• Tidak ada hasil yang ditemukan

APPROVE MATERIAL INTAKE SEMEN PCC0

N/A
N/A
eproc luwuutara

Academic year: 2023

Membagikan "APPROVE MATERIAL INTAKE SEMEN PCC0"

Copied!
4
0
0

Teks penuh

(1)

DOCUMENT TRANSMITTAL

To : PT. Ceria Metalindo Prima Date : 13 September 2023

South Quarter Tower A

Jl. Ra Kartini Kav.8 Jakarta - Indonesia Transmittal : D.TRA-DPAPS-INTAKE-SEMEN

Project No. : CMP-DOK.KOK-COS-15.O.VII.2023-014

From : CV D'PAPS CONSTRUCTION

BTN Bukit Damai Abadi Blok K No. 10 Kota Kendari, Sulawesi Tenggara Project : WATER INTAKE AND PIPELINE

No. Rev. Quantity Status Remarks

1 zak

Received by : …...

Date : …...

Aloysius A. Prima Mangiri Project Manager CV D'PAPS CONSTRUCTION Semen PCC Tiga Roda (Opsi)

Semen Portland untuk pengecoran mix di Site

Semen PCC Tonasa 1,679

Approval Material Approval Material

Document Document Description

(2)

Office: BTN Bukit Damai Abadi Blok K No. 10, Kota Kendari, Sulawesi Tenggara Telp : 0812 4564 6545

Email : cvdpaps15@gmail.com

Date : 13 September 2023

Project No. : CMP-DOK.KOK-COS-15.O.VII.2023-014

READY STOK ORDER

GAMBAR KERJA :

RKS / PASAL / NO. :

BROSUR :

A. DISETUJUI B. DITOLAK

C. DITERIMA DENGAN CATATAN

CATATAN :

Aloysius A. Prima Mangiri Osman

Project Manager Engineering Manager

TANGGAL : TANGGAL :

CV D'PAPS CONSTRUCTION PT. CERIA METALINDO PRIMA

DIAJUKAN OLEH: DISETUJUI OLEH:

KONTRAKTOR PEMBERI TUGAS (OWNER)

1. Contoh Material

STATUS MATERIAL CATATAN:

LAMPIRAN

PERSETUJUAN / PENOLAKAN

Semen PCC Tonasa PORTLAND COMPOSITE CEMENT TONASA

Semen PCC Tiga Roda (Opsi) PORTLAND COMPOSITE CEMENT TIGA RODA

CV D'PAPS CONSTRUCTION

PROJECT :

APPROVAL

WATER INTAKE AND PIPELINE CMP, WOLO - KOLAKA

ITEM JENIS MATERIAL PRODUK /

MERK TYPE

STATUS MATERIAL

KETERANGAN

(3)

KATALOG MATERIAL CV. D’PAPS CONSTRUCTION

Hal-1

Material Portland Composite Cement (PCC) Merk Tonasa dan Tiga Roda

(4)

KATALOG MATERIAL CV. D’PAPS CONSTRUCTION

Hal-2

Referensi

Dokumen terkait

The five-step model of Research and Development; 1preliminary research and information gathering, 2 design and developed model, 3 validation of experts and revisions, 4 model testing

Accession Number: WOS:000214326500007 Language: English Document Type: Article Author Keywords: Double rotor; Air-gap flux linkage; IPM; Motor constant square density Addresses: