• Tidak ada hasil yang ditemukan

Quantitative Risk Analysis for Oil and Gas Projects: A Case Study

N/A
N/A
Protected

Academic year: 2024

Membagikan "Quantitative Risk Analysis for Oil and Gas Projects: A Case Study"

Copied!
16
0
0

Teks penuh

(1)

Quantitative Risk Analysis for Oil and Gas Projects: A Case Study

by Jati Utomo Dwi Hatmoko

Submission date: 29-Jan-2021 11:24PM (UTC+0700) Submission ID: 1497085659

File name: ive_Risk_Analysis_for_Oil_and_Gas_Projects_-_A_Case_Study_1.pdf (1.27M) Word count: 3888

Character count: 21009

(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)

9

%

SIMILARITY INDEX

5

%

INTERNET SOURCES

6

%

PUBLICATIONS

2

%

STUDENT PAPERS

1

1

%

2

1

%

3

1

%

4

1

%

5

1

%

Quantitative Risk Analysis for Oil and Gas Projects: A Case Study

ORIGINALITY REPORT

PRIMARY SOURCES

www.researchgate.net

Internet Source

Zhenhua Rui, Kehang Cui, Xiaoqing Wang, Jung-Hoon Chun, Yuwei Li, Zhien Zhang, Jun Lu, Gang Chen, Xiyu Zhou, Shirish Patil. "A

comprehensive investigation on performance of oil and gas development in Nigeria: Technical and non-technical analyses", Energy, 2018

Publication

Rateb Sweis, Alireza Moarefi, Mahmood

Hosseini Amiri, Soad Moarefi, Rawan Saleh.

"Causes of delay in Iranian oil and gas projects:

a root cause analysis", International Journal of Energy Sector Management, 2019

Publication

link.springer.com

Internet Source

usir.salford.ac.uk

Internet Source

(13)

6

1

%

7

1

%

8

< 1

%

9

< 1

%

10

< 1

%

11

< 1

%

12

< 1

%

13

< 1

%

Submitted to University of Southampton

Student Paper

ascelibrary.org

Internet Source

Basim Ismail Firas, Kee Wei Yeo, Fazreen Ahmad Fuzi Noor. "Intelligent Prediction of Clinker Formation Condition for Steam Boiler Tubes Using Artificial Neural Network", MATEC Web of Conferences, 2019

Publication

Submitted to Laureate Higher Education Group

Student Paper

Submitted to Universiti Teknologi MARA

Student Paper

Hossein Derakhshanfar, J. Jorge Ochoa, Konstantinos Kirytopoulos, Wolfgang Mayer, Vivian W.Y. Tam. "Construction delay risk

taxonomy, associations and regional contexts", Engineering, Construction and Architectural Management, 2019

Publication

eprints.covenantuniversity.edu.ng

Internet Source

"Advances in Human Factors, Sustainable Urban Planning and Infrastructure", Springer

(14)

14

< 1

%

15

< 1

%

16

< 1

%

17

< 1

%

18

< 1

%

19

< 1

%

20

< 1

%

Science and Business Media LLC, 2019

Publication

hdl.handle.net

Internet Source

epress.lib.uts.edu.au

Internet Source

Mundia Muya, Chabota Kaliba, Balimu

Sichombo, Winston Shakantu. "Cost Escalation, Schedule Overruns and Quality Shortfalls on Construction Projects: The Case of Zambia", International Journal of Construction

Management, 2013

Publication

res.mdpi.com

Internet Source

Mukhtar A Kassem, Muhamad Azry Khoiry, Noraini Hamzah. "Theoretical review on critical risk factors in oil and gas construction projects in Yemen", Engineering, Construction and

Architectural Management, 2020

Publication

"Proceedings of AICCE'19", Springer Science and Business Media LLC, 2020

Publication

Mohammad Miftaur Rahman Khan Khadem, Sujan Piya, Ahm Shamsuzzoha. "Quantitative

(15)

Exclude quotes On Exclude bibliography On

Exclude matches Off

risk management in gas injection project: a case study from Oman oil and gas industry", Journal of Industrial Engineering International, 2017

Publication

(16)

FINAL GRADE

/0

Quantitative Risk Analysis for Oil and Gas Projects: A Case Study

GRADEMARK REPORT

GENERAL COMMENTS

Instructor

PAGE 1 PAGE 2 PAGE 3 PAGE 4 PAGE 5 PAGE 6 PAGE 7 PAGE 8 PAGE 9 PAGE 10

Referensi

Dokumen terkait

It requires to establish the nature of work carried out on the equipment so that maintenance can identify improvement areas in maintenance plan for the equipment, if necessary,

The influence of the company's financial performance as measured by Return on Assets and Debt to Equity Ratio and Systematic Risk to Return of Shares of Oil and Gas Companies

1 Sodium dodecyl sulphate-polyacrylamide gel electrophoresis SDS-PAGE profiles of proteins extracted from oil palm root using different protein extraction methods: 1 trichloroacetic

“ “Real Options Mindset Real Options Mindset” ” ƒ When a decision is made based on evaluation of the real options embedded in a project: ƒ There are assumptions about future

The portfolio selection problem of the project RRSs is combined with four basic concepts i.e., project opportunity, work breakdown structure, risk event, and risk responses as well as

Confl ict Approaches of Effective Project Manager in the Upstream Sector of Indonesian Oil & Gas Industry Adhi Cahyono and Yanki Hartijasti Risk Perception and Economic Value Of

Received 5 October 2012; accepted 26 November 2012 Abstract Issues of Taxation in the Oil and Gas Sector in Selected Countries: Lessons for Ghana undertakes a review of petroleum

Email: [email protected] * Received for Publication: October 23, 2018 * Corrected and Edited: December 15, 2018 * Accepted for Publication: February 14, 2019 Genetic