• Tidak ada hasil yang ditemukan

Implementation of a Typical CAD Process on a CAD/CAM system

N/A
N/A
Protected

Academic year: 2024

Membagikan "Implementation of a Typical CAD Process on a CAD/CAM system "

Copied!
5
0
0

Teks penuh

(1)

Implementation of a Typical CAD Process on a CAD/CAM system

FET, RAMA UNIVERSITY, Mr.Devendra Kr Lohia

(2)

CAD Tools Required to Support the Design Process

FET, RAMA UNIVERSITY,

(3)

Lecture No 4 Topic: Implementation of a Typical CAM Process on a CAD/CAM system

FET, RAMA UNIVERSITY, Mr.Devendra Kr Lohia

(4)

CAM Tools Required to Support the Design Process

FET, RAMA UNIVERSITY,

(5)

Advantages of CAD/CAM systems

• Greater flexibility. •Supported integration.

• Reduced lead times. •Reduced costs.

• Reduced inventories. •Less floor space.

•Increased Productivity. •Increased utilization.

• Improved quality. • Improved customer service.

• Improved communications with suppliers. • Greater manufacturing control.

•Better product design. •Reduction of machine tools.

FET, RAMA UNIVERSITY, Mr.Devendra Kr Lohia

Referensi

Dokumen terkait

Categories for remit: Problems Identification - Solution Development - Implementation of change - Set-up/ Structure Process - Monitor/ Oversee Process.. Dimension 9: Role

The extent to which leadership and HRM systems affect Compliance Intentions represent compliance Management through the implementation of strategic Business

Improving the quality of post-harvest catfish farming pond wastewater after the phytoremedia- tion process using various hydromacrophytes can also be seen by monitoring

Implementation of a Lesson Study on Pascal's Law Using Liveworksheet- Based E-Student Worksheets Media to Analyze the Learning Process in Junior High School Andista Candra Yusro*,

Further, the students could function their technology tools to access and process the online learning as one of them reported: I think that WeLearn is easy to access the online English

After improving the measurement process by adding the Go No Go pin as an additional tool, the MSA results show the Total Gage R&R value after the improvement is made to 10.11% with

In the early implementation phase, the process of implementing LSS at the Downstream division at Palma was managed by Mr Mohamed and Plantation Sustainable Committee PSC team members..

ABSTRACT In this project paper, the topic that had been discussed and research is concerning the implementation of a carpooling system in the Klang Valley based on the Australian