113
DAFTAR PUSTAKA
Daftar Pustaka
A. Kassem, M., Khoiry, M. A., & Hamzah, N. (2019). Using Probability Impact Matrix (PIM) in Analyzing Risk Factors Affecting the Success of Oil and Gas Construction Projects in Yemen. International Journal of Energy Sector Management, 14(3), 527–546.
ABNT. (2014). NBR 6118: Projeto de estruturas de concreto - procedimento.
ABNT.
Adedokun, O. A., Ibironke, O. T., Dairo, D. O., Aje, I. O., Awodele, O. A., Opawole, A. D., Akinradewo, O. F., & Abiola-Falemu, J. O. (2013).
Evaluation of quantitative risk analysis techniques in selected large construction companies in Nigeria. Journal of Facilities Management, 11(4), 354–368. https://doi.org/10.1108/JFM-11-2012-0053
Ahmed, A., Kayis, B., & Amornsawadwatana, S. (2007). A Review of Techniques for Risk Management in Projects. Benchmarking, 14(1), 22–36.
Ahmed, Q., Khan, F. I., & Raza, S. A. (2014). A Risk-Based Availability Estimation Using Markov Method. International Journal of Quality and Reliability Management, 31(2), 106–128.
Alyami, H., Yang, Z., Riahi, R., Bonsall, S., & Wang, J. (2019). Advanced Uncertainty Modelling for Container Port Risk Analysis. Accident Analysis and Prevention, 123, 411–421. https://doi.org/10.1016/j.aap.2016.08.007 Andriani, D. P., Novianti, V. D., Adnandy, R., & A’Yunin, Q. (2019). Quantitative
Risk Modelling of Occupational Safety in Green Port. IOP Conference Series:
Materials Science and Engineering, 546(5). https://doi.org/10.1088/1757- 899X/546/5/052007
API. (1993). Recommended Practice for Planning , Designing and Constructing Fixed Offshore Platforms — Load and Resistance Factor Design. In API Recommended Practice. American Petroleum Institute.
API. (2007). Recommended Practice for Planning , Designing and Constructing Fixed Offshore Platforms — Working Stress Design. In API Recommended Practice. American Petroleum Institute.
114
Arikunto, S. (2011). Prosedur Penelitian: Suatu Pendekatan Praktik. PT. Rineka Cipta.
Bambang Triatmodjo. (2015). Perencanaan Pelabuhan.
Belagavi, V., & Rugi, P. K. B. (2019). Analysis and Design of Berthing Structure.
International Research Journal of Engineering and Technology, 6(11).
Bharadwaj, U. R., Silberschmidt, V. V., & Wintle, J. B. (2012). A Risk Based Approach to Asset Integrity Management. Journal of Quality in Maintenance Engineering, 18(4), 417–431.
Booty, F. (2009). Facilities Management Handbook. In Facilities Management Handbook (4th ed.). Elsevier.
Bridgestone. (2011). Marine Fender Catalogue (v19 ed.). Bridgestone Corporation.
BS 6349. (2013). BSI Standards Publication Maritime works – Part 1-1 : General – Code of practice for planning and design for operations (3rd ed.). BSI Standards Limited 2013.
Carbonari, S., Antolloni, G., Gara, F., Lorenzoni, C., & Mancinelli, A. (2019). A Performance-Based Approach for the Design of Coupled Dolphin-Fender Berthing Structures. Marine Structures, 64(October 2018), 78–91.
https://doi.org/10.1016/j.marstruc.2018.10.013
Chou, J. S., & Tu, W. T. (2011). Failure Analysis and Risk Management of a Collapsed Large Wind Turbine Tower. Engineering Failure Analysis, 18(1), 295–313. https://doi.org/10.1016/j.engfailanal.2010.09.008
Dewi, A. A. (2013). Aplikasi Formal Safety Assessment (FSA) untuk Penilaian Risiko Kecelakaan di Pelabuhan Semayang Balikpapan. Institut Teknologi Sepuluh Nopember.
DNV-RP-G101. (2010). Risk Based Inspection of Offshore Topsides Static Mechanical Equipment. In Recommended Practice (October).
Doltsinis, I. (2012). From Determinism to Probabilistic Analysis and Stochastic Simulation. In Engineering Computations (Swansea, Wales) (Vol. 29, Nomor 7).
Dumbravă, V., & Vladut-Severian, I. (2013). Using Probability – Impact Matrix in Analysis and Risk Assessment Projects. Journal of Knowledge Management, Economics and Information Technology, 42(December), 76–96.
115 Düpow, H., & Blount, G. (1997). A Review of Reliability Prediction. Aircraft
Engineering and Aerospace Technology, 69(4), 356–362.
Eshghi, S., & Maddah, M. M. (2019). A Study on Influencing Factors for Simplified Seismic Collapse Risk Assessment of Steel MRF with Intermediate Ductility.
International Journal of Structural Integrity, 11(6), 833–848.
https://doi.org/10.1108/IJSI-07-2019-0076
Faghihmaleki, H., Najafi, E. K., & Aini, A. H. (2017). Seismic Rehabilitation Effect in a Steel Moment Frame Subjected to Tow Critical Loads. International Journal of Structural Integrity, 8(1), 25–34.
Fuentes-Bargues, J. L., González-Cruz, M. C., González-Gaya, C., & Baixauli- Pérez, M. P. (2017). Risk analysis of a fuel storage terminal using HAZOP and FTA. International Journal of Environmental Research and Public Health, 14(7). https://doi.org/10.3390/ijerph14070705
Gilchrist, A., Allouche, E., & Cowan, D. (2003). Prediction and Mitigation of Construction Noise in an Urban Environment. Canadian Journal of Civil Engineering, 30(4), 659.
Guédé, F. (2019). Risk-Based Structural Integrity Management for Offshore Jacket Platforms. Marine Structures, 63(March 2017), 444–461.
https://doi.org/10.1016/j.marstruc.2018.04.004 Hardiyatmo, H. C. (2008). Teknik Fondasi 2.
Hillson, D. (2003). Using a Risk Breakdown Structure in Project Management.
Journal of Facilities Management, 2(1), 85–97.
IS. (2007). Code of practice for planning and Design of Ports and Harbours 4651- 2007. Bureau of Indian Standards.
ISO. (2009). International Organization for Standardization ISO 31000: Risk management - Principles and guidelines. In ISO 31000 (First Edit, Vol. 2009).
ISO.
John, A., Yang, Z., Riahi, R., & Wang, J. (2016). A Risk Assessment Approach to Improve The Resilience of A Seaport System Using Bayesian Networks.
Ocean Engineering, 111, 136–147.
https://doi.org/10.1016/j.oceaneng.2015.10.048
Kachlakev, D., Niller, T., Yim, S., Chansawat, K., & Potisuk, T. (2001). Finite
116
Element Modeling of Reinforced Concrete Structures Strengthened with FRP Lamiantes. Journal of Engineering Materials and Technology, SPR 316, 99.
Klaus-Jurgen Bathe. (2008). The Finite Element Method. In Wiley Encyclopedia of Computer Science and Engineering.
Kwak, Y., & Ingall, L. (2009). Exploring Monte Carlo Simulation Applications for Project Management. IEEE Engineering Management Review, 37(2), 83–83.
Ladesi, V. K. (2009). Model Formal Safety Assessment (FSA) Untuk Penilaian Risiko Kecelakaan Di Pelabuhan Kendari. Institut Teknologi Sepuluh Nopember.
Lind, S., Nenonen, S., & Rahnasto, J. K. (2008). Safety Risk Assessment in Industrial Maintenance. Journal of Quality in Maintenance Engineering, 14(2), 205–217.
Lind, Salla, & Nenonen, S. (2008). Occupational Risks in Industrial Maintenance.
Journal of Quality in Maintenance Engineering, 14(2), 194–204.
Lopes, W., Moura, M., Viegas, C., & Real, M. (2019). Analysis of a Dolphin by Analogy of Grid, Finite Element Method with Plate Element and Equivalent Frame Method. Res. Eng. Struct. Mater., 5(4)(May), 427–436.
Maritime Navigation Commission & International Navigation Association. (2002).
Guidelines for the design of fender systems: 2002. Brussels, Belgium:
International Navigation Association.
Murray, S. L., Grantham, K., & Damle, S. B. (2011). Development of a Generic Risk Matrix to Manage Project Risks. Journal of Industrial and Systems Engineering, 5(1), 35–51.
Nguyen, S., & Wang, H. Y. (2018). Prioritizing Operational Risks in Container Shipping Systems by Using Cognitive Assessment Technique. Maritime Business Review, 3(2), 185–206. https://doi.org/10.1108/MABR-11-2017- 0029
OCDI. (2009). Technical Standards and Commentaries for Port and Harbour Facilities in Japan (Port and Airport Research Institute (ed.)). Overseas Coastal Area Development Institute of Japan.
Pallis, P. L. (2017). Port Risk Management in Container Terminals. Transportation
Research Procedia, 25, 4411–4421.
117 https://doi.org/10.1016/j.trpro.2017.05.337
Parra, N. M., Nagi, A., & Kersten, W. (2018). Risk Assessment Methods in Seaports - A Literature Review. HAZARD Project, 24, 59.
https://doi.org/10.13140/RG.2.2.32359.50081
Roubos, A., Peters, D. J., Groenewegen, L., & Steenbergen, R. (2018). Partial Safety Factors for Berthing Velocity and Loads on Marine Structures. Marine Structures, 58(October 2017), 73–91.
Sari, B. S. W. (2015). Risk-Based Ultimate Strength Analysis on Tripod Jacket Wellhead Platform Structure Due to the Occurance of Scouring. Institut Teknologi Sepuluh Nopember.
Simatupang, M., Kimsan, M., & Filzah, N. A. (2019). Perilaku Pondasi Tiang Pancang dengan Mempertimbangkan Interaksi Tanah-Tiang-Struktur pada Gedung Bertingkat Menggunakan SAP2000. 7(1), 1–8.
Sugiyono. (2012). Metode Penelitian Kuantitatif Kualitatif dan R&B. Alfabeta.
Sunaryo, & Hamka, M. A. (2017). Safety Risks Assessment on Container Terminal Using Hazard Identification and Risk Assessment and Fault Tree Analysis
Methods. Procedia Engineering, 194, 307–314.
https://doi.org/10.1016/j.proeng.2017.08.150
Tahmasebinia, F. (2008). Finite Element Simulation of Reinforced Concrete Structures Under Impact Accident. Structural Survey, 26(5), 445–454.
https://doi.org/10.1108/02630800810922784
Tawekal, J. R., & Tawekal, R. L. (2018). Risk Reliability-Based Underwater Inspection Method for Jacket Platforms in Indonesia. International Journal of Structural Integrity, 9(5), 603–615.
Trelleborg Marine System. (2018). Bollards Product Brochure. Trelleborg.
Wijeratne, W. M. P. U., Perera, B. A. K. S., & De Silva, L. (2014). Identification and Assessment Risks in Maintenance Operations. Built Environment Project and Asset Management, 4(4), 384–405.
Williams, T. (1995). A Classified Bibliography of Recent Research Relating to Project Risk Management. European Journal of Operational Research, 85(1), 18–38.