SURAT PERINTAH LEMBUR

Date: Sabtu, 21 Oktober 2023

Plan Actual Start Finish

1 FWA 17410-BZA50 Pipe Exh Front D26A 200;200 07.00 12.10 7

17420-BZ010 Pipe Exh Center D26A 400 07.00 12.10 7

17430-BZ530 Pipe Exh Tail D26A 550 07.00 12.10 4

2 FWA 17420-VT020 Pipe Exh Tail 560B 130 07.00 12.10 3

3 FWA 20010W120P Pipe Exh Front RN 260 07.00 12.10 8

4 FWA 20050B000P Pipe Exh Center 5H45 168 07.00 12.10 5

20100B000P Pipe Exh Tail 5H45 140 07.00 12.10 4

5 FWA bracket 560;D26A;D03B 650;650 07.00 12.10 3

6 MAS 4 MAIN MUFFLER D26A 1008 07.00 14.40 12

7 SPIN 4-6-7 SM 338 (SPIN 4) -SM D26A

(SPIN 6-7) SUBMUFFLER 338; RN 120; 200 07.00 12.10 1

SPIN 5-8-16 CCO 560 (SPIN 16) - SM D26A

(SPIN 5-8) SUBMUFFLER; CCO 560; D26A 125; 200 07.00 12.10 1

SPIN 13-14-15 SM 560 (SPIN 13-14) - CCO 560

(SPIN 15) SUBMUFFLER; CCO 560B 125;125 07.00 12.10 1

SPIN 11-17-18 SM D03B (SPIN 11) - RN ANU

(SPIN 17/18) SUBMUFFLER; CCO D03B; RN 120;200 07.00 12.10 1

SPIN 9-10-12 SM 338 (SPIN 9) - RN ANU

(SPIN 10-12) SUBMUFFLER; CCO 338; RN 120;200 07.00 12.10 1

ROBOT WELD BZ220;220 CCO D26A 200;200 07.00 12.10 2

8 PLASMA 3 SM 560; SM 338 300; 100 07.00 12.10 1

PLASMA 4 SM D26A 400 07.00 12.10 1

TIG WELD BZ220 650 07.00 12.10 1

CUTTING 4L45V&RN ANU

SM D26A; SM 560

200;400

400;200 07.00 12.10 2

PRESS IN 2 CCO D26A 500 07.00 12.10 1

PRESS IN 3 CCO 560B 500 07.00 12.10 1

PRESS IN 5 RN ANU 500 07.00 12.10 1

SWA 560+D26A SM 560; SM D26A 600 07.00 12.10 5

ROOVING 560B; D03B 200 07.00 12.10 1

ROLL 4L45V&RN ANU

SM D26A; SM 560

500;800

800;500 07.00 12.10 2

9 BL03 Tail 2 D26A 940 07.00 12.10 1

BL07 Center 2 5H45 750 07.00 12.10 1

BL09 Center 2 BZ020 (1,0) D26A 300 07.00 12.10 1

BL11 Center 2 BZ010 (1,2) D26A 300 07.00 12.10 1

BL12 Front 2 D26A 750 07.00 12.10

BL13 Center 1 D26A 810 07.00 12.10

BL14 Inlet 5H45 940 07.00 12.10

BL15 Front 1 D26A 500 07.00 12.10

BL16 Center 1 D26A 500 07.00 12.10

BL17 Tail 1 560B 750 07.00 12.10

buffing

1. Front 1,2 D26A 2. Center 1, 2 D26A; D03B 3. Front 4, Tail 1 560B, Tail 1 D26A

07.00 12.10 3

cutitng & sizing

1. Center 2 D26A; Tail 2 D26A

2. Fr 2, 3 560, Tail 2 560 3. Tail 2 5H45

07.00 12.10 3

spot & drilling 1. Center 2, Front 2 D26A

2. Front 1 D26A 07.00 12.10 2

CUTTING/EXPAND/B UFFING

Shift 1

No. Line Part Number Part Name Type Qty Time

MP

1

1

1

Nomor Dokumen : KFN/FR/PPC/06/00 Tanggal Terbit : 21 Agustus 2017

Revisi : 00

Dept. : PPC

(2)

10 SUS 439 48,6 x 1,0 x 2464 Front 1 D26A 600 07.00 12.10

SUS 409 42,7 x 1,5 x 1180 Tail 2 BZ510 D40L 600 07.00 12.10

SUS 439 42,7 x 1,0 x 530 Front 2 D26A 600 07.00 12.10

SUS 439 42,7 x 1,0 x 2400 Center 1 D26A 600 07.00 12.10

CUTTING PIPE MC 3 SUS 409 48,6 x 2,0 x 2600 Front 4 560B 1200 07.00 12.10 1

SUS 439 10 x 1,2 x 80 F7561-BZ030-02 Support no 2 D26A 5000 SUS 439 10 x 1,2 x 173 F7561-BZ030-01 Support no 1 D26A 5000

11 BLANK N1 BZ270-S302 INNER PIPE D26A 10000 07.00 12.10

BLANK N2 17441-BZ200-H FLANGE N0 1 D26A 10000 07.00 12.10

12 STAMP LINE B F7562-BZ020-01 SUS

439 10*1,2*164 BRACKET N0 2 (164) D26A 2500 07.00 12.10 4

STAMP LINE O F7563-BZ090-01

SUS 439 10*1,2*103,5 ROD (103,5) D03B 3000 07.00 12.10 3

ME226468 Pipe TD Colt 200 07.00 12.10

304B000P - S05 Inlet Pipe 5H45 500 07.00 12.10

DANDORI 2

13 PIPEMILL OD 48,6 07.00 14.40 7

14 QC

MTC PE ILC

113

CUTTING PIPE MC 1 1

CUTTING PIPE MC 2 1

CUTTING BRACKET 07.00 12.10 1

2 STAMP LINE D

Diketahui Disetujui

H. Imam A.S. Siandi Yadi Jeanny

Dibuat

Referensi

Dokumen terkait

Demikian surat perintah kerja ini agar dilaksanakan dengan sebaik- baiknya.. Atas kerjasamanya kami ucapkan

Penggabungan data supplier (merger) perlu dilakukan apabila terdapat kemungkinan duplikasi pencatatan informasi pokok supplier yang telah dilakukan pembayaran, seperti

Sry Rahmawaty Unit kerja : Klinik Pratama Aksara SIP : 2694/2636/3.1/0707/06/2019 No.STR : 1221100118190365 Jabatan : Dokter umum Untuk melakukan kegiatan Penyuluhan di Klinik

Ibnu Saleh, M.M PEMERINTAH KABUPATEN BANGKA TENGAH DINAS KESEHATAN UNIT PELAKSANA TEKNIS DAERAH RUMAH SAKIT UMUM DAERAH Dr.. IBNU SALEH, MM Jalan Raya Sungkap, Desa Namang,

Berandan Barat Kode Pos 20857 SURAT PERINTAH TUGAS No.422.04 / / SP/ UKOM /VI/ 2023 Nama : SITI SAHARA, S.Pd Jabatan : Kepala Sekolah SDN 057231 Pipa Delapan Berdasarkan Surat

Tiba di : SDN Sekarjati 1 Tempat Kedudukan Pada tanggal : 6 Maret 2020 Telah diperiksa dengan keterangan bahwa Perjalanan tersebut atas perintahnya dan semata - mata untuk

PEMERINTAH KABUPATEN PANDEGLANG DINAS PENDIDIKAN KEPEMUDAAN DAN OLAHRAGA KOORDINATOR WILAYAH KECEMATAN CARITA SD NEGERI BANJARMASIN 2 NIS :100 280 NISS :101010206029 Alamat.Raya

Lintas Suka Damai-Simpang Abadi, Desa Sungai Keruh Kecamatan Tebing Tinggi Pos 36556 SURAT PERINTAH TUGAS Nomor: 421/022/SD-142/II/2024 Menindaklanjuti surat Kementerian