236
AN ANALYTICAL STUDY BASED ON QUALITY MANAGEMENT SYSTEM FOR
UPGRADING THE PAVEMENTS: A REVIEW Saddam Hussain
Research Scholar, Rajiv Gandhi Proudyogiki Vishwavidalaya Bhopal (M.P.) Prof. Rajesh Joshi
Rajiv Gandhi Proudyogiki Vishwavidalaya Bhopal (M.P.)
Abstract - In the present electronic age, the development of the country is going at a very fast pace. An efficient transport system is a pre-requisite for sustainable economic development of a country. The highways play an important role in the development of a country and also improve the living standard of the people. The road development programmes envisaged for the country involve large amount of money, manpower, materials and machinery not only for the construction of new roads, but also for the improvement of the existing road network. Road transport is the most widely used system of transportation. This mode of transportation carries 85% of the passenger traffic and 70% of the freight traffic. So, in addition to the wide and efficient road network, the quality of the roads should be as per the best available standards.
Presently there is no system to monitor and assure the quality and quantity of the work. The machinery used for the construction of a highway does not have any check on the various ingredients of the material used and thus the quality and quantity of the product are not assured. The highway construction materials are carried through tippers, trucks etc. But there is no system available to monitor an Engineer, to check the fuel consumption of the vehicles, theft of fuel, if any, unnecessary halt of the vehicles which leads to delay in the completion of a project. With the availability of sophisticated plants and equipments, the pace of construction of highways has increased manifolds. The present system of quality control is time consuming and has become a major hurdle in the high speed of construction. The existing tolerance limits have also been kept keeping in view the use of conventional machinery and prevailing quality control system which permits higher range of variations for acceptance and needs to be relooked. So, keeping in view the requirements of time, an equality control system has been developed which assures that full material as per desired standards is used and thus gives a confidence for quality assurance of the product. For a better control on the quality, the machinery used for construction of the highways has been updated so that it can have an automatic check on the quality of the product.
Keywords: Electronic Sensor, e-Control, Flexible, Global Positioning System, Roughness, Vehicle Tracking System.
1 GENERAL INTRODUCTION ON PAVEMENT CONSTRUCTION
The improvement all through the world is going at an extremely quick speed. An effective vehicle framework is a pre- imperative for the supportable improvement of a nation and clearly expressways assume a vital part in the expedient and financial development of a country which thus works on the expectation for everyday comforts of individuals. The monetary development of USA is 1.6%, UK is 1.1%, France is 1.7%, Canada is 2.2%, Japan is (- ) 0.6% and India is 5.5%. Indeed, even inside India, the states, where the state of streets is great, have better development in contrast with different conditions of the country.
The high development of vehicles
has additionally expanded the interest of
protected, wide and great nature of
streets. There is consistently a rising
interest for better streets that guarantee
protected and fast development for the
street clients. With the utilization of
current hardware, the speed of
development has expanded manifolds and
there is meaningful improvement in the
nature of streets. By and by there could
be no legitimate framework for observing
the quality and amount in the
development of the roadways. Still the
well established quality control measures
are being taken on which don't coordinate
with the current speed of development. To
237
stay up with the fast of development, the
deep rooted quality control strategies should be assessed and subbed with current techniques for quality control and quality confirmation. Perhaps the biggest failure in many industrialized as well as in non-industrial nations is the disintegration of transport frameworks, brought about by lacking upkeep. The financial pace of return for street projects adds up to 40% for street support, 20%
for recovery and just 10% for new development. In the event that public assets are spent on ventures for new foundation projects, enormous scope dis- economies are created. Street conditions rely upon its fundamental development and support.
1.1 Quality Control in the Construction of Flexible Pavements
Quality control in the adaptable asphalt development implies the functional strategy to control the different exercises used to satisfy the necessities of nature of an adaptable asphalt. The quality control includes the acknowledgment measures which incorporates the tests, recurrence of testing, resilience limits, basic assessment of the work by chosen tests to decide its adjustment to the details and move initiated to guarantee quality. So it is totally the highlights and the qualities of an item or administration that bear on its capacity to fulfill the given requirement for a quality and proficiency of an asphalt.
In the current age, everybody needs to go on the streets that have fantastic riding quality. The current guidelines of riding quality have been fixed remembering the ordinary utilization of apparatus and old arrangement of development of expressways. Presently a days, the cutting edge types of gear are utilized which consequently control the different elements of the item and really take a look at the nature of item. If there should arise an occurrence of the thruways where e-quality control framework is utilized in which every single movement of development is electronically controlled, the old norms of riding quality likewise should be relooked and new better principles ought to be fixed to give a superior solace to the street clients.
2 SCOPE AND OBJECTIVES OF STUDY With the quick advancement of the country, the development of Highways has expanded manifolds in the country.
The roadways assume a crucial part in the monetary improvement of a country.
Notwithstanding the wide and effective street organization, the nature of the streets ought to be according to the most ideal that anyone could hope to find principles. In this electronic time, with the utilization of new advancements the riding nature of streets is working on step by step, however there is no device accessible to an Engineer that can give affirmation that full amount of materials has been utilized adjusting to the particulars. By and by, the quality control tests are being directed actually in the field in three styles and steps. During execution, the worker for hire sets up a field lab according to the compulsory state of the understanding and completes all the quality control tests as per the prerequisite of his arrangement. To affirm the information/consequences of the said project worker, the quality control tests are once more directed by the Government Engineer or field staff who is sent for the execution of the said work lastly it is re-affirmed by the quality control division as an outsider. As there is exceptionally enormous number of tests, it requires a great deal of investment in getting good endorsements from all.
Indeed, even in the wake of undertaking all actions, there is no secure technique to make sure that full amount of material has been utilized at the site according to the ideal principles. Consequently, there is an extraordinary issue to a Civil Engineer during the development of a roadway asphalt.
3 QUALITY CONTROL
The street advancement programs
conceived for the nation include
enormous measure of cash, labor supply,
materials and hardware for the
development of new streets, however for
the improvement in the current street
network moreover. Street transport is the
most broadly utilized arrangement of
transportation. George et al., 1989
suggested that the peformance is a wide,
general term portraying how asphalt
condition changes or how asphalt
238
structures serve their planned capacities
with gathering use[31]. AASHTO (2003) characterizes the asphalt execution as the capacity of an asphalt to sufficiently serve traffic over the long run [1].
Service of Road Transport and Highways, Govt. of India distributed the details for streets and extension works first and foremost in the year 1973. A point by point part on quality control for street works has been given wherein the recurrence of the tests to be led for the acknowledgment of the material has been distinct for every class of the material.
The subsequent update was made in 1988, third in 1995, fourth in 2001 and in conclusion in 2013.
Before the 1970s, strategy determinations were utilized in most thruway activities to characterize the quality that the parkway offices anticipate from project workers. While utilizing determinations, the roadway organization explains what is to be constructed and the way things are to be finished. As was referenced in the AASHTO Road Test, the Transportation Research Board (TRB) in 1976 and Rillet in 1998 likewise reasoned that the utilization of determinations don't guarantee that the asphalt would perform and endure true. Also Miller- Warden Associates in 1965 and Rilett in 1998 further presumed that the acknowledgment technique depends on designing judgment which is emphatically founded on previous experience, and assuming the factors are obscure to the particulars under new circumstances, the final product may not be agreeable.
3.1 Riding Quality in Highways
Consistently expanding street harshness brings about fast asphalt crumbling in light of expanded beating activity of weighty burdens. Accordingly, it influences the speed of vehicles, security and solace of travelers and furthermore the surface waste qualities of the asphalt surface. Among the different instruments, Towed Fifth Wheel Bump Integrator (TFWBI) is the most well known hardware being utilized by a few emerging nations since it is reasonable, straightforward and furthermore needs less regular support and adjustment.
Sayers et al. (1986) related the lopsidedness records acquired from the
fifth wheel knock integrator running at various rates like 20, 32 and 50 km/h with those got from other unpleasantness estimating gear. They reasoned that the speed and unpleasantness were conversely corresponding to one another.
Bennet (1996) has likewise shown this reality with graphical induction [9].
Jordan and Young (1980) fostered the condition for laying out the unpleasantness values expected under standard circumstances as an element of harshness saw at various velocities.
In the last part of the 1950s, frameworks of genuine estimation, (for example, harshness meters, redirection and slide test gear) started to give the idea that could evaluate an asphalt's condition and execution. These frameworks, alongside visual misery reviews were utilized to help upkeep and recovery choices, which, over the course of the years have been refined and moved up to give a fast, objective method for support the board (Hicks and Mahoney, 1981).
Arunachalam (1971) completed an examination of broad field examination information for assessing reinforcing prerequisites both by California Bearing Ratio test values and furthermore utilizing Benkelman bar bounce back avoidance strategies. The examination shows that the redirection strategy gives reasonable outcomes in consonance with asphalt execution and is more dependable than CBR technique [4].
3.2 Use of Electronics for Quality Control
It was seen that separated from detecting
setting at work destinations a need exists
to screen hardware and machine
development to more readily comprehend
bottlenecks in building site processes
[52]. Also, Leite (2009) calls attention to
that gaining from the work process of
exercises during a crisis reaction for one
more crisis circumstance in a similar
grounds office all the more productively
[141]. An infrared (IR) based framework
required clear view for limitation and has
a restricted scope of roughly 6 m. Infrared
innovation gives room-level limitation
precision, however this innovation
endures impedance within the sight of
daylight [57].
239
Radio Frequency Identification
(RFID) innovation has been utilized in indoor confinement frameworks. Analysts have detailed their correctnesses to be around 5-9 m with more noteworthy than 95% certainty [57]. Sound recurrence based innovations, like a ultrasound framework, have a revealed exactness of roughly 9 cm for 95% accuracy [57] took an outline of uses of field information catch advancements in development and office tasks. It remembered conversation for advances for detecting substances and peculiarities that are important for development and office activities, for detecting setting encompassing these tasks, and for checking work process in these activities. Observing of field faculty can further develop security guidelines at locales and furthermore feature any wasteful cycles that are essential for an activity.
Development engineers, who are outwardly noticing building locales, physically input the gathered data into Personal Digital Assistants (PDA) gadgets (Navarrete 1999). The data is then transferred to the primary server of the on location office either by direct wire association or by a remote neighborhood (WLAN) association (Ward et al. 2003).
Along these lines, the data is divided between different gatherings engaged with the task. Close Circuit TV (CCTV) considers remote checking of the building site (Leung et al. 2008). The zoom and rotational capacities of CCTV cameras empower the inclusion of a wide locale.
Albeit the two advances have altogether further developed the customary development the executives interaction, their inadequacies are obvious. The utilization of a PDA requires development specialists to be nearby so they can physically enter the development related data. CCTV is delivered futile when the view of a camera is hindered.
3.3 Vehicle Tracking System
The recognition of vehicles has been getting consideration in the PC vision local area since vehicles are a particularly huge piece of our life. C. Papageorgiou and Poggio introduced an overall strategy for object location applied to vehicle recognition. A. Rajagopalan et al.
displayed the circulation of vehicle
pictures by learning higher request insights. Preparing information tests of vehicles are bunched and the factual boundaries relating to each group are assessed. H. Schneiderman and Kanade adopted a view-based strategy. They assembled one individual finder for every one of the coarsely quantized perspectives. Then, at that point, they utilized the histograms of some observationally picked wavelet highlights and their relative areas to demonstrate the vehicle and non-vehicle appropriation accepting the histograms are measurably autonomous.
Vehicle recognition in aeronautical pictures is somewhat obliged by the perspective and the goal. In crafted by P.
Burlina et al. what's more, Moon et al., a vehicle is demonstrated as a square shape of a scope of sizes. A Canny-like edge identifier is applied and GHT (Generalized Hough Transform) or convolution with edge covers are utilized to separate the four sides of the rectangular limit. T. Zhao et al. introduced a framework to distinguish traveler vehicles in ethereal pictures along the street bearings. They began from mental tests to track down significant highlights for human location of vehicles. In light of these perceptions, they chose the limit of the vehicle body, the limit of the front windshield, and the shadow as the elements.
3.4 Machinery for Highway Construction
Beforehand the streets were developed physically and with typical blending of materials. Presently adays current hardware is accessible for the development of expressways, for example, hot blend plants, wet blend plant, paver finisher, cone smasher and rollers and so on.
Hot blend black-top (HMA)
clearing materials are a combination of
size-evaluated, excellent total and fluid
black-top concrete, which is warmed and
blended in estimated amounts to create
HMA. Hot blend black-top clearing
materials can be fabricated by: (1) clump
blend plants, (2) persistent blend (blend
outside dryer drum) plants, (3) equal
stream drum blend plants, and (4)
counter stream drum blend plants. This
request for posting for the most part
240
mirrors the sequential request of
advancement and use inside the HMA business. In 1996, approx. 500 million tons of HMA were delivered at 3600 (assessed) dynamic black-top plants in the United States. Of these 3600 plants, roughly 2300 are bunch plants, 1000 are equal stream drum blend plants, and 300 are counter stream drum blend plants.
The absolute 1996 HMA creation from cluster and drum blend plants is assessed at around 240 million tons and 260 million tons individually. Around 85% of plants being produced today are of the counter stream drum blend plan, while cluster plants and equal stream drum blend plants represent 10% and 5 percent separately. Constant blend plants address a tiny part of the plants being used (0.5 percent) and, in this manner, are not examined further.
Table No. 3.1 (Technical Specifications of Wet Mix Plant)
3.5 Motivation
During the writing audit it has been found that not much exploration has been done on the e-quality control framework in the adaptable asphalts and it has been completed by ordinary method of actual testing. In any case, every one of the instruments used to control the quality are accessible on the lookout. The exploration has previously been completed for the advancement of such electronic instrument with the end goal of a few unique utilizations. As of now, suitable quality control measures are being practiced on every one of the materials utilized by embracing every one of the methodology endorsed in the codes and works are executed as needs be. It would be advantageous to specify here that adequate measure of data is accessible on factual strategies yet to the extent that known, practically little text
reference is accessible on e-quality control framework.
In the current situation when speed of expressway development has expanded complex and the materials utilized in the development are for the most part exceptionally enormous in amounts, guaranteeing the quality and amount of the work is undeniably challenging. Further, the quantum of testing expected during development is exceptionally enormous which is undeniably challenging to accomplish in pace with the rapid of development. It turns out to be further troublesome when the project worker neglects to draw in essential staff for the quality control tests or on the other hand on the off chance that connected with they don't check out the quality control tests. In some cases the greater part of the tests are not directed at the site and just false sections are made in the recommended registers.
The circumstance further deteriorates when the Govt. official staff sent to screen the said work likewise stirs up with the authoritative organization and eventually unsatisfactory work is executed and the authority acknowledges it moreover. It frequently presents issue to handle Engineers to control the quality in the development of roadways.
But on enormous size projects, the bituminous work is being completed with typical pavers subsequent to blending in with ordinary plants in most extreme rustic or little city streets. Once in a while, the premix cover is likewise being done with physical work. For the tack coat, the bitumen is in some cases warmed at the site in the drums. Thus, in this way there is a ton of wastage of bitumen during the execution of the work.
Keeping in view these variables, as far as possible in the determinations for the bituminous work were kept as ± 0.3%.
Presently a-days, when the cutting edge hardware is utilized for the development of expressways which is electronically controlled, these cutoff points are a lot of on the higher side and are being abused.
4 CONCLUSION
Accomplishing quality in adaptable
asphalts through e-control is a compelling
strategy for guaranteeing quality and
amount of work. This framework
241
guarantees that even after the blending of
the authority field staff with the legally binding organization, there can be no pilferage of material. Clump blend type completely mechanized PC controlled Hot Mix Plants with electronic sensor control the quality and the consistency of the completed item. The other hardware as utilized with electronic sensors additionally control the quality naturally.
The model for e-quality control framework took on at the different phases of the development guarantees the quality and the amount of the materials utilized. The model for prudent and proficient utilization of vehicles through e-control has investigated the idea of utilizing VTS with fuel sensors, GPS and so on in the development of a parkway project. This e- control framework can assume a significant part in limiting the expense of undertaking. It is likewise very productive to check the distance went by the vehicle in a day, working long stretches of vehicles/day, stop long periods of vehicles/day, inactive long periods of vehicles/day and the speed of the vehicles and so forth. The utilization of refreshed hardware for observing of value and amount of an asphalt has investigated the idea of purpose of hardware with electronic sensors in the development of an asphalt for a superior control on its quality and amount. With its utilization, the different elements of the materials utilized in the development of an asphalt can be controlled inside the predefined range as determined in the standard codes of asphalt. Furthermore, the utilization of in-constructed camera in the gear empowered with GPS instrument likewise plays an extraordinary part in setting live information of every single action of hardware on the site for future record.
5 FUTURE SCOPE OF THE WORK
The postulation opens a future extent of work for the followings:
(i) The present exploration has been completed exclusively for the adaptable asphalts. The extent of examination ought to be additionally stretched out and investigate should be done on unbending asphalts moreover.
(ii) E-quality control framework ought to be created to be utilized in the development of extensions, flyovers, trumpet intersections, burrows and so forth.
(iii) As with the utilization of e-quality control framework the quality and the amount is guaranteed, so the future exploration ought to be done to reexamine the plan of the adaptable asphalts as well as of the unbending asphalts.
(iv) Future exploration ought to be done to investigate the utilization of level of bitumen contents in the adaptable asphalts likewise with full affirmation of amounts of material, bitumen can be saved which will be in the public/global premium.
(v) The research should be additionally stretched out for all the structure works including multistory structures, rail route projects, dams, weirs and any remaining structural designing ventures and so on.
REFERENCES
1. AASHTO (1993), “Guide for Design of Pavement Structures”, American Association of State Highway and Transportation Officials.
2. Anglade, Joseph Yves (1998), “Development of Methodology for Highway Agencies to Follow in Establishing Optimum Acceptance Plans for Pavements”; Doctoral Dissertation, University of Florida, Gainesville, Florida.
3. Anjanevulu M.V.L.R. and Nagaraj B.N. (March 2009), “Paper No. 549 Modelling Congestion on Urban Roads Using Speed Profile Data”;
Journal of the Indian Roads Congress.
4. Arunchalam, K. (1961), “Evaluating Strengthening Requirements of Flexible Pavement by Deflection Method”, Journal of the Indian Roads Congress, Vol. 1, pp. 111- 129.
5. Avely RP, Wang Y., and Rutherford GS (2004),
"Length-Based Vehicle Classification Using Images from Uncalibrated Video Cameras," in Proceedings of intelligent Transportation Systems Conference.
6. Aworemi, Remi Joshua, Akintola Ladoke, Abdul-Azeez, Adegoke Ibraheem, Akintola A.
J, Ladoke, Adewoye, Oyerinde Jonathan, Akintola Ladoke (2009), “A Study of the Causes, Effects and Ameliorative Measures of Road Traffic Congestion in Lagos Metropolis”;
European Journal of Social Sciences – Volume 11, Number 1.
7. Baldwin, A.N., Thorpe, A., and Alkaabi, J.A.
(1994). “Improved Materials Management through Bar-coding: Results and Implications from a Feasibility Study.” Proc., ICE, 102 (4), pp. 156-162.
242 8. Belotte Jean Yves, “Design and Safety aspects
of Expressways”; International Seminar on Design and Safety by Indian Roads Congress.
9. Bennert, T., Maher, A. and Marukic, I. (2003),
“Characterization of NJ HMA – Part I”, Report No. FHWA-NJ-2002-027, New Jersey Department of Transportation, USA.
10. Beymer D., Lauchlan P. Mc, Coifman B., and Malik J. (1997), “A Real Time Computer Vision System for Measuring Traffic Parameters” in Proceedings of Conference on Computer Vision and Pattern Recognition, pp.
495–501.
11. B. Hudson S., Higgins F. T., and Bowery F. J.
(1972), “Determination of Statistical Parameters for Bituminous Concrete”, Pennsylvania Department of Transportation, Harrisburg, PA.
12. Bhatnagar SK, “Project Implementation”;
International Seminar on Construction Management of Expressway by Indian Roads Congress.
13. Bittner Robert B. and Schmitt Robert L.
(October 2011), “Construction Engineering Process and Knowledge Requirements for Forestering Creative Design Solutions on Infrastructure Projects”; Journal of Construction Engineering and Management
©ASCE.
14. Bohn Jeffrey S. and Teizer Jochen (June 2010), “Benefits and Barriers of Construction Project Monitoring Using High-Resolution Automated Cameras”; Journal of Construction Engg. And Management by ASCE, Vol. 136, No.6, ISSN 0733-9364 CODEN: JCEMD4.
15. Brilakis, I. (2007), “Long Distance Wireless Networking for Site – Office Data Communications.” J. Inf. Tech. Constr., 12, pp. 151-164.
16. Briscoe, G., and Dainty, A. (2005)
“Construction Supply Chain Integration”, Int.
J., pp. 319-326.
17. Bowker, H. Albert, and Goode Henry P.
(1952), “Sampling Inspection by Variables.
McGraw-Hill, Inc., New York”.
18. Burati, J.L., Matthews, M.F., and Kalidindi, S.N. (1992), “Quality Management Organizations and Techniques”; J. Constr.
Engg. Mgmt., ASCE, 118(1), pp. 112-128.
19. Burgi, C., and Garrett, J.H., Jr. (2002),
“Wearable Computers: An Interface between Humans and Smart Infrastructure Systems”, Bauenmit Computer, Bonn, Germany.
20. Burlina P., Parameswaran V. and Chellappa R. (1997), “Sensitivity Analysis and Learning Strategies for Context-Based Vehicle Detection Algorithms,” in roceedings of DARPA Image Understanding Workshop, pp.
577-584.
21. Caron, F., et al. (2007). “Locating Sensor Nodes on Construction Projects.” Auton.
Robot., 22(3), pp. 255-263.
22. Chachich, Pau A. A., Barber A., Kennedy K., Oleiniczak E., Hackney J., Q. Sun, Mireles E.
(1997), "Traffic Sensor Using a Color Vision Method” in Proceedings of the International Society for Optical Engineering, 2902: pp.
156-164.
23. Chang, Luh-Maan, and Hsie Machine (1995).
“Developing Acceptance-Sampling Methods
for Quality Construction Journal of Construction Engineering and Management”, Vol. 121, No. 2, pp. 246-253.
24. Chin S., Yoon S, Choi C, and Cho C (2008),
“RFID 4D CAD for Progress Management of Structural Steel Works in High-rise Buildings.”
25. Chunrui Z. and Siyal M.Y. (2000), "A New Segmentation Technique for Classification of Moving Vehicles," in Proceedings of Vehicular Technology Conference, pp. 323-326.
26. Chem Quan, Reichard Georg and Beliveau Yuan (February 2010), “Object Model Framework for Interface Modeling and IT Oriented Interface Management”; Journal of Construction Engg. and Management by ASCE
27. Colliver PG; “Organizational and Quality Control Aspects”; International Seminar on Construction Management of Expressway by Indian Roads Congress.
28. Coifman B., Beymer D., McLauchlan P., and Malik J. (1998), “Areal-time Computer Vision System for Vehicle Tracking and Traffic Surveillance,” in Transportation Research C, 6(4), pp. 271–288.
29. Comnor O J.T., Larimor M.A., and Tucker R.L. (1986), “Collecting Constructability Improvement Ideas.”, J.Constrn. Engg.
Mgmt., ASCE,112(4), pp. 463-475.
30. Cox A., Ireland, P. and Townsend M. (2006),
“Managing in Construction Supply Chains and Markets”, Thomas Telford, London.
31. Creedy Garry D, Skitmore Martin and Wong Johnny KW (May 2010), “Evaluation of Risk Factors Leading to Cost Overrun in Delivery of Highway Construction Projects”; Journal of Construction Engg. and Management by ASCE, Vol. 136, No.5, ISSN 0733-9364 CODEN: JCEMD4.
32. Daily D., Cathy F.W., and Pumrin S. (2000),
“An algorithm to Estimate Mean Traffic Speed Using Uncalibrated Cameras” In Conference for Intelligent Transportation Systems, pp.
98-107.
33. Dhir Dr. MP (August 1994) “Binders”;
Seminar on Bituminous Roads: Design and Constn. Aspects by Indian Roads Congress.
34. Drain, David (1996), “Statistical Methods for Industrial Process Control”; Chapman and Hall, New York.
35. Ergen E, Akinci B, and Sacks R. (2008). “Life- Cycle Data Management of Engineered-to- Order Components Using Radio Frequency Identification” Adv. Eng. Inf., 21(4), pp. 356- 366.
36. Fan T.J., Medioni G., and Nevatia G. (1989),
“Recognizing 3D Objects Using Surface Descriptions,” in IEEE Transactions on Pattern Analysis and Machine Intelligence, 11:pp. 1140–1157.
37. Federal Highway Administration (FHWA) (1977), “Highway Condition and Quality of Highway Construction Survey Report”, U.S.
DOT, Washington, DC.
38. Ferryman J.M., Worrall A. D., and Maybank S. J. (1998), "Learning Enhanced 3D Models for Vehicle Tracking," in British Machine Vision Conference, pp. 873–882.
243 39. Florida Department of Transportation (FDOT)
(1982), “Standard Specifications for Road and Bridge Construction”, Tallahassee, FL.
40. Florida Department of Transportation (FDOT) (1991), “Standard Specifications for Road and Bridge Construction”, Tallahassee, FL.
41. Florida Department of Transportation (FDOT) (1999), “Standard Specifications for Road and Bridge Construction”, Tallahassee, FL.
42. Ford David N., Anderson Stuart D., Casas Andrew J. Damron Rodrigo de Las, Gokmen Nevzat and Kuennen Steven T. (Jan/Feb 2004), “Managing Constructability Reviews to Reduce Highway Project Durations”; Journal of Construction Engineering and Management
© ASCE.
43. Ganesh K., Jagadeesu H.S. and Sathyamurty R. (January-June 2010), “Design of Automatic Immersion Wheel Tracking Equipment to Measure the Rutting Characteristics of Bituminous Mixes with Plain and Modified Binders”; Highway Research Journal.
44. Goodrum Paul M, Haas Carl T, Caldas Carlos, Zhal Dong, Yeiser Jordan and Homm Daniel (Sep 2011), “Model to Predict the Impact of a Technology on Construction Productivity”;
Journal of Construction Engg. and Management by ASCE, Vol. 137, No.9, ISSN 0733-9364 CODEN: JCEMD4.
45. GH Johnston; “Expressway Planning the Canadian Experience”; International Seminar on Expressways by Indian Roads Congress.
46. Goodrum, P.M., Mc Laren, M.A., and Durfee, A. (2006), “The Application of Active Radio Frequency Technology for Tool Tracking on Construction Job Sites.” Autom. Constr., 15 (3), pp. 292-302.
47. Guidelines for Expressways by Ministry of Road Transport and Highways (Volume – I to Volume-IV).
48. Gupta Ankit, Kumar Praveen and Rastogi Rajat (March 2012), “A Critical Review of Flexible Pavement Performance Models Developed for Indian Perspective”; Indian Highways.
49. Gupta Shivangi and Veeraragavan A. (March 2009), “Fatigue Behaviour of Polymer Modified Bituminous Concrete Mixtures”;
Paper No.548, Journal of the Indian Roads Congress.
50. Gupte S., Masoud O., Martin R. F. K., and Papanikolopoulos N. P. (2002), “Detection and Classification of Vehicles,” in IEEE Transactions on Intelligent Transportation Systems, 3(1), pp. 37-47.
51. Hannon, J.J. (2007). “Emerging Technologies for Construction Delivery.” NCHRP Synthesis 371, National Cooperative Highway Research Program of the Transportation Research Board, Washington, DC.
52. Haas, C.T. (2006), “A Model for Data Fusion in Civil Engineering.” 13th EG-ICE Workshop 2006, Lecture Notes in Computer Science, Springer Ascona, Switzerland.
53. Haag M. and Nagel H. (1999), "Combination of Edge Element and Optical Flow Estimate for 3D Model-Based Vehicle Tracking in Traffic Image Sequences," in International Journal of Computer Vision, 35(3): pp. 295–
319.
54. Haycraft William R., Caterpillar, (October 2011), “History of Construction Equipment”;
Journal of Construction Engineering and Management ©ASCE
55. Hedgepeth, W.O. (2007). RFID metrics,
“Decision Making Tools for Toddy’s Supply Chains”, Taylor and Francis, Boca Raton, FL.
56. Hildreth, JC (2003). “The Use of Short- Interval GPS Data in Construction Operations Analysis.” PhD dissertation, Virginia Polytechnica Institute and State Univ., Blacksburg, VA.
57. Hightower, J., and Borriello, G. (2001).
“Location Systems for Ubiquitous Computing.” Computer, 34 (8), pp. 57-66.
58. Hsieh J., Chen S. Yu, Y., and Hu W. (2006),
"Automatic Traffic Surveillance System for Vehicle Tracking and Classification," in Transactions on Intelligent Transportation Systems, 7(2); pp. 175-187.
59. Huang Yang H., “Pavement Analysis and Design”
60. Huang C. and Liao W. (2004), "A Vision- Based Vehicle Identification System” in Proceedings Conference on Pattern Recognition, 4: pp. 364-367.
61. Hughes, Charles S. (1996), “Synthesis of Highway Practice 232 – Variability in Highway Pavement Construction”, National Academy Press, Washington, DC.
62. IRC: 25-1967; Type Designs for Boundary Stones
63. IRC: 26-1967; Type Designs for 200-Meter Stones
64. IRC:17-1966; “Tentative Specifications for Single Coat Bituminous Surface (Amalgamated with IRC-110-2005)”.
65. IRC:23-1966, “Tentative Specifications for Two Coat Bituminous Surface Dressing (Amalgamated with IRC-110-2005)”.
66. IRC:28-1967, “Tentative Specifications for the Construction of Stabilised Soil Roads with Soft Aggregate in Areas of Moderate and High Rainfall”.
67. IRC:27-1967, “Tentative Specifications for Bituminous Macadam (Base and Binder Course)”.
68. IRC:47-1972, “Tentative Specification for Built-up Spray Grout”.
69. IRC:81-1997, “Tentative Guidelines for Strengthening of Flexible Road Pavements using Benkelman Beam Deflection Technique (First Revision)”.
70. IRC:29-1988; “Specification for Bituminous Concrete (Asphaltic Concrete) for Road Pavement (First Revision) (Amalgamated with IRC:111-2009)”.
71. IRC:19-2005; “Standard Specification and Code of Practice for Water Bound Macadam (Third Revision)”.
72. IRC:16-1989; “Standard Specification for Priming of Base Course with Bituminous Primers (First Revision)”.
73. IRC:19-2005; “Standard Specifications and Code of Practice of Water Bound Macadam (Third Revision)”.
74. IRC:95-1987; “Standard Specification for Semi-Dense Bituminous Concrete”.
75. IRC:110-2005; “Standard Specifications and Code of Practice for Design and Construction of Surface Dressing”.
244 76. IRC:5-1998; “Standard Specifications and
Code of Practice for Road Bridges, Section-I – General Features of Design (Seventh Revision)”.
77. IRC:6-2000; “Standard Specifications and Code of Practice for Road Bridges, Section-II – Loads and Stresses (Fourth Revision)”.
78. IRC:15-2002; “Standard Specifications and Code of Practice for Construction of Concrete Roads (Third Revision)”.
79. IRC:30-1968; “Standard Letters and Numerals of Different Heights for Use on Highway Signs”.
80. IRC:2-1968; “Road Marker Signs for National Highways (First Revision)”.
81. IRC:31-1969; “Route Marker Signs for State Routes”.
82. IRC:14-2004; “Recommended Practice for Open Graded Premix Carpet (Third Revision)”.
83. IRC:20-1966; “Recommended Practice for Bituminous Penetration Macadam (Full Grout)”.
84. IRC:55-1974; “Recommended Practice for Sand-Bitumen Base Courses”.
85. IRC:SP:22-1980; “Recommendation for the Sizes for each Type of Road Making Machinery to cater to the General Demand of Road Works”.
86. IRC:SP:73-2007, “Manual of Standards and Specifications for Two Laning of State Highways on B.O.T. basis”.
87. IRC:72-1978; Recommended Practice for Use and Upkeep of Equipment, Tools and Appliances for Bituminous Pavement Construction.
88. IRC:90-1985; Guidelines of Selection, Operation and Maintenance of Bituminous Hot Mix Plant.
89. IRC:SP:30-2009; Manual on Economic Evaluation of Highway projects in India.
90. IRC:SP:84-2009; Manual of Specifications and Standards for four laning of Highways through Public Private Partnership.
91. IRC:SP:16-2004; Guidelines for Surface Evenness of Highway Pavements (First Revision).
92. IRC:SP:57-2000; Guidelines for Quality Systems for Road Construction.
93. IRC: 37-2001, “Guidelines for the Design of Flexible Pavements”.
94. IRC:109-1997, “Guidelines for Wet Mix Macadam”.
95. IRC:37-2001, “Guidelines for the Design of Flexible Pavements (2nd Revision)”.
96. IRC:SP:53-2002, “Guidelines on Use of Polymer and Rubber Modified Bitumen in Road Construction (First Revision)”.
97. IRC:90-1985, “Guidelines of Selection, Operation and Maintenance of Bituminous Hot Mix Plant”.
98. IRC:SP:47-1998, “Guidelines on Quality Systems for Road Bridges (Plain, Reinforced, Pre-stressed and Composite Concrete)”.
99. IRC:SP:34-1989, “General Guidelines about the Equipment for Bituminous Surface Dressing”.
100. IRC:SP:25-1984, “Gopi and his Road Roller- Guidelines on Maintenance of Road Rollers”.
101. IRC:3-1983, “Dimensions and Weights of Road Design Vehicles (First Revision).”
102. IRC:SP:29-1994, “Directory of Indigenous Manufactures of Road/Bridge Construction Machinery and Important Bridge Components (First Revision).”
103. IRC:82-1982; “Code of Practice for Maintenance of Bituminous Surfaces of Highways”.
104. Irfan Muharmmad, Khurshid Muhammad Bilal, Ahmed Anwaar and Labi Samuel (February 2012); “Scale and Condition Economies in Asset Preservation Cost Functions: Case Study Involving Flexible Pavement Treatments”; Journal of transportation engineering ASCE.
105. Jahren Charles T. and Johnston David W.
(Oct 2011), “Linkages between Constn. Engg.
Education and Research”; Journal of Construction Engg. and Management by ASCE, Vol. 137, No.10, ISSN 0733-9364, CODEN JCEMD 4.
106. Jaselskis Edward, Ruwanpura Janaka, Becher Timothi, Silva Lahiru, Jewall Paul and Floyd Eric (October 2011), “Innovation in Construction Engineering Education Using Two Applications of Internet-Based Information Technology to Provide Real Time Project Observations”; Journal of Construction Engg. and Management by ASCE, pp. 829-835.
107. Jamdar HP (August 1994), “Construction Technology and Quality Assurance”; Seminar on Bituminous Roads: Design and Constn.
Aspects by Indian Roads Congress.
108. Jayawant MB (August, 1994), “Emulsions, Cold Mix Technology”; Seminar on Bituminous Roads: Design and Constn.
Aspects by Indian Roads Congress.
109. Jain PK and Kamaraj C. (June 2009),
“Performance Study of Rubber Modified Bitumen in Structural Layers of Flexible Pavements – a Case Study”; Highway Research Journal.
110. Jang, W.S., Healy, WM, and Skibniewski, MJ (2008). “Wireless Sensor Networks as Part of a Web-Based Building Environmental Monitoring System.” Autom. Constr., 17(6), pp. 729-736.
111. Jaselskis, E.J., and EI-Misalami, T. (2003).
“Implementation Radio Frequency Identification in the Construction Process”; J.
Construction Engineering Management 129(6), pp. 680-688.
112. Jergeas George, and John Van der Put (July/August 2001), “Benefits of Constructability on Construction Projects”;
Journal of Construction Engineering and Management, pp. 281-290.
113. Jha Satyendra Narain (March 2008);
“Necessity to Monitor Shape and Size Properties of Aggregates”; Indian Highways.
114. Ji P., Jin L., Li X. (2007), "Vision-Based Vehicle Type Classification Using Partial Gabor Filter Bank," in Proceedings of the International Conference on Automation and Logistics, pp. 1037-1040.
115. Jordan, PG and Young, JC (1980),
“Developments in the Calibration and Use of the Bump-Integrator for Ride Assessment”, TRRL Supplementary Report 604, Transport and Road Research Laboratory, Crowthorne.
245 116. Kadiyali Dr. LR (August 1994), “Design of
Flexible Pavements”; Seminar on Bituminous Roads: Design and Constn. Aspects by Indian Roads Congress.
117. Kadiyali Dr. L.R., “Principles and Practice of Highway Engineer”.
118. Kakade Vijay, Das Deradatta, Reddy M.A. and Pandey B.B., “An Investigation on Warm and Half Warm Bituminous Mixes”; Journal of the IRC.
119. Kamijo S., Ikeuchi K., and Sakauchi M.
(2001), "Vehicle Tracking in Low-Angle and Front View Images Based on Spatio-Temporal Markov Random Fields," in Proceedings of the 8th World Congress on Intelligent Transportation Systems.
120. Kannan Govindan (Oct 2011), “Field Studies in Constn. Equipment Economics and Productivity”; Journal of Construction Engg.
And Management by ASCE, Vol. 137, No. 10, ISSN 0733-9364 CODEN: JCEMD4, pp. 823- 828.
121. Kannan, G (1999). “A Methodology for the Development of a Production Experience Database for Earthmoving Operations Using Automated Data Collection.” Ph.D dissertation, Virginia Polytechnic Institute and State Univ., Blacksburg, VA.
122. Kanhere N. K., Birchfield S. T., and Sarasua W. A. (2006), "Vehicle Segmentation and Tracking in the Presence of Occlusions," in Transportation Research Board Annual Meeting.
123. Kandhal Prithvi Singh (September 2010)
“Warm Mix Asphalt Technologies : An Overview”; Journal of Indian Road Congress.
124. Kandhal Prithvi Singh; “A Simple and Effective Method of Repairing Potholes in India”; Journal of the Indian Roads Congress.
125. Kandhal Prithvi Singh, Sinha VK and Veeragavan A; “A Critical Review of Bituminous Paving Mixes Used in India”;
Paper No. 541.
126. Kandhal Prithvi Singh (June, 2006), “Quality Control Requirements For Using Crumb Rubber Modified Bitumen (CRMB) in Bituminous Mixtures”; Paper No. 522, Indian Roads Congress, Volume 67-1.
127. Kandhal Prithvi Singh and Dhir MP (December 2011), “Use of Modified Bituminous Binders in India : Current Imperatives”; Journal of the Indian Roads Congress.
128. Kim Changyoon, Kim Hyoungkwan, Ryu Jeoungpil and Kim Changwan (Feb. 2011),
“Ubiquitous Sensor Network for Construction Material Monitoring”; Journal of Construction Engg. And Management by ASCE, 137, No. 2, ISSN 0733-9364 CODEN: JCEMD4.
129. Koller D., Weber J., Huang T., Malik J., Ogasawara G., Rao B., and Russell S. (1994),
“Toward Robust Automatic Traffic Scene Analysis in Real-Time,” in Proceedings of International Conference on Pattern Recognition, pp. 126–131.
130. Koller D., Dandilis K, and Nagel H. H. (1993),
“Model based Object Tracking in Monocular Image Sequences of Road Traffic Scenes in International Journal of Computer Vision”, 10(3): pp. 257–281.
131. Kolling H. and Nagel H. H. (1997), “3D Pose Estimation by Directly Matching Polyhedral Models to Gray Value Gradients,” in International Journal of Computer Vision, 23(3), pp. 283-302.
132. Koskela, L. (1992), “Application of the New Production Philosophy to Construction”, Stanford, Stanford, CA.
133. Koch M.W., Malone K. T. (2006), "A Sequential Vehicle Classifier for Infrared Video using Multinomial Pattern Matching,"
in Proceedings of the Conference on Computer Vision and Pattern Recognition Workshop, pp. 127-133.
134. Kumar K. Kantha and Veeraragavan A.
(Special issue 2008), “Influence of Air Voids on Performance of Bituminous Concrete Mixes”; Highway Research Journal.
135. Kumar Mahesh, Goyal Tripta Kumari and Jatain Abhishek (June 2012), “Premature Failure of Highways and Remedies – a Case Study”; Indian Highways.
136. Kumar S. Satya, Sridhar R, Reddy K.
Sudhakar and Bose Dr. Sunil (March 2008),
“Analytical Investigation on the Influence of Loading and Temperature on Top-Down Cracking in Bituminous Layers”; Paper No.
540, Indian Roads Congress, Volume 69-1.
137. Kunigahallia Raghavan, Russellb Jeffrey S., and Skibniewskic Miroslaw J. (1995) IMBiGs;
“Construction Automation and Intelligent Vehicle Highway Systems: Common Thrust Areas”; Automation and Robotics in Construction XII E. Budny, A.McCrea, K.Szymanski(Editors) © 1995 IMBiGs
138. Lehpamer, H. (2008), “RFID Design Principles”, Artech House, Norwood, MA.
139. Lee, S., and Akin, O. (2009). “Shadowing Trades People: Inefficiency in Maintenance Fieldwork”, Autom. Const., 18(5), pp. 536- 546.
140. Leung, SW, Mak, S and Lee, BLP (2008).
“Using a Real-Time Integrated Communication System to Monitor the Progress and Quality of Construction Works.”
Autom. Constr., 17(6), pp. 749-757.
141. Leite, F. (2009). “An Automated Approach Towards Supporting First Responders in Vulnerability Assessment and Identification of Rectification Opportunities in Buildings Emergencies” Ph.D Thesis, Deptt. of Civil and Environmental Engineering, Carnegie Mellon Univ., Pittsburgh.
142. Lu, M., Chen, W, Shen, X, Lam, HC, and Liu, J (2007) “Positioning and Tracking Construction Vehicles in Highly Dense Urban Areas and Building Construction Sites.”
Autom. Constr., 16(5), pp. 647-656.
143. Ma X., Grimson W. E. L. (2006), “Edge-Based Rich Representation for Vehicle Classification,” in Proceedings of the International Conference on Computer Vision, 2, pp. 1185-1192.
144. Malik J. and Russell S. (1997), “Traffic Surveillance and Detection Technology Development: New Traffic Sensor Technology”; California Path Research Final Report, University of California, Berkeley, UCB-ITS-PRR-97-6.
145. Martinez J.C., Peters B.A., Smith J.S., Medeiros D.J., and Rohrere M.W., (2001). “EZ
246 Strobe – General Purpose Simulation System
Based on Activity Cycle Diagrams.” Winter Simulation Conf., Arlington, VA.
146. Magee D. (2002), “Tracking Multiple Vehicles using Foreground, Background and Motion Models” in Proceedings of ECCV Workshop on Statistical Methods in Video Processing.
147. Mehndiratta Dr. H.C., Kumar Dr. Praveen and Kumar M. Sateesu; Paper no. 526;
“Investigation on Optimal Use of Gravel in Flexible Pavements”; Highway Research Journal.
148. McMahon, F Thurmul, and Halstead Woodrow J. (1969), “Quality Assurance in Highway Construction Part-1 - Introduction and Concepts” Public Roads, Vol.35, No.6, pp. 129-134.
149. Miller-Warden Associates (1965),
“Development of Guidelines for Practical and Realistic Construction Specifications”, National Research Council, Washington, DC, NCHRP Report 17.
150. Miles S. Anthony, “Expressway Maintenance”;
International Seminar on Construction Management of Expressway by Indian Roads Congress.
151. Zhongren Wang, Tom Pyle, “Implementing a pavement management system: The Caltrans experience”, International Journal of Transportation Science and Technology 8 (2019) 251–262.
152. Yue Hou, Qiuhan Li, Chen Zhang, Guoyang Lu, Zhoujing Ye, Yihan Chen, Linbing Wang, Dandan Cao, “The State-of-the-Art Review on Applications of Intrusive Sensing, Image Processing Techniques, and Machine Learning Methods in Pavement Monitoring and Analysis”, Engineering 7 (2021) 845–856.
153. Gang Yu, Shuang Zhang, Min Hu and Y. Ken Wang, “Prediction of Highway Tunnel Pavement Performance Based on Digital Twin
and Multiple Time Series Stacking”, Hindawi, Advances in Civil Engineering, Volume 2020, Article ID 8824135, 21 pages, https://doi.org/10.1155/2020/8824135.
154. Margarida Amândio, Manuel Parente, José Neves and Paulo Fonsec, “Integration of Smart Pavement Data with Decision Support Systems: A Systematic Review”, Buildings
2021, 11, 579.
https://doi.org/10.3390/buildings11120579.
155. Yaning Qiao, Joao Santos, Anne M.K. Stoner, Gerardo Flinstch, “Climate change impacts on asphalt road pavement construction and maintenance”, Journal of Industrial Ecology 2020; 24:342–355.
156. Alireza Mohammadi, S.M.ASCE, Luis Amador-Jimenez, and Feras Elsaid,
“Simplified Pavement Performance Modeling with Only Two-Time Series Observations: A Case Study of Montreal Island”, J. Transp.
Eng., Part B: Pavements, 2019, 145(4):
05019004.
157. Tariq Al-Mansoori, Aysar Abdalkadhum, Alaa S. Al-Husainy, “A Gis-Enhanced Pavement Management System: A Case Study in IRAQ”, Journal of Engineering Science and Technology • August 2020.
158. Marco Montoya-Alcaraz, Alejandro Mungaray- Moctezuma and Leonel García, “Sustainable Road Maintenance Planning in Developing Countries Based on Pavement Management Systems: Case Study in Baja California, México”, Sustainability 2020, 12, 36;
doi:10.3390/su12010036.
159. Zhihao Ye, “Research on Asphalt Pavement Diseases and Construction Quality Control under the Background of Big Data”, Journal of Physics: Conference Series, 1744 (2021)
042139, doi:10.1088/1742-
6596/1744/4/042139.