BAHAGIAN 3.1 : ENVIRONMENTAL PROTECTION AND ENHANCEMENT (CLASS B)
PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT
(RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM)
SILT TRAP AND SILT FENCE
1 Construct and maintain silt traps at appropriate locations as directed by S.O.to mitigate siltation and water polution. Size of silt traps to cater for a capacity of 2000 to 3000 m3.
no. 9,348.00 4,000.00 -
12,180.00
9,348.00 4,000.00 - 12,180.00
2 Provide and maintain a silt fence 1.50m height as directed by S.O.
m 15.21 10.00 - 22.50 15.21 10.00 - 22.50
Silt Curtain / Screen Control
3 Provide a silt curtain/screencontrol from continuous filament non woven needle punch 100%
polypropylene, UV stabilise or equivalent complete with all accessories to areas as directed by yhe S.O. to prevent deposition of any debris, rubbish, silt, waste materials, foul water etc arising from execution of works. The depth of the silt curtain/screen from surface water level ranges between 3m to 5m as specified in item 54.9 of the specification.
m 36.70 40.00 - 65.00 36.70 40.00 - 65.00
KESELURUHAN
BIL KETERANGAN KERJA UNIT
KAWASAN UTARA KAWASAN TENGAH KAWASAN TIMUR
Kawasan Utara - Perlis, Kedah, Pulau Pinang dan Perak
Kawasan Tengah - Wilayah Persekutuan Kuala Lumpur, Melaka, Negeri Sembilan, Selangor dan Johor
Kawasan Timur - Pahang, Terengganu dan Kelantan
10
BAHAGIAN 3.1 : ENVIRONMENTAL PROTECTION AND ENHANCEMENT (CLASS B)
PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT
(RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM)
KESELURUHAN
BIL KETERANGAN KERJA UNIT
KAWASAN UTARA KAWASAN TENGAH KAWASAN TIMUR
Kawasan Utara - Perlis, Kedah, Pulau Pinang dan Perak
Kawasan Tengah - Wilayah Persekutuan Kuala Lumpur, Melaka, Negeri Sembilan, Selangor dan Johor
Kawasan Timur - Pahang, Terengganu dan Kelantan
GROSS POLLUTANT TRAPS (GPT)
To supply, deliver and install of GPT in accordance to Manual Saliran Mesra Alam "MASMA" inclusive of all necessary structures and accessories such as chamber sumps, access lids, screen and ect. : 4 Internal Chamber Diameter 900mm or Equivalent Area
that can cater for minimum volume of 1.5 cubic metre of rubbish.
no. 81,560.00 75,680.00 -
170,000.00
81,560.00 75,680.00 - 170,000.00
5 Type A : Minimum Flow Capacity 0.75 m3/s and can cater for minimum volume of 1.8 m3 of Gross Collection
no. 84,978.36 54,000.00-
120,000.00
84,978.36 54,000.00- 120,000.00
6 Internal Chamber Diameter 1,200mm or Equivalent Area that can cater for minimum volume of 2.3 cubic metre of rubbish
no. 81,560.00 75,680.00 -
170,000.00
81,560.00 75,680.00 - 170,000.00
7 Internal Chamber Diameter 1,500mm or Equivalent Area that can cater for minimum volume of 3.5 cubic metre of rubbish
no. 114,000.00 101,200.00 -
155,000.00
114,000.00 101,200.00 - 155,000.00
8 Internal Chamber Diameter 1,800mm or Equivalent Area that can cater for minimum volume of 5.2 cubic metre of rubbish
no. 98,800.00 119,680.00 -
189,000.00
98,800.00 119,680.00 - 189,000.00
11
BAHAGIAN 3.1 : ENVIRONMENTAL PROTECTION AND ENHANCEMENT (CLASS B)
PURATA JULAT PURATA JULAT PURATA JULAT PURATA JULAT
(RM) (RM) (RM) (RM) (RM) (RM) (RM) (RM)
KESELURUHAN
BIL KETERANGAN KERJA UNIT
KAWASAN UTARA KAWASAN TENGAH KAWASAN TIMUR
Kawasan Utara - Perlis, Kedah, Pulau Pinang dan Perak
Kawasan Tengah - Wilayah Persekutuan Kuala Lumpur, Melaka, Negeri Sembilan, Selangor dan Johor
Kawasan Timur - Pahang, Terengganu dan Kelantan
GROSS POLLUTANT TRAPS (GPT) (cont'd)
9 Internal Chamber Diameter 2,800mm or Equivalent Area that can cater for minimum volume of 8.2 cubic metre of rubbish
no. 168,300.00 184,800.00 -
261,000.00
168,300.00 184,800.00 - 261,000.00
10 Internal Chamber Diameter 3,000mm or Equivalent Area that can cater for minimum volume of 11.2 cubic metre of rubbish
no. 174,240.00 198,000.00 -
270,000.00
174,240.00 198,000.00 - 270,000.00
Operation and Maintenance
11 Monthly monitoring and maintenance of GPT for 1 year period after project handover/contract finish either using Lift Basket Method or Vacuum Suction or others suitable method.
mth 1,420.00 1,500.00 -
2,000.00
1,420.00 1,500.00 - 2,000.00
Removal of Floating Vegetation (Gambut)
12 Provide all necessary equipment and labour to dispose all the floating vegetation from the reservoir as directed by the S.O. and as stated in the Specification.
m2 10.50 9.25 - 12.00 10.50 9.25 - 12.00
Transport Out Floating Vegetation (Gambut) 13 Provide all the necessary equipment and labour to
transport out all the floating vegetation from the site to the places as proposed and approved by the S.O.
and as stated in the Specification.
m2 8.90 5.00 - 10.00 8.90 5.00 - 10.00