Raw Materials Division

Details of CSR schemes / Projects undertaken during the quarter ending June, 2014-15 New work orders issued during the quarter ending June, 2014)

Work description Value of Work(Lacs

)

Start date Exp. / Actual Completion date

Honorarium to Para teachers for Gua Ore Mines (GOM) Peripheral village 2 Primary Schools at Lipunga; Primary School at Hirji Hutting and Primary School at Jojogutu.

2.74 01.04..201 4

31.03.2015

Honoraium for 12 teachers at Bolani Basti School, Dumurta school in Bolani Panchayat & Balagoda school, Bolani Township school & Maqtab School in Balagoda Panchayat

7.98 01.04.201 4

31.03.2015

Organizing Mega Health Camp at Banbir village of Saharapada block, Keonjhar

2.00 20.06.201 4

20.06.2014 Completed

Ongoing works till June, 2014

Work description Value of

Work (in Rs.)

Actual Start

date % of work

completed Expenditu re

incurred (in Rs.)

Exp. / Actual Completion date

Gua Ore Mines (GOM)

ITI Training 2012-14 for 11 youths of

Guasai, Thakura, Nuiya, Lipunga 3.96 01.08.2012 Ongoing 3.96 31.08.2014 ITI training 2013-15 for 25 youths 8.93 01.08.2013 Ongoing 8.93 31.08.2015 Honorarium to Para teachers for

Primary Schools at two Lipunga and one each at Hirji Hutting & Jojogutu.

2.74 01.04.2014 Conti- nuous

0.68 31.03.2015

Engagement of weaving trainer for Aashaye Handloom Centre, Gua

1.44 18.03.2014 Ongoing 0.36 17.02.2015 Manoharpur Ore Mines (MOM)

Sponsorship of 38 students from Chiria, etc for ITI training 2012-14 at Budhuvir ITC, Rourkela.

27.17 23.08.12 Ongoing 27.17 31.08.2014

Sponsorship of 77 students from Chiria, etc for ITI training 2012-14 at Ispat ITC & Koel ITC, Rourkela.

55.05 23.08.12 Ongoing 55.05 31.08.2014

Sponsorship of 74 students from Chiria and peripheral villages for ITI training 2012-14 at Dr. Ambedkar Memorial ITC & Indira Memorial ITC Rourkela.

52.91 23.08.12 Ongoing 52.91 31.08.2014

(2)

Construction of 5 Ring Wells in peripheral villages of MOM - Chiria

8.49 15.01.2014 100% Nil 14.05.2014 Meghahatuburu Iron Ore Mines (MIOM)

ITI Training 2012-14 for 14 youths of Kalaita, Mirchiguda, MbrHuttings at Dr. B R Ambedkar ITC, Jagda, Rourkela

10.01 24.08.2012 Ongoing 10.50 31.08.2014

ITI training 2013-15 for 23 youths of Kalaita, Mirchiguda, Mbr Huttings

17.87 24.08.2013 Ongoing 9.00 31.08.2015 Supply, dressing assistance and

marketing support to Self Employment Centre (SEC).

6.42 31.03.2014 NA 4.49 30.03.2015

Kiriburu Iron Ore Mines (KIOM) Development of drinking water supply & Irrigation systems in Karampada, Noagaon & Bhandgaon

13.00 22.01.2014 NA NA 21.07.2014

Construction of 2 rooms & Corridors

in the Saranda Suvan Chhatravas. 19.18 28.03.2014 50% NA 27.09.2014 Barsua Iron Mines (BIM)

Sponsoring of 25 candidates for ITI Training 2012-14

Sashyakela,Barsua, Raikela, Dengula, Kula, Bandal,

Gaganaposh, Chordhara & Taldihi

16.56 01.08.2012 Training in progress

16.55 31.08.2014

ITI training 2013-15 for 30 youths of Dengula G.P., Koira G.P. and Cordhara G.P.

21.45 01.08.2013 Training in Progress

10.72 31.08.2015

Development of Bonai College 15.80 25.01.2014 95% 9.00 15.07.2014 Construction of Sabha Gruha at

Bahamba 2.20 22.03.2014 30% NA 25.08.2014

Bolani Ore Mines (BOM)

Honoraium for 12 school teachers at Bolani Basti, Dumurta, Balagoda

& Maqtab-Balagoda Panchayat

7.98 01.04.2014 Continuo us in nature

1.99 31.03.2015

Sponsored 16 youths of Bolani Basti, Lasarda, Harmath in 2012-14 session

5.72 11.09.2012 Ongoing 5.56 31.08.2014

Providing and laying G.I. Pipe line at Gouda Basti under Bolani Panchayat

4.30 24.01.2013 100% 4.30 15.06.2013 Provision of vehicle for Janani

Express Basudebpur, CHC Keonjhar

2.96 01.06.2013 Continuo us job

2.96 31.05.2014 ITI training 2013-15 for 15 youths of

Bolani and Balagoda.

5.35 08.10.2013 Ongoing 2.50 31.08.2015 Provision of 25 of toilets with Septic

tank in Bolani Basti 12.15 03.02.2014 80% 7.90 02.08.2014

Support for providing coaching to Players of Ladies Cricket Coaching Centre, Balagoda Panchayat

1.70 01.07.2013 100% 1.70 30.06.2014

Installation of DP Sub-stn. & 63 KVA

Transformer at Munda Basti 1.55 15.01.2014 100% 1.55 30.04.2014

(3)

Kalta Iron Mines (KIM)

Sponsorship of 11 students for ITI training 2012-14 at Jhirpani, Kalta Basti, Purna-pani, Roxy, San Roxy.

3.55 30.08.2012 Ongoing 3.57 31.08.2014

ITI training 2013-15 for 20 youths 7.00 20.09.2013 Ongoing 7.16 31.08.2015 Provided Borewells, submerssible

pumps & PVC water storage tank, laying pipelines in Nayak Basti, Barla Sahi Dukan tola & Rolley camp (Toda), Roxy.

18.97 To be

started NA NA 31.07.2014

Mushroom cultivation in Toda, Roxy, Jhirpani

2.76 01.07.2014 NA NA 30.06.2015

Kuteshwar Limestone Mines (KTR) Filling of low lying land on approach

road to Konia village. 3.76 14.05.2014 90% 3.15 31.08.2014

Disilting of Pond at Konia 12.44 05.06.2014 100% 12.40 30.06.2014

Referensi

Dokumen terkait

All four (4) AWP-1 contract packages were signed by the end of 2013 with actual work commencement on January 2014.. During the quarter three (3) contract packages for AWP-2 and

The realization of the CSR program from PT Pertamina Lubricants in 2019 in the Cilacap work unit, which includes: Enduro Entrepreneurship Development: This program is

This study assesses the common fungal flora of selected poultry feed raw materials in the humid tropical environment of Imo state, Nigeria, during the rainy season months of June

MONTHLY FOOD SECURITY BULLETIN OF SOUTH AFRICA: MAY 2019 Issued: 5 June 2019 Directorate: Statistics and Economic Analysis Highlights:  During May 2019, significant rainfall

MONTHLY FOOD SECURITY BULLETIN OF SOUTH AFRICA: MAY 2017 Issued: 5 June 2017 Directorate: Statistics and Economic Analysis Highlights:  During May 2017, significant rainfall

Panda Thesis Submitted to the Department : Chemistry Date of completion of Thesis Viva-Voce Exam : 15th June 2023 Key words for description of Thesis Work : Chiroptical properties,

Simulation-based location selection • w_daysseason: the total work days during a particular season • w_hours: the maximum work hours per day • daily_utilseason: the daily

Step Procedures / Tasks Action By / Reference 1 Generally The contract allows the Contract Sum to be adjusted due to the following circumstances:- i Variations orders issued during