BAHAGIAN 3.1 : ENVIRONMENTAL PROTECTION AND ENHANCEMENT (CLASS B)

PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT

(RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM)

SILT TRAP AND SILT FENCE

1 Construct and maintain silt traps at appropriate locations as directed by S.O.to mitigate siltation and water polution. Size of silt traps to cater for a capacity of 2000 to 3000 m3.

no. 9,348.00 4,000.00 -

12,180.00

9,348.00 4,000.00 - 12,180.00

2 Provide and maintain a silt fence 1.50m height as directed by S.O.

m 15.21 10.00 - 22.50 15.21 10.00 - 22.50

Silt Curtain / Screen Control

3 Provide a silt curtain/screencontrol from continuous filament non woven needle punch 100%

polypropylene, UV stabilise or equivalent complete with all accessories to areas as directed by yhe S.O. to prevent deposition of any debris, rubbish, silt, waste materials, foul water etc arising from execution of works. The depth of the silt curtain/screen from surface water level ranges between 3m to 5m as specified in item 54.9 of the specification.

m 36.70 40.00 - 65.00 36.70 40.00 - 65.00

KESELURUHAN

BIL KETERANGAN KERJA UNIT

KAWASAN UTARA KAWASAN TENGAH KAWASAN TIMUR

Kawasan Utara - Perlis, Kedah, Pulau Pinang dan Perak

Kawasan Tengah - Wilayah Persekutuan Kuala Lumpur, Melaka, Negeri Sembilan, Selangor dan Johor

Kawasan Timur - Pahang, Terengganu dan Kelantan

10

(2)

BAHAGIAN 3.1 : ENVIRONMENTAL PROTECTION AND ENHANCEMENT (CLASS B)

PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT

(RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM)

KESELURUHAN

BIL KETERANGAN KERJA UNIT

KAWASAN UTARA KAWASAN TENGAH KAWASAN TIMUR

Kawasan Utara - Perlis, Kedah, Pulau Pinang dan Perak

Kawasan Tengah - Wilayah Persekutuan Kuala Lumpur, Melaka, Negeri Sembilan, Selangor dan Johor

Kawasan Timur - Pahang, Terengganu dan Kelantan

GROSS POLLUTANT TRAPS (GPT)

To supply, deliver and install of GPT in accordance to Manual Saliran Mesra Alam "MASMA" inclusive of all necessary structures and accessories such as chamber sumps, access lids, screen and ect. : 4 Internal Chamber Diameter 900mm or Equivalent Area

that can cater for minimum volume of 1.5 cubic metre of rubbish.

no. 81,560.00 75,680.00 -

170,000.00

81,560.00 75,680.00 - 170,000.00

5 Type A : Minimum Flow Capacity 0.75 m3/s and can cater for minimum volume of 1.8 m3 of Gross Collection

no. 84,978.36 54,000.00-

120,000.00

84,978.36 54,000.00- 120,000.00

6 Internal Chamber Diameter 1,200mm or Equivalent Area that can cater for minimum volume of 2.3 cubic metre of rubbish

no. 81,560.00 75,680.00 -

170,000.00

81,560.00 75,680.00 - 170,000.00

7 Internal Chamber Diameter 1,500mm or Equivalent Area that can cater for minimum volume of 3.5 cubic metre of rubbish

no. 114,000.00 101,200.00 -

155,000.00

114,000.00 101,200.00 - 155,000.00

8 Internal Chamber Diameter 1,800mm or Equivalent Area that can cater for minimum volume of 5.2 cubic metre of rubbish

no. 98,800.00 119,680.00 -

189,000.00

98,800.00 119,680.00 - 189,000.00

11

(3)

BAHAGIAN 3.1 : ENVIRONMENTAL PROTECTION AND ENHANCEMENT (CLASS B)

PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT

(RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM)

KESELURUHAN

BIL KETERANGAN KERJA UNIT

KAWASAN UTARA KAWASAN TENGAH KAWASAN TIMUR

Kawasan Utara - Perlis, Kedah, Pulau Pinang dan Perak

Kawasan Tengah - Wilayah Persekutuan Kuala Lumpur, Melaka, Negeri Sembilan, Selangor dan Johor

Kawasan Timur - Pahang, Terengganu dan Kelantan

GROSS POLLUTANT TRAPS (GPT) (cont'd)

9 Internal Chamber Diameter 2,800mm or Equivalent Area that can cater for minimum volume of 8.2 cubic metre of rubbish

no. 168,300.00 184,800.00 -

261,000.00

168,300.00 184,800.00 - 261,000.00

10 Internal Chamber Diameter 3,000mm or Equivalent Area that can cater for minimum volume of 11.2 cubic metre of rubbish

no. 174,240.00 198,000.00 -

270,000.00

174,240.00 198,000.00 - 270,000.00

Operation and Maintenance

11 Monthly monitoring and maintenance of GPT for 1 year period after project handover/contract finish either using Lift Basket Method or Vacuum Suction or others suitable method.

mth 1,420.00 1,500.00 -

2,000.00

1,420.00 1,500.00 - 2,000.00

Removal of Floating Vegetation (Gambut)

12 Provide all necessary equipment and labour to dispose all the floating vegetation from the reservoir as directed by the S.O. and as stated in the Specification.

m2 10.50 9.25 - 12.00 10.50 9.25 - 12.00

Transport Out Floating Vegetation (Gambut) 13 Provide all the necessary equipment and labour to

transport out all the floating vegetation from the site to the places as proposed and approved by the S.O.

and as stated in the Specification.

m2 8.90 5.00 - 10.00 8.90 5.00 - 10.00

12

Referensi

Dokumen terkait

ANALYSIS AND SIMULATION OF SERVICE CONTINUITY ENHANCEMENT BY USING AUTOMATIC PROTECTION SYSTEM (APS) IN FIBER OPTIC COMMUNICATION LINKi. This report submitted in accordance

Environmental document as regulated in Article 1 Number 50 of Pekalongan City Regulation Number 3 Year 2010 on Protection and Environ- mental Management of Pekalongan City is

2535 ของ กระทรวงคมนาคม IMPLEMENTATION EVALUATION OF THE ENHANCEMENT AND CONSERVATION OF THE NATIONAL ENVIRONMENTAL QUALITY ACT B.E.2535 : A CASE STUDY OF MINISTRY OF TRANSPORT

The result shows that human right based approach can be used as an environmental protection to mitigate the annual forest and land fires through environmental communication by

Results of the Research: Strengthening environmental protection and management in the industrial era 4.0 can be done in two ways, namely: 1 strengthening the role of the community

Environmental Protection and Risk Management Presentation code: Presentation code:Presentation code: Presentation code: O-070O-070O-070O-070 ACCUMULATION OF PLUTONIUM IN MAMMALIAN