PERHITUNGAN TIMBUNAN TANAH 1.tinggi timbunan
σ'v o = H x (γsat – γwat)
= 7.5 (6.5)
= 48.75 kN/m2
tinggi timbunan = elevasi rencana – existing
= 25.950 - 19.51
= 6.44 m
beban perkerasan = 0.69 x 24 = 16.56 kN/m2 beban pesawat = 15 kN/m2
mengubah dari kN/m ke m :
=16.56
16 = 1.035 m
= 15
16 = 0.9375 m
timbunan awal= 1.035 + 0.9375 + 6.44
= 8.4125 m
Common = 16 x (8.4125 - 2) = 102.6 kN/m Selected = 17 x 2 = 34
∆ σ ' o = 102.6 + 34 = 136.6 m Se1 = Cc H
1+eo log σ'o+∆ σ ' o
∆ σ ' o Se1 = 0.274 15
1+1.25 log 48.75+136.6 48.75 Se1 = 1.059 m
Timbunan awal = 8.4125 m
Timbunan akhir = 8.4125 + (1.059 x 1.2)
= 9.6833 m
2.penurunan
Timbunan akhir = 8.4125 + (1.059 x 1.2)
= 9.6833 m
selected = 2 x 17 = 34 m
common = (9.6833 – 2) x 16 = 122.9328 m
∆ σ ' o = 34 + 122.9328
= 156.9328 m Se2 = 0.274 15
1+1.25 log 48.75+156.9328 48.75
= 1.14 m
3.waktu konsolidasi T90 = 0.848
Cv = 0.0012 cm2/detik H2dr = 0.5 x 15
= 7.5 m Tv = Cv .t
H2dr 0.848 = 0.0012.t
7.5
T = 397500000 sec
= 12.6 tahun