Laboratory Wastewater Treatment and Monitoring System

N/A
N/A
Rurystian Liambo

Academic year: 2024

Membagikan "Laboratory Wastewater Treatment and Monitoring System"

Copied!
2
0
0

Teks penuh

(1)

h. Laboratorium Pretreatment – Heavy Metal Processor

(Unit prapengolahan limbah cair dari laboratorium untuk menjerat kandungan logam berat)

- Type : Heavy Metal Precipiration Unit

- Model : Multifilter Plus

- Flow : 0,2 gpm

- Electrik Power : ± 0,3 KW, 220V, 50 Hz

- Multi-stage Processor tank : FRP (Fiber Reinforced Plastic) - Strainer Circumference : Ion Exchange Processor - Granular Activated carbon : Manual backwash

- Equipment skid : Epoxy coated carbon steel

- Control panel : Wall Mounted

- Quantity : 1 Unit

i. Chlorinator

(alat desunfektan untuk air limbah) 1. Dosing Pump

- System : Mechanical Diagphragm metering pump

- Quantity : 1 Unit

2. Chlorine tank

- Material : Mild steel linning FRP

- Volume : 100 lt

- Quantity : 1 Unit

j. Water Flow Meter

- Type : Flowmeter B & R

k. Panel Controle (Panel Listrik)

- Type : Free Attached – Automatic

- Standart : PLN

- Standart Component : Thermal Overload, Circuit Breaker, Indicating

Lamp, Horn Alarm, Power Suply

(Panel Box)

- Material : Mild Steel 1,5 mm

- Type : Outdoor Type

- Quantity : 1 Unit

l. Contruction Work

- Pipping (jaringan perpiaan air limbah)

Interconnection System : Assembling System, Anti-corrosion Interconnection Water (Interkoneksi air) : PVC

- Material : PVC TYPE D :Ø 3°

PVC TYPE D : Ø 4°

- Control tank : Pair Brick (Pasangan Bata)

- Foundation : Concrete

- Equlization : Anti Corossion, Acid Resistant, Chemical Resistant Waste - Canopy IPAL : Main Frame MS Hollow & Roof : zincalium - Chlorination tank : Pair Brick (Pasangan Bata)

- Fish Bond : Pair Brick (Pasangan Bata)

- Installation of fencing around IPAL (pasangan paga keliling IPAL) - Garden around IPAL : Abstrak

Minimalis (taman di sekeliling IPAL)

(2)

Referensi

Dokumen terkait

Supply, Delivery and Installation of HRM Laboratory Supplies, Materials and Equipment A.. LINENS Item

a LIST OF TABLES Table No Description Page Comparison of benefits and shortcomings between centralized and 2.1 18 decentralized wastewater systems 2.2 Comparison of aerobic

LIST OF FIGURE Figure 1.1 Location of Petra Jaya area in Kuching division Figure 1.2 Wastewater Plant Treatment Systems Figure 2.1 Primary Treatment Systems Figure 2.2 Secondary

Key Engineering Materials, vol.594-595, 2014, pages 191-195 Halal based sourced EM for turbidity reducing in wastewater treatment Abstract Effective Microorganism EM technology

This document provides guidance on laboratory techniques for the confirmation of rabies diagnosis, including sample collection, safety procedures, and diagnostic tests such as DFA and

This document provides guidance on the general accreditation of equipment used in testing and

This document provides guidelines for automated, PCR-based, dideoxy-terminator, and primer extension sequencing done on gel- or capillary-based sequencers in diagnostic laboratory

The document provides a protocol for evaluating the accuracy of a laboratory test to discriminate between two subclasses of