• Tidak ada hasil yang ditemukan

Final Project

N/A
N/A
Protected

Academic year: 2024

Membagikan "Final Project"

Copied!
1
0
0

Teks penuh

(1)

Final Project

Project assigned on Mar 25 Project report due on Apr 20, 6:00 pm

1 Problem

Write a program to calculate the mutual information ofM-PAM over an AWGN channel as a function of Signal-to-Noise Ratio (SNR). Develop a plot showing the following items as a function of SNR:

1. Capacity (3 Marks).

2. Mutual information ofM-PAM for M=2,4,8,16,32,64 (12 Marks).

3. Points at which a bit-error-rate of 10−6is achieved by uncoded M-PAM (3 Marks).

4. Possible coding and shaping gains over uncoded PAM (2 Marks).

2 Submission

You will need to submit a report (1 page; 2 sides) that includes your plot and explanations. Email any programs that you may have to write.

3 Marks

I will grade your report/program and assign marks suitably.

Referensi

Dokumen terkait

Praise to Allah SWT the lord of the world, who has given mercy and blessing so that this Final Project with a title THE EFFECT OF CATALYST WITH RESIN 157 BTQN ON THE STRENGTH

The Final Project entitles “ Analysis of Maximum Braking Force Disc Brake and Drum Brake On Toyota Avanza G 1.3 M/T ” has been approved by supervisors for getting the

The error analysis on the eight final project English abstracts written by the Batam Polytechnic students finds that there are 32 errors in English verbs use caused by the