Estimasi Biaya dan Pekerjaan

N/A
N/A
Jawara

Academic year: 2024

Membagikan " Estimasi Biaya dan Pekerjaan"

Copied!
7
0
0

Teks penuh

(1)

645

640

P.5A P.6A

P.7A P.8A

P.9A P.10A

Jl. Kalawara - Kulawi

Jalan Petani

Jalan Petani Jalan Petani

ENDSILL

GROUNDSILL

+644.61 +644.61

15.00

25.00 20.00

20.00

Gambar Shop Drawing :

Provinsi :

SULAWESI TENGAH

PPK SUNGAI DAN PANTAI II

RIVER IMPROVEMENT AND SEDIMENT CONTROL IN NAMO RIVER AND KULAWI

RIVER AREA KAB. SIGI

Pekerjaan :

K E M E N T E R I A N P E K E R J A A N U M U M D A N P E R U M A H A N R A KY A T

B A L A I W I L A Y A H S U N G A I S U L A W E S I I I I P A L U S N V T P E L A K S A N A A N J A R I N G A N S U M B E R A I R W S . P A L U - L A R I A N G , W S . P A R I G I - P O S O , W S . K A L U K U - K A R A M A P R O V I N S I S U L A W E S I T E N G A H

J a l a n A b d u l R a h m a n S a l e h N o . 2 3 0 P a l u T e l e p o n 0 4 5 1 - 4 8 2 1 4 7 F a k s i m i l i 0 4 5 1 - 4 8 2 1 0 1

DIREKTORAT JENDERAL SUMBER DAYA AIR Sungai E isting

LEGENDA :

Jalan Desa Pemukiman Bungunan Dam As Rencana Sungai

N

S

E

W E

N W

S SKALA 1 : 500

SITUASI GROUNDSILL DAN ENDSILL

SUNGAI NAMO

(2)

DENAH GROUNDSILL DAN ENDSILL SUNGAI NAMO SKALA 1 : 300

P.7A

ENDSILL GROUNDSILL

30.00 15.00

25.00

20.00

20.00

646.90

P.6A

Pasangan Batu (Existing)

8.21 5.25

3.00

Revetment

Batu Boulder (200-500 Kg) Revetment

Beton Sikloop

Batu Boulder 650 - 800 Kg Groundsill Beton Mutu (K225)

Endsill

Beton Mutu (K225)

646.01 649.51 646.01

20.00

646.48 649.98 646.48

649.99

648.11 648.11

645.49 649.00

S = 4.95 %

S = 5.5 %

12.77

S = 7.00 % S = 7.00 %

Expansion and

Contraction Joint

10.00 10.00

Expansion and Contraction Joint

15.00 15.00

P.8A + 6.5 m

LS

644.61

642.69 646.19

647.12 647.96

646.19 646.19

Gambar Shop Drawing :

Provinsi :

SULAWESI TENGAH

PPK SUNGAI DAN PANTAI II

RIVER IMPROVEMENT AND SEDIMENT CONTROL IN NAMO RIVER AND KULAWI

RIVER AREA KAB. SIGI

Pekerjaan :

K E M E N T E R I A N P E K E R J A A N U M U M D A N P E R U M A H A N R A KY A T

B A L A I W I L A Y A H S U N G A I S U L A W E S I I I I P A L U S N V T P E L A K S A N A A N J A R I N G A N S U M B E R A I R W S . P A L U - L A R I A N G , W S . P A R I G I - P O S O , W S . K A L U K U - K A R A M A P R O V I N S I S U L A W E S I T E N G A H

J a l a n A b d u l R a h m a n S a l e h N o . 2 3 0 P a l u T e l e p o n 0 4 5 1 - 4 8 2 1 4 7 F a k s i m i l i 0 4 5 1 - 4 8 2 1 0 1

DIREKTORAT JENDERAL SUMBER DAYA AIR

DENAH GROUNDSILL DAN ENDSILL SUNGAI NAMO Galian Tanah

Timbunan Tanah Tanah Eksisting

Center Line (As Alur Sungai) CL

LEGENDA :

Proyeksi Bangunan

E pansion Joint

High Water Level

(3)

636.00

654.637 651.905 647.052 645.769 644.193 644.013 645.177 643.987 643.369 645.001 644.645 648.509 648.373 648.484

8.72 8.18 6.57 1.23 2.81 2.80 9.69

0.79 11.52 4.34 12.28 1.87 5.06

659

655

650

645

P.7A

2% 2%

Left Bank (South Side) Right Bank

(North Side)

1.75 20.00

CL H.W.L

CROSS SECTION NO. 7A SKALA 1 : 300

3.50 2.70

1.75

640

0.50 0.50

1.50

644.61 647.31 648.11

3.00

643.11

Groundsill Beton Mutu (K225)

Revetment Beton Sikloop

5.00

3.00

13.69 8.35

Timbunan Tanah

1.00

20.00

1.40

Timbunan Tanah Kembali Expansion and

Contraction Joint

10.00 10.00

1:0.5 1:0.5

1:0.5 1:0.5

2.50 15.00

2.50

2.00 2.50

644.61

4.50

642.61

640.11

1:1

1:1

ELEVASI TANAH ASLI ORIGINAL GROUND LEVEL JARAK (m)

DISTANCE (m)

reference level bidang persamaan

Gambar Shop Drawing :

Provinsi :

SULAWESI TENGAH

PPK SUNGAI DAN PANTAI II

RIVER IMPROVEMENT AND SEDIMENT CONTROL IN NAMO RIVER AND KULAWI

RIVER AREA KAB. SIGI

Pekerjaan :

K E M E N T E R I A N P E K E R J A A N U M U M D A N P E R U M A H A N R A KY A T

B A L A I W I L A Y A H S U N G A I S U L A W E S I I I I P A L U S N V T P E L A K S A N A A N J A R I N G A N S U M B E R A I R W S . P A L U - L A R I A N G , W S . P A R I G I - P O S O , W S . K A L U K U - K A R A M A P R O V I N S I S U L A W E S I T E N G A H

J a l a n A b d u l R a h m a n S a l e h N o . 2 3 0 P a l u T e l e p o n 0 4 5 1 - 4 8 2 1 4 7 F a k s i m i l i 0 4 5 1 - 4 8 2 1 0 1

DIREKTORAT JENDERAL SUMBER DAYA AIR

Galian Tanah Timbunan Tanah Tanah Eksisting

Center Line (As Alur Sungai) CL

LEGENDA :

Proyeksi Bangunan E pansion Joint

High Water Level CROSS SECTION P.7A

GROUNDSILL

(4)

2.00

20.00

644.61

Groundsill Beton Mutu (K225) 644.61

2

1

DENAH GROUNDSILL SKALA 1 : 200

PERSPEKTIF GROUNDSILL Expansion and

Contraction Joint

10.00 10.00

Expansion and Contraction Joint

4.50

2.00 2.50

0.90 2.00

Groundsill Beton Mutu (K225)

2.90

POTONGAN 2 - 2 GROUNDSILL SKALA 1 : 200

1:0.2 CL

H.W.L

1:1

2.50 15.00

2.50

20.00

2.00 2.50

4.50

POTONGAN 1 - 1 GROUNNDSILL SKALA 1 : 200

Expansion and Contraction Joint

10.00 10.00

642.61

640.11

15.00

2.50 2.00

2.00

0.90

2.90

644.61 642.61

640.11

644.61 642.61

640.11

1:1

1:1

1:1

Gambar Shop Drawing :

Provinsi :

SULAWESI TENGAH

PPK SUNGAI DAN PANTAI II

RIVER IMPROVEMENT AND SEDIMENT CONTROL IN NAMO RIVER AND KULAWI

RIVER AREA KAB. SIGI

Pekerjaan :

K E M E N T E R I A N P E K E R J A A N U M U M D A N P E R U M A H A N R A KY A T

B A L A I W I L A Y A H S U N G A I S U L A W E S I I I I P A L U S N V T P E L A K S A N A A N J A R I N G A N S U M B E R A I R W S . P A L U - L A R I A N G , W S . P A R I G I - P O S O , W S . K A L U K U - K A R A M A P R O V I N S I S U L A W E S I T E N G A H

J a l a n A b d u l R a h m a n S a l e h N o . 2 3 0 P a l u T e l e p o n 0 4 5 1 - 4 8 2 1 4 7 F a k s i m i l i 0 4 5 1 - 4 8 2 1 0 1

DIREKTORAT JENDERAL SUMBER DAYA AIR

Galian Tanah Timbunan Tanah Tanah Eksisting

Center Line (As Alur Sungai) CL

LEGENDA :

Proyeksi Bangunan E pansion Joint High Water Level

DETAIL GROUNDSILL

(5)

635.00 640 645 650 655 660

656.499 649.440 647.067 644.545 643.862 643.510 641.743 642.610 643.011 643.695 643.885 643.184 647.105 647.305 647.421

10.91 7.72 1.84 17.02 2.15 3.20 5.82 2.97

0.92 4.03 10.21 5.66 2.86 3.13

ELEVASI TANAH ASLI ORIGINAL GROUND LEVEL JARAK (m)

DISTANCE (m)

reference level bidang persamaan

CL

CROSS SECTION ENDSILL SKALA 1 : 300

2% 2%

H.W.L

Revetment

Beton Sikloop Revetment

Batu Boulder

Endsill Beton Mutu (K225) 1:1

1:1 1:0.5

1:0.5

13.25 1.75 20.00 1.75 3.25

1.00 28.00

1.00

30.00

3.50 1.50

5.00 2.00 1.00

3.00 2.70

Expansion and Contraction Joint

15.00 15.00

P.8A 6.5 m

Left Bank (South Side) Right Bank

(North Side)

642.69

639.69 640.69 642.69 641.19

642.69 646.19

646.90 645.39

Gambar Shop Drawing :

Provinsi :

SULAWESI TENGAH

PPK SUNGAI DAN PANTAI II

RIVER IMPROVEMENT AND SEDIMENT CONTROL IN NAMO RIVER AND KULAWI

RIVER AREA KAB. SIGI

Pekerjaan :

K E M E N T E R I A N P E K E R J A A N U M U M D A N P E R U M A H A N R A KY A T

B A L A I W I L A Y A H S U N G A I S U L A W E S I I I I P A L U S N V T P E L A K S A N A A N J A R I N G A N S U M B E R A I R W S . P A L U - L A R I A N G , W S . P A R I G I - P O S O , W S . K A L U K U - K A R A M A P R O V I N S I S U L A W E S I T E N G A H

J a l a n A b d u l R a h m a n S a l e h N o . 2 3 0 P a l u T e l e p o n 0 4 5 1 - 4 8 2 1 4 7 F a k s i m i l i 0 4 5 1 - 4 8 2 1 0 1

DIREKTORAT JENDERAL SUMBER DAYA AIR

Galian Tanah Timbunan Tanah Tanah Eksisting

Center Line (As Alur Sungai) CL

LEGENDA :

Proyeksi Bangunan E pansion Joint

High Water Level CROSS SECTION P.8A + 6.5 M

ENDSILL

(6)

3.00 2.00 1.00 0.60 2.00

Endsill

Beton Mutu (K225)

2.60

POTONGAN 2 - 2 ENDSILL SKALA 1 : 200

5.25 3.00

3.00

1.50 3.50 5.00

6.31

1:1.5

1:1.5 H.W.L

0.70 2.00 8.25

2.70

30.00

642.69

CL H.W.L

1:1

1:1

28.00 1.00 1.00

30.00

2.00 1.00

3.00

POTONGAN 1 - 1 ENDSILL SKALA 1 : 200

DENAH ENDSILL SKALA 1 : 200

2

1 Expansion and

Contraction Joint

15.00 15.00

1.50 13.50

13.50 1.50

Expansion and Contraction Joint

15.00 15.00

TYPICAL REVETMENT BATU BOULDER SKALA 1 : 200

Batu Boulder 200 - 500 Kg

Geotextile NW - 400 gsm Timbunan Tanah

Kembali

1:0.5

0.50

1:0.2 639.69

640.69 642.69

639.69 640.69 642.69

Gambar Shop Drawing :

Provinsi :

SULAWESI TENGAH

PPK SUNGAI DAN PANTAI II

RIVER IMPROVEMENT AND SEDIMENT CONTROL IN NAMO RIVER AND KULAWI

RIVER AREA KAB. SIGI

Pekerjaan :

K E M E N T E R I A N P E K E R J A A N U M U M D A N P E R U M A H A N R A KY A T

B A L A I W I L A Y A H S U N G A I S U L A W E S I I I I P A L U S N V T P E L A K S A N A A N J A R I N G A N S U M B E R A I R W S . P A L U - L A R I A N G , W S . P A R I G I - P O S O , W S . K A L U K U - K A R A M A P R O V I N S I S U L A W E S I T E N G A H

J a l a n A b d u l R a h m a n S a l e h N o . 2 3 0 P a l u T e l e p o n 0 4 5 1 - 4 8 2 1 4 7 F a k s i m i l i 0 4 5 1 - 4 8 2 1 0 1

DIREKTORAT JENDERAL SUMBER DAYA AIR

Galian Tanah Timbunan Tanah Tanah Eksisting

Center Line (As Alur Sungai) CL

LEGENDA :

Proyeksi Bangunan E pansion Joint

High Water Level DETAIL ENDSILL & REVETMENT

BATU BOULDER

(7)

0.60 2.00

1:0.2 1:0.5

10.38 14.98

LONG SECTION GROUNDSILL ENDSILL SKALA 1 : 300

635.00 640 645 650 655

ELEVASI TANAH ASLI ORIGINAL GROUND LEVEL JARAK (m)

DISTANCE (m)

reference level bidang persamaan

644.426

643.368

641.801

640.143

10.00

640.972

10.00

642.193 642.584 642.976 643.897

5.00 5.00 5.00 5.00 10.00 10.00

NOMOR PROFIL PROFILE NUMBER ELEVASI CHANNEL WORK PLAN RIVER BED LEVEL

P.7A

Planned Slope 1/14.3 (S=7.00%)

P.6A P.8A

P.9A

2.60

UPSTREAM DOWNSTREAM

644.702 644.611

643.802 645.421 646.231

641.829 642.219

4.50

644.61 2.00

2.90 1:0.2

1.00 1.00

1:0.5 1:0.5

1.00 1.00

640.11

3.00

3.50 3.50

642.69

639.69

0.45 0.91

Endsill

Beton Mutu (K225) Batu Boulder 650 - 800 Kg

Revetment Beton Sikloop

Groundsill Beton Mutu (K225)

Gambar Shop Drawing :

Provinsi :

SULAWESI TENGAH

PPK SUNGAI DAN PANTAI II

RIVER IMPROVEMENT AND SEDIMENT CONTROL IN NAMO RIVER AND KULAWI

RIVER AREA KAB. SIGI

Pekerjaan :

K E M E N T E R I A N P E K E R J A A N U M U M D A N P E R U M A H A N R A KY A T

B A L A I W I L A Y A H S U N G A I S U L A W E S I I I I P A L U S N V T P E L A K S A N A A N J A R I N G A N S U M B E R A I R W S . P A L U - L A R I A N G , W S . P A R I G I - P O S O , W S . K A L U K U - K A R A M A P R O V I N S I S U L A W E S I T E N G A H

J a l a n A b d u l R a h m a n S a l e h N o . 2 3 0 P a l u T e l e p o n 0 4 5 1 - 4 8 2 1 4 7 F a k s i m i l i 0 4 5 1 - 4 8 2 1 0 1

DIREKTORAT JENDERAL SUMBER DAYA AIR

Galian Tanah Timbunan Tanah Tanah Eksisting

Center Line (As Alur Sungai) CL

LEGENDA :

Proyeksi Bangunan E pansion Joint

High Water Level LONG SECTION P.9A - P.6A

GROUNDSILL - ENDSILL

Referensi

Dokumen terkait

Total biaya yang dibutuhkan pada Proyek Jalan Layang Cimindi Bandung. untuk pekerjaan pelat lantai, Trotoar, dan pagar jalan pada

suatu bangunan atau proyek adalah perhitungan banyaknya biaya yang diperlukan untuk bahan dan upah, serta biaya-biaya lain yang berhubungan dengan pelaksanaan

Melalui penerapan rekayasa nilai pada proyek pembangunan Hotel Ciputra World di Surabaya memiliki item pekerjaan yang memiliki potensi biaya tidak diperlukan

Estimasi biaya adalah proses perhitungan biaya dengan mengalikan volume pekerjaan dengan harga dari berbagai macam bahan, alat dan pekerja suatu pekerjaan dalam proyek

Biaya Bulldozer 481,56m³ Untuk mengetahui biaya yang diperlukan dalam pekerjaan perataan dapat dilihat pada pembahasan di bawah ini: Biaya Bulldozer pada perataan Untuk mengetahui

Dokumen ini membahas tentang biaya yang dikeluarkan oleh kontraktor untuk mengikuti pelelangan dalam pekerjaan

Oleh karna itu diperlukan estimasi biaya yang tepat untuk meminimalisir resiko over-estimates dalam proyek perangkat lunak.estimasi biaya pada penelitian ini menggunakan metode

HASIL DAN PEMBAHASAN Pengumpulan Data : Pengumpulan data yang diperlukan untuk mengevaluasi anggaran biaya dan pelaksanaan pekerjaan struktur pada proyek pembangunan Villa Erin