• Tidak ada hasil yang ditemukan

Sub-Saharan Africa Building Material Prices for Architecture Competition

N/A
N/A
hadifalhie fathurahman

Academic year: 2025

Membagikan "Sub-Saharan Africa Building Material Prices for Architecture Competition"

Copied!
2
0
0

Teks penuh

(1)

KAIRA LOORO

ARCHITECTURE COMPETITION MATERIAL PRICES

This is only an example materials list in Sub-Saharan Africa.

Participants are free to use any other type of material in according to design requirements.

For materials not listed, average international market prices can be used.

Average prices of building materials in Sub-Saharan Africa

Material Unit Use Price (€)

Cement / Sand Brick 1 brick 20 x 30 x 15centimeters Structure 1,5

Earth/laterite Brick 1 brick 20x30x15centimeters Structure 1,2

Earth/laterite Brick with

cement 1 brick 20x30x15centimeters Structure 2

Clay Brick 1 brick Structure 0,3

Cement 32.5 1 ton Structure 120

White wood plank 1 (3meters x 25 centimeters x 3

centimeters) roofing and carpentry 9,3

Bamboo Vulgaris 1 bamboo (diameter 15/20 centimeters –

length 6 meters) Forniture 3,8

River sand 15 m3 concrete 35

Rosewood trunk 1 trunk Forniture and carpentry 234

Rosewooor beam 5centimeters x 8centimeters x 4 meters Carpentry 8,5

Rosewood plank 4 centimeters x 20centimeters x 4 meters Forniture 11,45 Rosewood

(it is possible to request non-standard sizes from sawmills)

1m3 Forniture and carpentry 545

Iron tube 1 pipe (6meters x 2centimeters) Building 13

Plastic bags 1000 (1meters x 0,5metersx0,2meters) Food storage 306

Laterite earth 5 m3 Building 109,5

Laterite stone (shapeless

stones) 5 m3 Building 154

Laterite aggregates 5 m3 Building 120

Black aggregates for

concrete 5 m3 Infrastrutture 900

Shells from river 50kg Decoration and aggregate 15

Sheet metal corrugated 1 element (2meters x 0,8meters) Roof 15

Sheet metal with

decoration 80

Red clay / laterite earth 8 m3 Brick 85

Sand 8 m3 Brick 50

Iron for reinforced concrete 12mm / 8mm / 6mm Length 12 meters

9 elements 12 elements 20 elements

Reinforcement of

concrete 70

(2)

Straw A group of straw (length 1.5m - diameter

50centimeters) Roof 0,5

Wild bamboo 1 bamboo (diameter 2/4 centimeters –

length 5 meters) Fence production 0,5

Local bamboo fence 1,5meters x 2,5meters Fence 5

Barbed wire 1 roll of 80 meters Fence 10

Iron profile IPE 100 as per international standards Building 114

Iron profile IPE 80 as per international standards Building 38

Square iron profile 6centimeters x 8 centimeters x 6 meters Building and furnitures 20 L-shaped iron profile 4centimeters x 4 centimeters x 6 meters Building and furnitures 11

Fabrics 1 m2 clothes 2

Tires 1 tires (different sizes because they are

discarded) Fence and furniture 1,5

Tiles 1m2 Floor 10

Broken tiles 5 m2 Floor and decorations 40

Multilayer panel (bois) 2,50meters x 1,40meters,

thickness 8-10mm countertop and formiture 25€

Multilayer plywood

wood 125centimeters x 235 centimeters

thickness 10mm roof 20€

Half an empty pumpkin Variable diameter between 25 and 40

centimetres variable price

between 2.5€

and 5€

Rammed earth * It there is no fixed cost because it depends on the type of dosage (quantity of earth, cement etc.) therefore the designer must foresee the quantities of the individual parts

Building The cost of the rammed earth must be evaluated by the competitor who decides the various proportions used to compose the material (for example sand, cement, earth, etc.)

Palm trunk There is no fixed size because it depends on the type of tree and its age. The competitor may refer to the average size of the trees

carpentry there is no cost because they are not for sale, but the cost must be agreed with the authorities and with the landowner. For these, it is possible to indicate a flat- rate price at the competitor's choice

Referensi

Dokumen terkait

Original Article The state of Business Ethics as field of teaching, training and research in Sub-Saharan Africa GJ Deon Rossouw Philosophy Department, University of Pretoria, South

Inambao, "Design basics of a small hydro turbine plant for capacity building in sub-Saharan Africa," African Journal of Science, Technology, Innovation and Development, vol..

Supplementary material to manuscript: The impact of antiretroviral treatment on the age composition of the HIV epidemic in sub-Saharan Africa General model structure We used STDSIM,

R E S E A R C H Open Access Maternal and child factors associated with timely initiation of breastfeeding in sub- Saharan Africa Francis Appiah1,2, Bright Opoku Ahinkorah3, Eugene

Abbreviations SSA Sub-Saharan Africa TBM Triple burden of malnutrition DBM Double burden of malnutrition ANC Antenatal care visits PNC Postnatal care visits SDGs Sustainable

Keywords: Intimate partner violence, Sexual autonomy, Sub‑Saharan Africa, Demographic and Health Survey Plain language summary Globally, intimate partner violence is regarded as a

Factors associated with high parity among women aged 15–49 in sub-Saharan Africa Variable Model 0 Model I aOR 95%CI Model II aOR 95%CI Model III aOR 95%CI Safer sex negotiation No

Bivariate analysis of safer sex negotiation, comprehensive HIV/AIDS knowledge and selected covariates of adolescent girls and young women in sub-Saharan Africa Variable Weightedn