Biaya Perjalanan.
No. Bahan Volume Satuan Biaya Biaya
(Rp) (Rp)
1. Monitoring, Evaluasi 20,000,000
2. Sewa mobil operasional 10 Hari 550,000 5,500,000
3. Drum plastik 5 Buah 200,000 1,000,000
4. ATK 1 paket 2,100,000 2,100,000
Jumlah Biaya 28,600,000