SURAT PERINTAH LEMBUR
Date: Sabtu, 21 Oktober 2023
Plan Actual Start Finish
1 FWA 17410-BZA50 Pipe Exh Front D26A 200;200 07.00 12.10 7
17420-BZ010 Pipe Exh Center D26A 400 07.00 12.10 7
17430-BZ530 Pipe Exh Tail D26A 550 07.00 12.10 4
2 FWA 17420-VT020 Pipe Exh Tail 560B 130 07.00 12.10 3
3 FWA 20010W120P Pipe Exh Front RN 260 07.00 12.10 8
4 FWA 20050B000P Pipe Exh Center 5H45 168 07.00 12.10 5
20100B000P Pipe Exh Tail 5H45 140 07.00 12.10 4
5 FWA bracket 560;D26A;D03B 650;650 07.00 12.10 3
6 MAS 4 MAIN MUFFLER D26A 1008 07.00 14.40 12
7 SPIN 4-6-7 SM 338 (SPIN 4) -SM D26A
(SPIN 6-7) SUBMUFFLER 338; RN 120; 200 07.00 12.10 1
SPIN 5-8-16 CCO 560 (SPIN 16) - SM D26A
(SPIN 5-8) SUBMUFFLER; CCO 560; D26A 125; 200 07.00 12.10 1
SPIN 13-14-15 SM 560 (SPIN 13-14) - CCO 560
(SPIN 15) SUBMUFFLER; CCO 560B 125;125 07.00 12.10 1
SPIN 11-17-18 SM D03B (SPIN 11) - RN ANU
(SPIN 17/18) SUBMUFFLER; CCO D03B; RN 120;200 07.00 12.10 1
SPIN 9-10-12 SM 338 (SPIN 9) - RN ANU
(SPIN 10-12) SUBMUFFLER; CCO 338; RN 120;200 07.00 12.10 1
ROBOT WELD BZ220;220 CCO D26A 200;200 07.00 12.10 2
8 PLASMA 3 SM 560; SM 338 300; 100 07.00 12.10 1
PLASMA 4 SM D26A 400 07.00 12.10 1
TIG WELD BZ220 650 07.00 12.10 1
CUTTING 4L45V&RN ANU
SM D26A; SM 560
200;400
400;200 07.00 12.10 2
PRESS IN 2 CCO D26A 500 07.00 12.10 1
PRESS IN 3 CCO 560B 500 07.00 12.10 1
PRESS IN 5 RN ANU 500 07.00 12.10 1
SWA 560+D26A SM 560; SM D26A 600 07.00 12.10 5
ROOVING 560B; D03B 200 07.00 12.10 1
ROLL 4L45V&RN ANU
SM D26A; SM 560
500;800
800;500 07.00 12.10 2
9 BL03 Tail 2 D26A 940 07.00 12.10 1
BL07 Center 2 5H45 750 07.00 12.10 1
BL09 Center 2 BZ020 (1,0) D26A 300 07.00 12.10 1
BL11 Center 2 BZ010 (1,2) D26A 300 07.00 12.10 1
BL12 Front 2 D26A 750 07.00 12.10
BL13 Center 1 D26A 810 07.00 12.10
BL14 Inlet 5H45 940 07.00 12.10
BL15 Front 1 D26A 500 07.00 12.10
BL16 Center 1 D26A 500 07.00 12.10
BL17 Tail 1 560B 750 07.00 12.10
buffing
1. Front 1,2 D26A 2. Center 1, 2 D26A; D03B 3. Front 4, Tail 1 560B, Tail 1 D26A
07.00 12.10 3
cutitng & sizing
1. Center 2 D26A; Tail 2 D26A
2. Fr 2, 3 560, Tail 2 560 3. Tail 2 5H45
07.00 12.10 3
spot & drilling 1. Center 2, Front 2 D26A
2. Front 1 D26A 07.00 12.10 2
CUTTING/EXPAND/B UFFING
Shift 1
No. Line Part Number Part Name Type Qty Time
MP
1
1
1
Nomor Dokumen : KFN/FR/PPC/06/00 Tanggal Terbit : 21 Agustus 2017
Revisi : 00
Dept. : PPC
10 SUS 439 48,6 x 1,0 x 2464 Front 1 D26A 600 07.00 12.10
SUS 409 42,7 x 1,5 x 1180 Tail 2 BZ510 D40L 600 07.00 12.10
SUS 439 42,7 x 1,0 x 530 Front 2 D26A 600 07.00 12.10
SUS 439 42,7 x 1,0 x 2400 Center 1 D26A 600 07.00 12.10
CUTTING PIPE MC 3 SUS 409 48,6 x 2,0 x 2600 Front 4 560B 1200 07.00 12.10 1
SUS 439 10 x 1,2 x 80 F7561-BZ030-02 Support no 2 D26A 5000 SUS 439 10 x 1,2 x 173 F7561-BZ030-01 Support no 1 D26A 5000
11 BLANK N1 BZ270-S302 INNER PIPE D26A 10000 07.00 12.10
BLANK N2 17441-BZ200-H FLANGE N0 1 D26A 10000 07.00 12.10
12 STAMP LINE B F7562-BZ020-01 SUS
439 10*1,2*164 BRACKET N0 2 (164) D26A 2500 07.00 12.10 4
STAMP LINE O F7563-BZ090-01
SUS 439 10*1,2*103,5 ROD (103,5) D03B 3000 07.00 12.10 3
ME226468 Pipe TD Colt 200 07.00 12.10
304B000P - S05 Inlet Pipe 5H45 500 07.00 12.10
DANDORI 2
13 PIPEMILL OD 48,6 07.00 14.40 7
14 QC
MTC PE ILC
113
CUTTING PIPE MC 1 1
CUTTING PIPE MC 2 1
CUTTING BRACKET 07.00 12.10 1
2 STAMP LINE D