• Tidak ada hasil yang ditemukan

The surface irrigation projects enabled the farmers to bring additional area under irrigation and shift and expand the cropping pattern to remunerative wheat crop. In MP, additional irrigated area accrued during rabi season. This was devoted to wheat and the area under wheat in the sample farms increased from 2.14 acres in 2009-10 to 3.38 acres (57%) in 2012-13. In UP also the additional area was brought under wheat due to availability of irrigation facilities. The area under wheat in the sample farms increased from 1.95 acres in 2009-10 to 2.32 acres in 2012-13 (19% increase). Overall it can be concluded that the additional irrigated potential created by the surface irrigation projects has been fully devoted to cultivation of wheat crop in Bundelkhand region. As for productivity, the yield of wheat in the sample farms in MP increased from 886 kg per acre in 2009-10 to 1129 kg per acre in 2012-13, a 27% increase due to assured irrigation and adoption of HYV /improved varieties of seeds with appropriate package of practices. Similarly the yield of wheat

58

increased from 581 kg per acre to 789 kg per acre between 2009-10 and 2012-13 i.e., by 36%. At a macro level the total production of wheat would have increased by 91300 MT in MP and 69740 MT in UP aggregating all to 161000 MT in the region because of the package.

59

Table 28: Component wise physical progress under sample surface irrigation projects in Madhya Pradesh

Sl. No. Project Name Type of infrastructure Physical Quantity Stage of

completion (%) Stage of completion (%)

Target Unit Achievement

1 Mamon tank Length of main canal 4.86 KM 4.86 100 100

Length of subsidiary and

networks 12.57 KM 12.57 100 100

Length of irrigation canals lined under the package (meter)

2 Urmil r.b canal

project Length of main canal 30.09 KM 28.04 90 90

Length of subsidiary and networks

105.39 KM 47.12 45 45

Length of irrigation canals lined under the package (meter)

135.48 KM 75.08 55 55

3 Singhpur barrage project

Unit-i h/w cement : concrete and masonry

88.50 TH. CUM 61.50 70 70

length of main canal 22.68 KM 22.12 95 95

length of subsidiary and

networks 127.00 KM 30.00 20 20

length of irrigation canals lined under the package (km.)

149.68 KM 52.12 30 30

4 Rangawan

canal project Length of main canal 40.00 KM 33.55 84 84

Length of subsidiary and

networks 85.54 KM 58.54 68 68

Length of irrigation canals lined under the package (meter)

1255.40 METER 92090.00 73 73

60

Sl. No. Project Name Type of infrastructure Physical Quantity Stage of

completion (%) Stage of completion (%) 5 Bariyarpur left

bank canal project

Length of main canal 45.00 KM 49.00 100 100

Length of branch canal 30.00 KM 30.00 100 100

Length of subsidiary and

networks 412.00 KM 400.00 99 99

Length of irrigation canals lined under the package (meter)

49.00 KM 43.00 88 88

Length of irrigation canals lined under the package (meter)

30.00 KM 15.00 50 50

Length of irrigation canals lined under the package (meter)

412.00 KM 42.00 10 10

6 Narguwan tank

scheme Head works

Dam 1290.00 METER 967.50 75 75

w.w 30.00 METER 25.50 75 75

Length of main canal 8.00 KM 3.60 45 45

Length of subsidiary and networks

Length of irrigation canals lined under the package (meter)

7 Veer Sagar tank

scheme Head work

Construction of protection wall, and various repair work

420.00 METER 420.00 100 100

Resectioning of main canal

1400.00 METER 1400.00 100 100

Re-sectioning of branch & 1100.00 METER 1100.00 100 100

61

Sl. No. Project Name Type of infrastructure Physical Quantity Stage of

completion (%) Stage of completion (%) minor canals

8 Rongataghat stop dam cum causeway scheme

Head work

Concrete weir 153.00 METER 153.00 100 100

Weirs and cause way 153.00 METER 153.00 100 100

Length of left bank canal Length of right bank canal 9 Sarkanpur tank

scheme Head work

Repair of sluice 1.00 NO 1.00 100 100

RRR of canal 400.00 METER 400.00 100 100

New masonry canal 861.00 METER 861.00 100 100

10 Satighat tank

scheme Head work

Dam 630.00 METER 630.00 100 100

W.W 186.00 METER 186.00 100 100

Length of left bank canal 1400.00 METER 1400.00 100 100

Length of right bank canal 5500.00 METER 5500.00 100 100

11 Sakariya tank Length of main dam Length of main canal Length of subsidiary and networks

Length of irrigation canals lined under the package (meter)

12 Ken anicut Length of main weir 60.00 METER 60.00 100 100

Length of main canal Length of subsidiary and networks

62

Sl. No. Project Name Type of infrastructure Physical Quantity Stage of

completion (%) Stage of completion (%) Length of irrigation

canals lined under the package (meter)

13 Paharikheda

tank Length of main dam 1080.00 METER 1080.00 100 100

Length of main canal 4.50 KM 4.50 100 100

Length of subsidiary and networks

Length of irrigation canals lined under the package (meter)

14 Lipari tank Length of main dam 1650.00 METER 1650.00 100 100

Length of main canal 11.85 KM 11.50 98 98

Length of subsidiary and

networks 46.80 KM 44.46 95 95

Length of irrigation canals lined under the package (meter)

15 Amha tank Length of main dam 2305.00 METER

Length of main canal 1.05 KM 1.05 100 100

Length of subsidiary and networks

10.56 KM 10.56 100 100

Length of irrigation canals lined under the package (meter)

16 Karahi tank Length of main dam 540.00 METER 540.00 100 100

Length of main canal 2850.00 METER 2850.00 100 100

Length of subsidiary and

networks 11700.00 METER 11700.00 100 100

Length of irrigation 750.00 METER 750.00 100 100

63

Sl. No. Project Name Type of infrastructure Physical Quantity Stage of

completion (%) Stage of completion (%) canals lined under the

package (meter)cc channel

17 Rampura tank Length of main dam 675.00 METER 675.00 100 100

Length of main canal LBC 3000.00 METER 3000.00 100 100

Length of main canal RBC 3090.00 METER 3090.00 100 100

Length of subsidiary and networks

Length of irrigation canals lined under the package (meter)cc channel

600.00 METER 600.00 100 100

18 Samnapur tank

scheme Length of main canal 11310.00 METER 9600.00 85 85

Length of subsidiary and

networks 14770.00 METER 12000.00 81 81

Length of irrigation canals lined under the package (meter)

11310.00 METER 0.00 0

19 Bila feeder canal

Excavation of feeder canal 2194913.00 CUM 1872587.00 85 85

Head work & canal structures

42.00 NO 8.00 20 20

Length of main canal 25.83 KM 19.74 76 76

Length of subsidiary and

networks NIL NA

Length of irrigation canals lined under the package

NIL NA

20 Chanaua

bujugrg tank Length of main canal

(LBC) 1.95 KM 0.21 11 11

64

Sl. No. Project Name Type of infrastructure Physical Quantity Stage of

completion (%) Stage of completion (%) scheme Length of main canal

(RBC) 4.50 KM 1.05 23 23

Length of subsidiary and

networks (minor) 1.20 KM

Length of irrigation canals lined under the package (meter)

NO PROVISION NO PROVISION

21 Satdhara tank

scheme Head work

Dam 1290.00 METER 1290.00 100 100

w.w. 140.00 METER 140.00 100 100

Length of main canal 14940.00 METER 14400.00 96 96

Length of subsidiary and

networks 9800.00 METER 7000.00 72 72

Length of irrigation canals lined under the package (meter)

785.00 METER 785.00 100 100

22 Tikari tank

scheme Excavation of all type soil 323005.00 CUM 288174.00

Rock excavation 51732.00 CUM 46028.00

Earth work 661764.00 CUM 699429.00 98 98

Pitching 41264.00 CUM 41530.00

Boulder toe 21404.00 CUM 17494.00

Excavation of all type soil 255695.00 CUM 132218.00

Rock excavation 25037.00 CUM 10950.00

Cement concrete work 8074.00 CUM 2536.00 48 48

Cement concrete lining 3999.00 CUM 1098.00

Structures 77.00 NO 27.00

Length of main Canal (RBC & LBC)

16.50 KM

65

Sl. No. Project Name Type of infrastructure Physical Quantity Stage of

completion (%) Stage of completion (%) Length of minor canal

(RBC & LBC) 17.80 KM

Length of irrigation

canals lined under 14.90 KM

23 Gonchi tank length of main canal 2.88 KM 2.88 100 100

66

Table 29: Component wise physical progress under sample surface irrigation projects in Uttar Pradesh

SL Project name Type of infrastructure Unit Physical quantity Stage of

completion (%)

Target Achievement

1 Salarpur tank project Length of main dam KM 2.97 2.97 100

Quantity of de-silting from dam CUM 400000.00 400000.00 100

Length of main canal KM 10.68 10.68 100

2 Urmil dam project (left bank

canal) Length of irrigation canal lined under

the package in meters 5225 2350 45

3 Dashrapur tank project Tank (1) KM 1.50

Tank (2) KM 1.15

Tank (3) KM 1.50

Quantity of de-silting CUM 90000.00 100

Tank (1) KM 4.50

Tank (2) KM 3.60

Tank (3) KM 9.00

4 Jakhlaun Pump Canal

(renovation [c.c. Lining]) C.c. Lining of JPC. (in patches) form km.

4.000 to 34.300 13.770 13.770 100

Length of main canal in patches 13.770 13.770 100

Length of subsidiary and networks Length of irrigation canals lined under

the package (meter) 13.770 13.770 100

5 6 no bundhies (repair and restoration of[Kadaura])

Earth work 5320 4721 Completed

Pucca work NO 1.00 1.00 100

Length of main canal

Length of subsidiary and networks Length of irrigation canals lined under the package (meter)

67

SL Project name Type of infrastructure Unit Physical quantity Stage of

completion (%)

Target Achievement

6 Bundhies (repair and restoration of 6 no [kadaura])

Earth work 8605 7442 COMPLETED

Pucca work NO 1.00 1.00 100

Length of main canal

Length of subsidiary and networks Length of irrigation canals lined under the package (meter)

7 Pachwara lake (capacity

restoration modernization ) Restoration of pachwara lake in district

Jhansi Cum 49140.00 49140.00 100

Length of main canal

Length of subsidiary and networks Length of irrigation canals lined under the package (meter)

8 Pachwara main canal

(restoration & lining ) Cement concrete lining (1:2:4 mix & 60 mm thick)

Length of main canal

Length of subsidiary and networks Length of irrigation canals lined under the package (meter)

9 Kakarwara main canal

(restoration and lining) Cement concrete lining (1:2:4 mix & 60 mm thick)

Length of main canal KM 6.20

Length of subsidiary and networks Length of irrigation canals lined under the package (meter)

10 Arjar tank (capacity restoration/modernization )

Restoration/modernization of Arjar tank in district Jhansi

68

SL Project name Type of infrastructure Unit Physical quantity Stage of

completion (%)

Target Achievement

Length of main canal

Length of subsidiary and networks Length of irrigation canals lined under the package (meter)

11 Pt. Deendayal upadhyay pathrai dam (modernisation, restoration and lining of the canal )

Canal service road KM 9.50 9.50 KM 100

Restoration canal section KM 2.00 2.00 KM 100

Pucca work on canal NO 29.00 29 NOS 100

Dam work JOB 1.00 1 JOB 100

Length of main canal

Length of subsidiary and networks Length of irrigation canals lined under the package (meter)

KM 3.75 3.75 KM 100

12 Arjar main canal((restoration

and lining) Cement concrete lining (1:2:4 mix of 60 mm thick)

Length of main canal

Length of subsidiary and networks Length of irrigation canals lined under the package (meter)

13 In Barwar main canal (restoration and construction of c.c. Lining-0.0000 to 30.880)

Restoration and const of c.c. Lining in

Barwar main canal KM 13.25 10.00 75

Length of main canal KM 30.88

Length of subsidiary and networks KM 22.86 Length of irrigation canals lined under

the package (meter)

KM 13.25

14 Burdha dam & canal system Restoration of embankment of ram KM 2.78 2.78 100

Restoration of canals KM 8.15 8.15 100

69

SL Project name Type of infrastructure Unit Physical quantity Stage of

completion (%)

Target Achievement

15 Jaywanti tank (restoration) Restoration of Jaywanti KM 3.40 3.40 100

16 Kuthond branch (restoration of lining)

C.c. Lining KM 20.40 8.00 40

Construction of bridge NO 2.00 2.00 100

Repair of bridge NO 13.00 13.00 100

Repair of heads of meter NO 9.00 9.00 100

Restoration of canal KM 107.22 107.22 100

Construction of retaining works M 1205.00 345.00

Restoration of canal KM 185.37 169.50

Length of main canal KM 105.21

Length of subsidiary and networks KM 861.94 Length of irrigation canals lined under

the package (meter) KM 20.40

17 Maudaha main canal (c-c

lining & restoring section) Earth work LAC CUM 2.06 1.40

C-c lining of canal LAC CUM 0.24 0.15

Length of main canal

Length of subsidiary and networks Length of irrigation canals lined under the package (meter)

12000 5000

70

Chapter 4 Watershed Management