DEVELOPING KANBAN SYSTEM TO IMPROVE THE SUPPLY CHAIN Page 74 of 102
IN A LOCAL TOY MANUFACTURING COMPANY
Yeremia Kevin Ongkowijoyo REFERENCES
Abhishek Dixit, Vikas Dave, & Alakshendra Pratap Singh. (2015). Lean
Manufacturing: An Approach for Waste Elimination. International Journal of Engineering Research And, V4(04). https://doi.org/10.17577/ijertv4is040817
Aguilar-Savén, R. S. (2004). Business process modelling: Review and framework.
International Journal of Production Economics, 90(2), 129–149.
https://doi.org/10.1016/S0925-5273(03)00102-6
Al Haraisa, Y. E. (2017). Just-In-Time System and Its Impact on Operational Excellence: An Empirical Study on Jordanian Industrial Companies.
International Journal of Business and Management, 12(12), 158.
https://doi.org/10.5539/ijbm.v12n12p158
Alves, A. C., Dinis-Carvalho, J., & Sousa, R. M. (2012). Lean production as promoter of thinkers to achieve companies’ agility. Learning Organization, 19(3), 219–
237. https://doi.org/10.1108/09696471211219930
Barbosa-Povoa, A. P., & Pinto, J. M. (2020). Process supply chains: Perspectives from academia and industry. Computers and Chemical Engineering, 132.
https://doi.org/10.1016/j.compchemeng.2019.106606
Chae, B. (2009). Developing key performance indicators for supply chain: An industry perspective. Supply Chain Management, 14(6), 422–428.
https://doi.org/10.1108/13598540910995192
Doggett, A. M. (2005). Root Cause Analysis: A Framework for Tool Selection.
Quality Management Journal, 12(4), 34–45.
https://doi.org/10.1080/10686967.2005.11919269
Doomun, R., & Jungum, N. V. (2008). Business process modelling, simulation and reengineering: Call centres. Business Process Management Journal, 14(6), 838–
DEVELOPING KANBAN SYSTEM TO IMPROVE THE SUPPLY CHAIN Page 75 of 102
IN A LOCAL TOY MANUFACTURING COMPANY
Yeremia Kevin Ongkowijoyo 848. https://doi.org/10.1108/14637150810916017
Govil, M., & Proth, J. M. (2001). Supply chain design management and. In Soft Computing. Retrieved from http://books.google.fr/books?id=AsUMo2euPUkC
Hakimi, S., Zahraee, S. M., & Mohd Rohani, J. (2018). Application of Six Sigma DMAIC methodology in plain yogurt production process. International Journal of Lean Six Sigma, 9(4), 562–578. https://doi.org/10.1108/IJLSS-11-2016-0069
Halley, A., & Beaulieu, M. (2010). A multidimensional analysis of supply chain integration in canadian manufacturing. Canadian Journal of Administrative Sciences, 27(2), 174–187. https://doi.org/10.1002/cjas.144
Hallgren, M., & Olhager, J. (2009). Lean and agile manufacturing: External and internal drivers and performance outcomes. International Journal of Operations and Production Management, 29(10), 976–999.
https://doi.org/10.1108/01443570910993456
Javadian Kootanaee, A., Babu, K. N., & Talari, H. F. (2013). Just-In-Time Manufacturing System: From Introduction to Implement. SSRN Electronic Journal, 1(2), 7–25. https://doi.org/10.2139/ssrn.2253243
Keramati, A., Golian, H. R., & Afshari-Mofrad, M. (2011). Improving business processes with business process modelling notation and business process execution language: An action research approach. International Journal of Business Information Systems, 7(4), 458–476.
https://doi.org/10.1504/IJBIS.2011.040568
Kumar, C. S., & Panneerselvam, R. (2007). Literature review of JIT-KANBAN system. International Journal of Advanced Manufacturing Technology, 32(3–4), 393–408. https://doi.org/10.1007/s00170-005-0340-2
LEOŃCZUK, D. (2016). Categories of Supply Chain Performance Indicators: an Overview of Approaches. Business, Management and Education, 14(1), 103–
115. https://doi.org/10.3846/bme.2016.317
DEVELOPING KANBAN SYSTEM TO IMPROVE THE SUPPLY CHAIN Page 76 of 102
IN A LOCAL TOY MANUFACTURING COMPANY
Yeremia Kevin Ongkowijoyo Melnyk, S. A., Narasimhan, R., & DeCampos, H. A. (2014). Supply chain design:
Issues, challenges, frameworks and solutions. International Journal of Production Research, 52(7), 1887–1896.
https://doi.org/10.1080/00207543.2013.787175
Melton, T. (2005). The benefits of lean manufacturing: What lean thinking has to offer the process industries. Chemical Engineering Research and Design, 83(6 A), 662–673. https://doi.org/10.1205/cherd.04351
Mostafa, S., & Dumrak, J. (2015). Waste Elimination for Manufacturing Sustainability. Procedia Manufacturing, 2(February), 11–16.
https://doi.org/10.1016/j.promfg.2015.07.003
Patole, S. M., & Jadhav, P. S. R. (2015). Development of kanban system for valve manufacturing industries using Just in time. 3(Iii), 294–298.
R., W., Raut.L., & Talmale.P. (2015). Overview on Kanban Methodology and its Implementation Overview on Kanban Methodology and its Implementation. Ijsrd - International Journal for Scientific Research & Development, 3(02), 2518–
2521. https://doi.org/10.1109/MMM.2012.2189504
Sethi, S., Yan, H., & Zhang, H. (2005). Inventory and Supply Chain.
Simboli, A., Taddeo, R., & Morgante, A. (2014). Value and Wastes in Manufacturing.
An Overview and a New Perspective Based on Eco-Efficiency. Administrative Sciences, 4(3), 173–191. https://doi.org/10.3390/admsci4030173
Smętkowska, M., & Mrugalska, B. (2018). Using Six Sigma DMAIC to Improve the Quality of the Production Process: A Case Study. Procedia - Social and
Behavioral Sciences, 238, 590–596. https://doi.org/10.1016/j.sbspro.2018.04.039
Sundar, R., Balaji, A. N., & Satheesh Kumar, R. M. (2014). A review on lean manufacturing implementation techniques. Procedia Engineering, 97, 1875–
1885. https://doi.org/10.1016/j.proeng.2014.12.341
Taj, S., & Morosan, C. (2011). The impact of lean operations on the Chinese
DEVELOPING KANBAN SYSTEM TO IMPROVE THE SUPPLY CHAIN Page 77 of 102
IN A LOCAL TOY MANUFACTURING COMPANY
Yeremia Kevin Ongkowijoyo manufacturing performance. Journal of Manufacturing Technology
Management, 22(2), 223–240. https://doi.org/10.1108/17410381111102234
Waters, D. (2003). Logistics - An introduction to SCM. ] 404–399, 91, ز. Retrieved from https://library.aceondo.net/ebooks/Business_Management/logistics-
an_introduction_to_supply_chain_management%5Bpalgrave.macmillan%5D%5 B2003%5D.pdf