sbu_58 Sewa Vibro Roller 0.015 Jam 839,736.30 12,596.04

9.1.2.18.04.05.002 Pekerjaan Perkerasan Berbutir Tanpa Penutup Aspal

8.1.02.03.04.0003.00016 1 M3 Lapis Permukaan Agregat Tanpa Penutup Aspal M3 Nilai Hspk 1,052,500.00

sbu_66 Tenaga Pekerja 0.009 Oh 143,200.00 1,217.20

sbu_64 Tenaga Mandor 0.001 Oh 214,800.00 279.24

ssh_55 Agregat Pecah Kasar 1.259 M3 284,375.00 357,942.81

sbu_61 Sewa Wheel Loader 0.009 Jam 932,924.20 7,929.86

sbu_36 Sewa Dump Truck Kap. 10 Ton 0.652 Jam 1,016,814.50 662,658.01

sbu_47 Sewa Motor Grader 0.004 Jam 1,235,231.40 5,311.50

sbu_55 Sewa Tandem Roller 0.011 Jam 868,331.10 9,377.98

sbu_60 Sewa Water Tanker 0.014 Jam 546,000.00 7,698.60

9.1.2.18.04.05.003 Pekerjaan Perkerasan Beton Semen

8.1.02.03.04.0003.00017 1 Ton Semen Untuk Lapis Pondasi Semen Tanah. Ton Nilai Hspk 3,082,700.00

sbu_66 Tenaga Pekerja 0.347 Oh 143,200.00 49,733.36

sbu_64 Tenaga Mandor 0.023 Oh 214,800.00 4,983.36

ssh_459 Semen Pc 40 Kg 1,050.000 kg 1,885.00 1,979,250.00

sbu_36 Sewa Dump Truck Kap. 10 Ton 1.031 Jam 1,016,814.50 1,048,640.79

9.1.2.18.04.05.005 Pekerjaan Lapis Beton Semen Pondasi & Pondasi Bawah (ctb & Ctsb)

8.1.02.03.04.0003.00018 1 M3 Lapis Pondasi Atas Bersemen (cement Treated Base) (ctb) M3 Nilai Hspk 1,180,600.00

sbu_66 Tenaga Pekerja 0.151 Oh 143,200.00 21,580.24

sbu_69 Tenaga Tukang 0.043 Oh 179,000.00 7,714.90

sbu_64 Tenaga Mandor 0.022 Oh 214,800.00 4,639.68

ssh_459 Semen Pc 40 Kg 87.128 kg 1,885.00 164,236.28

ssh_55 Agregat Pecah Kasar 1.259 M3 284,375.00 357,942.81

sbu_61 Sewa Wheel Loader 0.025 Jam 932,924.20 22,856.64

sbu_23 Sewa Batching Plant 0.075 Jam 739,566.10 55,763.28

sbu_36 Sewa Dump Truck Kap. 10 Ton 0.510 Jam 1,016,814.50 518,168.67

sbu_58 Sewa Vibro Roller 0.006 Jam 839,736.30 4,618.55

sbu_60 Sewa Water Tanker 0.042 Jam 546,000.00 23,041.20

8.1.02.03.04.0003.00019 1 M3 Lapis Pondasi Bawah (cement Treated Sub Base) (ctsb) M3 Nilai Hspk 1,228,900.00

sbu_66 Tenaga Pekerja 0.151 Oh 143,200.00 21,580.24

sbu_69 Tenaga Tukang 0.043 Oh 179,000.00 7,714.90

sbu_64 Tenaga Mandor 0.022 Oh 214,800.00 4,639.68

ssh_459 Semen Pc 40 Kg 112.752 kg 1,885.00 212,537.52

ssh_55 Agregat Pecah Kasar 1.259 M3 284,375.00 357,942.81

sbu_61 Sewa Wheel Loader 0.025 Jam 932,924.20 22,856.64

sbu_23 Sewa Batching Plant 0.075 Jam 739,566.10 55,763.28

sbu_36 Sewa Dump Truck Kap. 10 Ton 0.510 Jam 1,016,814.50 518,168.67

sbu_58 Sewa Vibro Roller 0.006 Jam 839,736.30 4,618.55

sbu_60 Sewa Water Tanker 0.042 Jam 546,000.00 23,041.20

8.1.02.03.04.0003.00020 1 M3 Lapis Pondasi Agregat Tanpa Penutup Aspal M3 Nilai Hspk 927,500.00

sbu_66 Tenaga Pekerja 0.009 Oh 143,200.00 1,217.20

sbu_64 Tenaga Mandor 0.001 Oh 214,800.00 279.24

ssh_54 Batu Agregat Kelas A 1.259 M3 325,000.00 409,077.50

sbu_61 Sewa Wheel Loader 0.009 Jam 932,924.20 7,929.86

Kode Barang Uraian Spesifikasi Vol. Sat. Harga Sat. Jumlah

sbu_36 Sewa Dump Truck Kap. 10 Ton 0.486 Jam 1,016,814.50 494,578.57

sbu_47 Sewa Motor Grader 0.003 Jam 1,235,231.40 3,952.74

sbu_55 Sewa Tandem Roller 0.003 Jam 868,331.10 2,691.83

sbu_60 Sewa Water Tanker 0.014 Jam 546,000.00 7,698.60

9.1.2.18.04.06.001 Pekerjaan Lapis Resap Pengikat & Lapis Perekat

9.1.2.18.04.06.002 Pekerjaan Laburan Aspal Satu Lapis (burtu) & Laburan Aspal Dua Lapis (burda)

8.1.02.03.04.0003.00021 1 M2 Agregat Penutup Burtu M2 Nilai Hspk 48,000.00

sbu_66 Tenaga Pekerja 0.030 Oh 143,200.00 4,353.28

sbu_64 Tenaga Mandor 0.002 Oh 214,800.00 343.68

ssh_55 Batu Pecah Mesin Agregat Pecah Kasar 0.012 M3 284,375.00 3,497.81

sbu_61 Sewa Wheel Loader 0.011 Jam 932,924.20 9,982.29

sbu_36 Sewa Dump Truck Kap. 10 Ton 0.029 Jam 1,016,814.50 29,284.26

sbu_50 Sewa Pneumatic Tyre Roller 0.001 Jam 843,611.60 506.17

8.1.02.03.04.0003.00022 1 M2 Agregat Penutup Burda M2 Nilai Hspk 75,900.00

sbu_66 Tenaga Pekerja 0.051 Oh 143,200.00 7,260.24

sbu_64 Tenaga Mandor 0.003 Oh 214,800.00 558.48

ssh_55 Batu Pecah Mesin Agregat Pecah Kasar 0.019 M3 284,375.00 5,289.38

sbu_61 Sewa Wheel Loader 0.018 Jam 932,924.20 16,606.05

sbu_36 Sewa Dump Truck Kap. 10 Ton 0.045 Jam 1,016,814.50 45,248.25

sbu_50 Sewa Pneumatic Tyre Roller 0.001 Jam 843,611.60 927.97

9.1.2.18.04.06.004 Pekerjaan Lasbutag & Latasbusir

8.1.02.03.04.0003.00023 1 Ton Latasir Kelas A (ss-a) Ton Nilai Hspk 2,719,300.00

sbu_66 Tenaga Pekerja 0.020 Oh 143,200.00 2,878.32

sbu_64 Tenaga Mandor 0.003 Oh 214,800.00 622.92

ssh_55 Batu Pecah Mesin Agregat Pecah Kasar 0.209 M3 284,375.00 59,320.63

ssh_54 Batu Pecah Mesin Agregat Pecah Halus 0.417 M3 325,000.00 135,590.00

ssh_459 Semen Pc 40 Kg 31.500 kg 1,885.00 59,377.50

ssh_22 Aspal Panas Ac 60/70 103.000 Kg 19,500.00 2,008,500.00

sbu_61 Sewa Wheel Loader 0.010 Jam 932,924.20 8,956.07

sbu_21 Sewa Asphalt Mixing Plant 0.020 Jam 15,249,013.00 306,505.16

sbu_40 Sewa Genset 0.020 Jam 878,099.30 17,649.80

sbu_36 Sewa Dump Truck Kap. 10 Ton 0.023 Jam 1,016,814.50 23,691.78

sbu_19 Sewa Asphalt Finisher 0.039 Jam 1,533,264.20 59,337.32

sbu_55 Sewa Tandem Roller 0.032 Jam 868,331.10 27,612.93

sbu_50 Sewa Pneumatic Tyre Roller 0.011 Jam 843,611.60 9,195.37

8.1.02.03.04.0003.00024 1 Ton Latasir Kelas B (ss-b) Ton Nilai Hspk 2,315,900.00

sbu_66 Tenaga Pekerja 0.020 Oh 143,200.00 2,878.32

sbu_64 Tenaga Mandor 0.003 Oh 214,800.00 622.92

ssh_55 Batu Pecah Mesin Agregat Pecah Kasar 0.014 M3 284,375.00 3,981.25

ssh_54 Batu Pecah Mesin Agregat Pecah Halus 0.014 M3 325,000.00 4,550.00

ssh_459 Semen Pc 40 Kg 31.500 kg 1,885.00 59,377.50

ssh_22 Aspal Panas Ac 60/70 92.700 Kg 19,500.00 1,807,650.00

sbu_61 Sewa Wheel Loader 0.010 Jam 932,924.20 8,956.07

sbu_21 Sewa Asphalt Mixing Plant 0.020 Jam 15,249,013.00 306,505.16

sbu_40 Sewa Genset 0.020 Jam 878,099.30 17,649.80

sbu_36 Sewa Dump Truck Kap. 10 Ton 0.031 Jam 1,016,814.50 31,622.93

sbu_19 Sewa Asphalt Finisher 0.029 Jam 1,533,264.20 44,464.66

sbu_55 Sewa Tandem Roller 0.024 Jam 868,331.10 20,666.28

sbu_50 Sewa Pneumatic Tyre Roller 0.008 Jam 843,611.60 6,917.62

8.1.02.03.04.0003.00025 1 Ton Lataston Lapis Aus (hrs-wc) (gradasi Senjang/semi Senjang) Ton Nilai Hspk 2,822,200.00

sbu_66 Tenaga Pekerja 0.019 Oh 143,200.00 2,735.12

sbu_64 Tenaga Mandor 0.003 Oh 214,800.00 601.44

ssh_58 Agregat Lolos # 1 Inch 0.244 M3 284,375.00 69,415.94

ssh_59 Agregat Pecah Mesin (0-5) 0.154 M3 403,000.00 62,021.70

ssh_54 Batu Pecah Mesin Agregat Pecah Halus 0.248 M3 325,000.00 80,665.00

ssh_459 Semen Pc 40 Kg 23.100 kg 1,885.00 43,543.50

ssh_22 Aspal Panas Ac 60/70 75.190 Kg 19,500.00 1,466,205.00

sbu_61 Sewa Wheel Loader 0.010 Jam 932,924.20 8,956.07

sbu_21 Sewa Asphalt Mixing Plant 0.020 Jam 15,249,013.00 306,505.16

sbu_40 Sewa Genset 0.020 Jam 878,099.30 17,649.80

sbu_36 Sewa Dump Truck Kap. 10 Ton 0.705 Jam 1,016,814.50 717,260.95

sbu_19 Sewa Asphalt Finisher 0.019 Jam 1,533,264.20 29,285.35

sbu_55 Sewa Tandem Roller 0.016 Jam 868,331.10 13,632.80

sbu_50 Sewa Pneumatic Tyre Roller 0.004 Jam 843,611.60 3,711.89

8.1.02.03.04.0003.00026 1 Ton Lataston Lapis Aus Perata (hrs-wc(l)) (gradasi Senjang/semi Senjang) Ton Nilai Hspk 2,822,200.00

sbu_66 Tenaga Pekerja 0.019 Oh 143,200.00 2,735.12

sbu_64 Tenaga Mandor 0.003 Oh 214,800.00 601.44

ssh_58 Agregat Lolos # 1 Inch 0.244 M3 284,375.00 69,415.94

ssh_59 Agregat Pecah Mesin (0-5) 0.154 M3 403,000.00 62,021.70

ssh_54 Batu Pecah Mesin Agregat Pecah Halus 0.248 M3 325,000.00 80,665.00

ssh_459 Semen Pc 40 Kg 23.100 kg 1,885.00 43,543.50

ssh_22 Aspal Panas Ac 60/70 75.190 Kg 19,500.00 1,466,205.00

sbu_61 Sewa Wheel Loader 0.010 Jam 932,924.20 8,956.07

sbu_21 Sewa Asphalt Mixing Plant 0.020 Jam 15,249,013.00 306,505.16

sbu_40 Sewa Genset 0.020 Jam 878,099.30 17,649.80

sbu_36 Sewa Dump Truck Kap. 10 Ton 0.705 Jam 1,016,814.50 717,260.95

sbu_19 Sewa Asphalt Finisher 0.019 Jam 1,533,264.20 29,285.35

Kode Barang Uraian Spesifikasi Vol. Sat. Harga Sat. Jumlah

sbu_55 Sewa Tandem Roller 0.016 Jam 868,331.10 13,632.80

sbu_50 Sewa Pneumatic Tyre Roller 0.004 Jam 843,611.60 3,711.89

8.1.02.03.04.0003.00027 1 Ton Lataston Lapis Pondasi (hrs-base) (gradasi Senjang/semi Senjang) Ton Nilai Hspk 2,524,500.00

sbu_66 Tenaga Pekerja 0.004 Oh 143,200.00 587.12

sbu_64 Tenaga Mandor 0.001 Oh 214,800.00 128.88

ssh_58 Agregat Lolos # 1 Inch 0.296 M3 284,375.00 84,118.13

ssh_59 Agregat Pecah Mesin (0-5) 0.141 M3 403,000.00 56,621.50

ssh_54 Batu Pecah Mesin Agregat Pecah Halus 0.227 M3 325,000.00 73,645.00

ssh_459 Semen Pc 40 Kg 15.752 kg 1,885.00 29,692.52

ssh_22 Aspal Panas Ac 60/70 61.800 Kg 19,500.00 1,205,100.00

sbu_61 Sewa Wheel Loader 0.010 Jam 932,924.20 8,956.07

sbu_21 Sewa Asphalt Mixing Plant 0.020 Jam 15,249,013.00 306,505.16

sbu_40 Sewa Genset 0.020 Jam 878,099.30 17,649.80

sbu_36 Sewa Dump Truck Kap. 10 Ton 0.705 Jam 1,016,814.50 717,260.95

sbu_19 Sewa Asphalt Finisher 0.004 Jam 1,533,264.20 6,286.38

sbu_55 Sewa Tandem Roller 0.016 Jam 868,331.10 13,719.63

sbu_50 Sewa Pneumatic Tyre Roller 0.005 Jam 843,611.60 4,218.06

8.1.02.03.04.0003.00028 1 Ton Lataston Lapis Pondasi Perata (hrs-base(l)) (gradasi Senjang/semi Senjang) Ton Nilai Hspk 2,524,500.00

sbu_66 Tenaga Pekerja 0.004 Oh 143,200.00 587.12

sbu_64 Tenaga Mandor 0.001 Oh 214,800.00 128.88

ssh_58 Agregat Lolos # 1 Inch 0.296 M3 284,375.00 84,118.13

ssh_59 Agregat Pecah Mesin (0-5) 0.141 M3 403,000.00 56,621.50

ssh_54 Batu Pecah Mesin Agregat Pecah Halus 0.227 M3 325,000.00 73,645.00

ssh_459 Semen Pc 40 Kg 15.752 kg 1,885.00 29,692.52

ssh_22 Aspal Panas Ac 60/70 61.800 Kg 19,500.00 1,205,100.00

sbu_61 Sewa Wheel Loader 0.010 Jam 932,924.20 8,956.07

sbu_21 Sewa Asphalt Mixing Plant 0.020 Jam 15,249,013.00 306,505.16

sbu_40 Sewa Genset 0.020 Jam 878,099.30 17,649.80

sbu_36 Sewa Dump Truck Kap. 10 Ton 0.705 Jam 1,016,814.50 717,260.95

sbu_19 Sewa Asphalt Finisher 0.004 Jam 1,533,264.20 6,286.38

sbu_55 Sewa Tandem Roller 0.016 Jam 868,331.10 13,719.63

sbu_50 Sewa Pneumatic Tyre Roller 0.005 Jam 843,611.60 4,218.06

1.3.04.01.02.0004.00029 1 Ton Laston Lapis Aus (ac-wc) Ton Nilai Hspk 2,503,400.00

sbu_66 Tenaga Pekerja 0.029 Oh 143,200.00 4,109.84

sbu_64 Tenaga Mandor 0.003 Oh 214,800.00 622.92

ssh_53 Batu Pecah Mesin (screen 0-37,5 Mm) 0.298 M3 284,375.00 84,715.31

ssh_59 Agregat Pecah Mesin (0-5) 0.352 M3 403,000.00 142,017.20

ssh_459 Semen Pc 40 Kg 9.872 kg 1,885.00 18,608.72

ssh_22 Aspal Panas Ac 60/70 59.740 Kg 19,500.00 1,164,930.00

sbu_61 Sewa Wheel Loader 0.010 Jam 932,924.20 8,956.07

sbu_21 Sewa Asphalt Mixing Plant 0.020 Jam 15,249,013.00 306,505.16

sbu_40 Sewa Genset 0.020 Jam 878,099.30 17,649.80

sbu_36 Sewa Dump Truck Kap. 10 Ton 0.705 Jam 1,016,814.50 717,260.95

sbu_19 Sewa Asphalt Finisher 0.014 Jam 1,533,264.20 21,159.05

sbu_55 Sewa Tandem Roller 0.014 Jam 868,331.10 11,809.30

sbu_50 Sewa Pneumatic Tyre Roller 0.006 Jam 843,611.60 4,977.31

8.1.02.03.04.0003.00030 1 Ton Laston Lapis Aus Perata (ac-wc(l)) Ton Nilai Hspk 2,563,600.00

sbu_66 Tenaga Pekerja 0.029 Oh 143,200.00 4,109.84

sbu_64 Tenaga Mandor 0.003 Oh 214,800.00 622.92

ssh_53 Batu Pecah Mesin (screen 0-37,5 Mm) 0.298 M3 284,375.00 84,715.31

ssh_59 Agregat Pecah Mesin (0-5) 0.352 M3 403,000.00 142,017.20

ssh_459 Semen Pc 40 Kg 9.872 kg 1,885.00 18,608.72

ssh_22 Aspal Panas Ac 60/70 62.830 Kg 19,500.00 1,225,185.00

sbu_61 Sewa Wheel Loader 0.010 Jam 932,924.20 8,956.07

sbu_21 Sewa Asphalt Mixing Plant 0.020 Jam 15,249,013.00 306,505.16

sbu_40 Sewa Genset 0.020 Jam 878,099.30 17,649.80

sbu_36 Sewa Dump Truck Kap. 10 Ton 0.705 Jam 1,016,814.50 717,260.95

sbu_19 Sewa Asphalt Finisher 0.014 Jam 1,533,264.20 21,159.05

sbu_55 Sewa Tandem Roller 0.014 Jam 868,331.10 11,809.30

sbu_50 Sewa Pneumatic Tyre Roller 0.006 Jam 843,611.60 4,977.31

1.3.04.01.02.0004.00030 1 Ton Laston Lapis Antara (ac-bc) Ton Nilai Hspk 2,453,100.00

sbu_66 Tenaga Pekerja 0.029 Oh 143,200.00 4,109.84

sbu_64 Tenaga Mandor 0.003 Oh 214,800.00 622.92

ssh_53 Batu Pecah Mesin (screen 0-37,5 Mm) 0.348 M3 284,375.00 99,019.38

ssh_59 Agregat Pecah Mesin (0-5) 0.313 M3 403,000.00 126,018.10

ssh_459 Semen Pc 40 Kg 9.452 kg 1,885.00 17,817.02

ssh_22 Aspal Panas Ac 60/70 57.680 Kg 19,500.00 1,124,760.00

sbu_61 Sewa Wheel Loader 0.010 Jam 932,924.20 8,956.07

sbu_21 Sewa Asphalt Mixing Plant 0.020 Jam 15,249,013.00 306,505.16

sbu_40 Sewa Genset 0.020 Jam 878,099.30 17,649.80

sbu_36 Sewa Dump Truck Kap. 10 Ton 0.705 Jam 1,016,814.50 717,260.95

sbu_19 Sewa Asphalt Finisher 0.011 Jam 1,533,264.20 16,865.91

sbu_55 Sewa Tandem Roller 0.011 Jam 868,331.10 9,464.81

sbu_50 Sewa Pneumatic Tyre Roller 0.005 Jam 843,611.60 3,964.97

8.1.02.03.04.0003.00032 1 Ton Laston Lapis Antara Perata (ac-bc(l)) Ton Nilai Hspk 2,453,100.00

sbu_66 Tenaga Pekerja 0.029 Oh 143,200.00 4,109.84

sbu_64 Tenaga Mandor 0.003 Oh 214,800.00 622.92

Kode Barang Uraian Spesifikasi Vol. Sat. Harga Sat. Jumlah

ssh_53 Batu Pecah Mesin (screen 0-37,5 Mm) 0.348 M3 284,375.00 99,019.38

ssh_59 Agregat Pecah Mesin (0-5) 0.313 M3 403,000.00 126,018.10

ssh_459 Semen Pc 40 Kg 9.452 kg 1,885.00 17,817.02

ssh_22 Aspal Panas Ac 60/70 57.680 Kg 19,500.00 1,124,760.00

sbu_61 Sewa Wheel Loader 0.010 Jam 932,924.20 8,956.07

sbu_21 Sewa Asphalt Mixing Plant 0.020 Jam 15,249,013.00 306,505.16

sbu_40 Sewa Genset 0.020 Jam 878,099.30 17,649.80

sbu_36 Sewa Dump Truck Kap. 10 Ton 0.705 Jam 1,016,814.50 717,260.95

sbu_19 Sewa Asphalt Finisher 0.011 Jam 1,533,264.20 16,865.91

sbu_55 Sewa Tandem Roller 0.011 Jam 868,331.10 9,464.81

sbu_50 Sewa Pneumatic Tyre Roller 0.005 Jam 843,611.60 3,964.97

8.1.02.03.04.0003.00033 1 Ton Laston Lapis Pondasi (ac-base) Ton Nilai Hspk 2,284,100.00

sbu_66 Tenaga Pekerja 0.029 Oh 143,200.00 4,109.84

sbu_64 Tenaga Mandor 0.003 Oh 214,800.00 622.92

ssh_53 Batu Pecah Mesin (screen 0-37,5 Mm) 0.132 M3 284,375.00 37,452.19

ssh_58 Agregat Lolos # 1 Inch 0.298 M3 284,375.00 84,800.63

ssh_59 Agregat Pecah Mesin (0-5) 0.242 M3 403,000.00 97,405.10

ssh_459 Semen Pc 40 Kg 9.976 kg 1,885.00 18,804.76

ssh_22 Aspal Panas Ac 60/70 49.440 Kg 19,500.00 964,080.00

sbu_61 Sewa Wheel Loader 0.010 Jam 932,924.20 8,956.07

sbu_21 Sewa Asphalt Mixing Plant 0.020 Jam 15,249,013.00 306,505.16

sbu_40 Sewa Genset 0.020 Jam 878,099.30 17,649.80

sbu_36 Sewa Dump Truck Kap. 10 Ton 0.705 Jam 1,016,814.50 717,260.95

sbu_19 Sewa Asphalt Finisher 0.009 Jam 1,533,264.20 14,106.03

sbu_55 Sewa Tandem Roller 0.009 Jam 868,331.10 7,901.81

sbu_50 Sewa Pneumatic Tyre Roller 0.005 Jam 843,611.60 4,386.78

8.1.02.03.04.0003.00034 1 Ton Laston Lapis Pondasi Perata (ac-base(l)) Ton Nilai Hspk 2,284,100.00

sbu_66 Tenaga Pekerja 0.029 Oh 143,200.00 4,109.84

sbu_64 Tenaga Mandor 0.003 Oh 214,800.00 622.92

ssh_53 Batu Pecah Mesin (screen 0-37,5 Mm) 0.132 M3 284,375.00 37,452.19

ssh_58 Agregat Lolos # 1 Inch 0.298 M3 284,375.00 84,800.63

ssh_59 Agregat Pecah Mesin (0-5) 0.242 M3 403,000.00 97,405.10

ssh_459 Semen Pc 40 Kg 9.976 kg 1,885.00 18,804.76

ssh_22 Aspal Panas Ac 60/70 49.440 Kg 19,500.00 964,080.00

sbu_61 Sewa Wheel Loader 0.010 Jam 932,924.20 8,956.07

sbu_21 Sewa Asphalt Mixing Plant 0.020 Jam 15,249,013.00 306,505.16

sbu_40 Sewa Genset 0.020 Jam 878,099.30 17,649.80

sbu_36 Sewa Dump Truck Kap. 10 Ton 0.705 Jam 1,016,814.50 717,260.95

sbu_19 Sewa Asphalt Finisher 0.009 Jam 1,533,264.20 14,106.03

sbu_55 Sewa Tandem Roller 0.009 Jam 868,331.10 7,901.81

sbu_50 Sewa Pneumatic Tyre Roller 0.005 Jam 843,611.60 4,386.78

9.1.2.18.04.07.001 Pekerjaan Beton

8.1.02.03.04.0003.00035 1 M3 Beton Mutu Sedang Fc’=30 Mpa M3 Nilai Hspk 3,235,500.00

sbu_66 Tenaga Pekerja 0.115 Oh 143,200.00 16,439.36

sbu_69 Tenaga Tukang 0.258 Oh 179,000.00 46,217.80

sbu_64 Tenaga Mandor 0.014 Oh 214,800.00 3,093.12

ssh_459 Semen Pc 40 Kg 469.680 kg 1,885.00 885,346.80

ssh_361 Pasir Beton 0.515 M3 396,500.00 203,999.25

ssh_55 Agregat Pecah Kasar 0.744 M3 284,375.00 211,575.00

ssh_225 Kayu Perancah 0.400 M3 3,250,000.00 1,300,000.00

ssh_352 Paku Biasa Uk. 2 inch - 5 inch 3.200 Kg 26,000.00 83,200.00

sbu_23 Sewa Batching Plant 0.101 Jam 739,566.10 74,326.39

sbu_57 Sewa Truck Mixer 0.316 Jam 1,234,231.70 390,387.49

sbu_60 Sewa Water Tanker 0.038 Jam 546,000.00 20,857.20

8.1.02.03.04.0003.00036 1 Kg Anyaman Kawat Yang Dilas (welded Wire Mesh) Kg Nilai Hspk 9,100.00

sbu_66 Tenaga Pekerja 0.030 Oh 143,200.00 4,296.00

sbu_69 Tenaga Tukang 0.010 Oh 179,000.00 1,790.00

sbu_64 Tenaga Mandor 0.005 Oh 214,800.00 1,074.00

ssh_73 Besi Beton Polos Dia. 10 mm, 12 meter 0.103 Batang 18,253.30 1,876.51

ssh_218 Kawat Ikat (bendrat) Besi Uk. 0,1 cm x 25 Kg 0.001 Kg 28,600.00 22.88

9.1.2.18.04.08.001 Pekerjaan Pengembalian Kondisi Perkerasan Lama

8.1.02.03.04.0003.00037 1 M3 Lapis Pondasi Agregat Kelas S Untuk Minor M3 Nilai Hspk 1,525,800.00

sbu_66 Tenaga Pekerja 0.009 Oh 143,200.00 1,217.20

sbu_64 Tenaga Mandor 0.001 Oh 214,800.00 279.24

ssh_54 Batu Pecah Mesin Agregat Pecah Halus 1.259 M3 325,000.00 409,077.50

sbu_61 Sewa Wheel Loader 0.009 Jam 932,924.20 7,929.86

sbu_36 Sewa Dump Truck Kap. 10 Ton 1.072 Jam 1,016,814.50 1,089,516.74

sbu_47 Sewa Motor Grader 0.004 Jam 1,235,231.40 5,311.50

sbu_55 Sewa Tandem Roller 0.005 Jam 868,331.10 4,688.99

sbu_60 Sewa Water Tanker 0.014 Jam 546,000.00 7,698.60

8.1.02.03.04.0003 1 Buah Patok Pengarah Buah Nilai Hspk 246,300.00

sbu_66 Tenaga Pekerja 0.168 Oh 143,200.00 24,000.32

sbu_69 Tenaga Tukang 0.084 Oh 179,000.00 15,000.20

sbu_64 Tenaga Mandor 0.021 Oh 214,800.00 4,510.80

Hspk55.a Beton Mutu K-175 k-175 0.036 M3 1,288,200.00 45,731.10

ssh_73 Besi Beton Polos Dia. 10 mm, 12 meter 0.435 Batang 18,253.30 7,934.56

sbu_36 Sewa Dump Truck Kap. 10 Ton 0.147 Jam 1,016,814.50 149,065.01

Kode Barang Uraian Spesifikasi Vol. Sat. Harga Sat. Jumlah

8.1.02.03.04.0003 1 Buah Patok Kilometer Buah Nilai Hspk 425,200.00

sbu_66 Tenaga Pekerja 0.118 Oh 143,200.00 16,883.28

sbu_69 Tenaga Tukang 0.047 Oh 179,000.00 8,448.80

sbu_64 Tenaga Mandor 0.024 Oh 214,800.00 5,069.28

Hspk55.a Beton Mutu K-175 k-175 0.151 M3 1,288,200.00 194,775.84

ssh_73 Besi Beton Polos Dia. 10 mm, 12 meter 1.766 Batang 18,253.30 32,241.81

sbu_36 Sewa Dump Truck Kap. 10 Ton 0.165 Jam 1,016,814.50 167,774.39

8.1.02.03.04.0003 1 Buah Patok Hektometer Buah Nilai Hspk 292,800.00

sbu_66 Tenaga Pekerja 0.118 Oh 143,200.00 16,883.28

sbu_69 Tenaga Tukang 0.047 Oh 179,000.00 8,448.80

sbu_64 Tenaga Mandor 0.024 Oh 214,800.00 5,069.28

Hspk55.a Beton Mutu K-175 k-175 0.063 M3 1,288,200.00 81,156.60

ssh_73 Besi Beton Polos Dia. 10 mm, 12 meter 0.736 Batang 18,253.30 13,434.09

sbu_36 Sewa Dump Truck Kap. 10 Ton 0.165 Jam 1,016,814.50 167,774.39

9.1.2.18.04.08.004 Pekerjaan Perlengkapan Jalan Dan Pengatur Lalu Lintas

8.1.02.03.04.0003 1 M3 Bekisting Pondasi Rambu Lalu Lintas M3 Nilai Hspk 83,900.00

sbu_64 Tenaga Mandor 0.003 Oh 214,800.00 708.84

sbu_63 Tenaga Kepala Tukang 0.017 Oh 193,300.00 3,228.11

sbu_69 Tenaga Tukang 0.167 Oh 179,000.00 29,839.30

sbu_66 Tenaga Pekerja 0.067 Oh 143,200.00 9,551.44

ssh_352 Paku Biasa Uk. 2 inch - 5 inch 0.300 Kg 26,000.00 7,800.00

ssh_562 Kayu Bengkirai Papan 0.007 M3 4,030,000.00 27,001.00

ssh_26 Minyak Pelumas 0.100 Liter 57,200.00 5,720.00

8.1.02.03.04.0003 1 Unit Pemotongan Dan Pengeboran Untuk Rambu-rambu Lalu Lintas Unit Nilai Hspk 14,500.00

sbu_64 Tenaga Mandor 0.001 Oh 214,800.00 300.72

sbu_63 Tenaga Kepala Tukang 0.023 Oh 193,300.00 4,349.25

sbu_66 Tenaga Pekerja 0.068 Oh 143,200.00 9,666.00

ssh_155 Gergaji Besi 0.001 Buah 129,480.00 129.48

ssh_308 Mata Bor Besi Bosch Hss - G - 10.0 mm 0.001 Buah 26,000.00 26.00

8.1.02.03.04.0003 1 Unit Perakitan Dan Penyetelan Untuk Rambu-rambu Lalu Lintas Unit Nilai Hspk 85,300.00

sbu_64 Tenaga Mandor 0.075 Oh 214,800.00 16,110.00

sbu_69 Tenaga Tukang 0.375 Oh 179,000.00 67,125.00

ssh_x1 alat bantu penyetelan 0.250 unit 8,000.00 2,000.00

8.1.02.03.04.0003 1 Unit Pengeboran Dan Pemasangan Paku Jalan M1 Nilai Hspk 57,300.00

sbu_66 Tenaga Pekerja 0.400 Oh 143,200.00 57,280.00

8.1.02.03.04.0003 1 Unit Pengeboran Dan Pemasangan Paku Jalan Bulat (tempered) Unit Nilai Hspk 80,200.00

sbu_66 Tenaga Pekerja 0.560 Oh 143,200.00 80,192.00

8.1.02.03.04.0003 1 M1 Penggelaran Kabel M1 Nilai Hspk 6,800.00

sbu_64 Tenaga Mandor 0.010 Oh 214,800.00 2,148.00

sbu_66 Tenaga Pekerja 0.032 Oh 143,200.00 4,582.40

8.1.02.03.04.0003 1 M1 Pemasangan Pipa Pvc Untuk Alat Pemberi Isyarat Lalu Lintas M1 Nilai Hspk 5,000.00

sbu_64 Tenaga Mandor 0.005 Oh 214,800.00 1,074.00

sbu_66 Tenaga Pekerja 0.027 Oh 143,200.00 3,866.40

8.1.02.03.04.0026.00033 1 M2 Gali Dan Tutup Aspal M2 Nilai Hspk 225,100.00

sbu_66 Tenaga Pekerja 0.433 Oh 143,200.00 62,047.13

ssh_22 Aspal Panas Ac 60/70 2.500 Kg 19,500.00 48,750.00

ssh_56 Batu Pecah Mesin Uk. 0,5 - 1 cm 0.012 M3 824,969.81 9,899.64

ssh_25 Solar Industri 0.500 Liter 22,880.00 11,440.00

sbu_41 Sewa Jack Hammer 1.167 Jam 39,812.50 46,457.21

sbu_54 Sewa Stamper 1.167 Jam 39,812.50 46,457.21

8.1.02.03.04.0026 1 M2 Pengecatan Besi M2 Nilai Hspk 162,700.00

sbu_69 Tenaga Tukang 0.340 Oh 179,000.00 60,860.00

sbu_66 Tenaga Pekerja 0.200 Oh 143,200.00 28,640.00

ssh_97 Cat Besi Warna Hitam 0.425 Kg 85,150.00 36,188.75

ssh_103 Cat Meni Besi 0.125 Kg 65,700.70 8,212.59

ssh_333 Minyak Cat Biasa 0.750 Kaleng 32,500.00 24,375.00

ssh_264 Kuas Cat Uk. 4 Inch 0.100 Buah 28,899.00 2,889.90

ssh_8 Amplas Halus 0.200 Lembar 7,280.00 1,456.00

8.1.02.03.04.0026 1 Unit Pengecatan Tiang Dan Patok Pengaman Unit Nilai Hspk 56,000.00

hspk567.a Pekerjaan Cat Besi 0.344 M2 162,700.00 55,952.53

8.1.02.03.04.0026 1 M1 Ongkos Pengecatan Zebra Cross / Marka Jalan M1 Nilai Hspk 14,700.00

sbu_66 Tenaga Pekerja 0.103 Oh 143,200.00 14,678.00