BAHAGIAN : 3.0 KOS ITEM-ITEM KERJA

SUB-BAHAGIAN : 3.2 DEMOLITION & SITE CLEARANCE

Kawasan A - Perlis, Kedah, & P. Pinang Kawasan D - Johor

Kawasan B - Perak Kawasan E - Pahang

Kawasan C - WP. KL, Selangor Kawasan F - Terengganu

N. Sembilan & Melaka & Kelantan

BIL. KETERANGAN KERJA UNIT JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA

(RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM)

Site Clearance

1 General clearance comprising trees and shrubs including Ha - - 500.00 - 667.00 - - - 500.00 - 1,135.00 500.00 - 901.00

uprooting all stumps of various diameters and cart away to 1,000.00 2,500.00 2,500.00

contractor's own site

2 Supply all tools, transport, labour and everything else Ha - - 650.00 - 708.00 - - - 650.00 - 708.00

necessary for clearing of site as specified of all 800.00 800.00

vegetation trees irrespective of girth including up roots etc structures and remove all from site

3 General clearance within the reserve including the demolition Ha - 200.00 - - - 300.00 - 1,433.00 200.00 - 816.50

and removal of all articles, objects and obstruction from site. 3,000.00 3,000.00

4 General clearance of areas including removal of all vegetative Ha - - 300.00 - 360.00 500.00 - 633.00 - - - 400.00 - - 300.00 - 464.33

growths, bushes, stump, fences and other similar obstruction 420.00 800.00 800.00

and disposal.

5 General clearance of the side along the alignment of the M2 - - - 0.30 - - - 0.30

drain including removal of vegetation, stumps, rubbish and other similar obstruction.

6 Allow for the approved removal including felling, uprooting No. - - - 50.00 - 50.00

and approved disposal of trees measuring 1.0 m to 1.5 m girth as measured 1.2m above ground level

7 Allow for the approved removal including felling, uprooting No. - - - 100.00 - 100.00

and approved disposal of trees measuring 1.0 m to 2.0 m girth as measured 1.2m above ground level

KAWASAN E KAWASAN F KESELURUHAN

KAWASAN A KAWASAN B KAWASAN C KAWASAN D

Page 1 of 2

(2)

BAHAGIAN : 3.0 KOS ITEM-ITEM KERJA

SUB-BAHAGIAN : 3.2 DEMOLITION & SITE CLEARANCE

Kawasan A - Perlis, Kedah, & P. Pinang Kawasan D - Johor

Kawasan B - Perak Kawasan E - Pahang

Kawasan C - WP. KL, Selangor Kawasan F - Terengganu N. Sembilan & Melaka & Kelantan

BIL. KETERANGAN KERJA UNITJULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT PURATA

(RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM)

Demolition

1 Demolition of existing of existing RC concrete bridge with timber decking size:

a 3.6m x 14.4m length No. - - - 5,000.00 - 5,000.00

b 3.6m x 21.0m length No. - - - 7,000.00 - 7,000.00

2 Demolition of road sides drain size 300mm X 300mm and cart M - - - 35.00 - 35.00

away to contractor's own site.

3 Demolition of brickwork sump size 1300 x 1300mm cart No. - - - 1,200.00 - 1,200.00

away to contractor's own site.

4 Demolition of road culvert 600mm diameter x 6.0 m length No. - - - 200.00 - 200.00

including reinforced concrete bed, wingwall and disposed to contractor's own site.

KOS2001

KAWASAN A KAWASAN B KAWASAN C KAWASAN D KAWASAN E KAWASAN F KESELURUHAN

Page 2 of 2

Referensi

Dokumen terkait

PURATA KADAR HARGA 2014 (RM) KAWASAN UTARA KAWASAN TENGAH KAWASAN TIMUR KESELURUHAN KETERANGAN KERJA Concrete Channels 30 m 40.29 40.29 ROAD FURNITURES Signage. Supply, deliver

3.0 KOS ITEM‐ITEM KERJA 3.4 CONCRETE WORKS BIL KETERANGAN KERJA UNIT * PURATA KADAR HARGA KERJA 2008 2009 RM RM RM PURATA KADAR HARGA KERJA BAGI TAHUN F Precast Concrete 1

BAHAGIAN 3.14 : MISCELLANEOUS WORKS PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT RM RM RM RM RM RM RM RM KAWASAN TENGAH KAWASAN TENGAH KAWASAN TIMUR KESELURUHAN BIL

BAHAGIAN 3.7 : CONCRETE WORK CLASS I KAWASAN UTARA KAWASAN TENGAH KAWASAN TIMUR KESELURUHAN BIL KETERANGAN KERJA UNIT PURATA KADAR HARGA 2013 RM REINFORCEMENT Mild Steel Bars

BAHAGIAN 3.6 : PILING WORK CLASS H KAWASAN UTARA KAWASAN TENGAH KAWASAN TIMUR KESELURUHAN BIL KETERANGAN KERJA UNIT PURATA KADAR HARGA 2013 RM PRECAST REINFORCED CONCRETE

BAHAGIAN 3.5 : GEOTECHNICAL WORK CLASS G PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT RM RM RM RM RM RM RM RM KESELURUHAN BIL KETERANGAN KERJA UNIT KAWASAN UTARA KAWASAN

BAHAGIAN 3.15 : ROADS AND PAVINGS CLASS Q KAWASAN UTARA KAWASAN TENGAH KAWASAN TIMUR KESELURUHAN BIL KETERANGAN KERJA UNIT PURATA KADAR HARGA 2013 RM 13 50mm thick asphaltic

BAHAGIAN 3.7 : CONCRETE WORK CLASS I PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT RM RM RM RM RM RM RM RM KESELURUHAN BIL KETERANGAN KERJA UNIT KAWASAN UTARA KAWASAN