bahagian 5.0 : kos sewa loji dan peralatan

N/A
N/A
Protected

Academic year: 2024

Membagikan "bahagian 5.0 : kos sewa loji dan peralatan"

Copied!
2
0
0

Teks penuh

(1)

BAHAGIAN 5.0 : KOS SEWA LOJI DAN PERALATAN

UTARA TENGAH TIMUR KESELURUHAN

1 Backhoe 57.20 59.90 53.15 56.75

2 Dragline

RB 19 65.45 82.90 86.70 78.35

RB 22 75.00 105.35 115.00 98.45

RB 30 95.00 105.65 123.35 108.00

3 Excavator

Up to 0.5 m3 71.90 82.30 72.50 75.60

0.5 m3 to 1.0 m3 79.00 39.40 88.15 68.85

Over 1.0 m3 98.50 113.40 94.40 102.10

4 Excavator houdralic operated

Up to 0.5 m3 82.40 97.95 92.80 91.05

0.5 m3 to 1.0 m3 98.30 99.05 107.20 101.50

Over 1.0 m3 115.40 111.30 97.50 108.10

5 Face Showel

Model 920 75.64 90.57 76.00 80.75

Model 950 86.00 104.85 88.00 92.95

Model 966 109.00 125.65 102.00 112.20

7 Back Pusher 55.70 60.35 45.85 54.00

8 Vibrating Roller 15 tonne 92.60 101.90 95.00 96.50

9 Compressor 77.70 72.50 85.30 78.50

10 Bulldozer

Model D4 77.15 89.95 87.15 84.75

Model D6 90.40 97.30 95.70 94.50

Model D8 99.25 109.10 110.00 106.10

11 Tractor 61.75 83.60 78.35 74.60

12 Mobile Crane

3 tonne 65.70 73.30 61.70 66.90

16 tonne 79.15 95.35 103.65 92.70

25 tonne 89.90 100.15 110.00 100.00

35tonne 127.30 138.55 147.15 137.70

40 tonne 169.50 174.45 185.00 176.30

BIL KETERANGAN KERJA UNIT PURATA KADAR HARGA (RM)

(2)

BAHAGIAN 5.0 : KOS SEWA LOJI DAN PERALATAN

KAWASAN UTARA

KAWASAN TENGAH

KAWASAN

TIMUR KESELURUHAN

13 Motor Grader 105.30 104.20 136.36 115.30

14 Dumper

Up to 0.5 m3 75.00 76.40 66.00 72.50

0.5 m3 to 3.5 m3 99.45 86.30 73.00 86.25

15 Steel Roller

8 tonne 74.60 90.40 107.50 90.85

12 tonne 84.40 107.20 124.45 105.35

16 Low Loader 151.35 125.40 156.25 144.35

17 Lorry

6 tonne 56.70 64.40 72.20 64.45

8 tonne 62.85 80.70 90.00 77.85

10 tonne 75.80 88.90 100.45 88.40

18 Tipper without road tax

6 tonne 52.65 61.90 52.50 55.70

10 tonne 64.30 70.50 65.00 66.60

19 Tipper with road tax

6 tonne 60.45 71.65 58.40 63.50

10 tonne 79.60 91.45 72.50 81.20

20 Concrete Mixer

Concrete Mixer 7/5 28.30 40.00 45.55 37.95

Concrete Mixer 10/7 35.45 49.30 49.45 44.75

Concrete Mixer 14/10 56.20 60.10 68.75 61.70

Concrete Mixer 21/14 67.80 74.80 85.00 75.90

21 Water Pump

3'' Diameter 31.20 36.95 56.00 41.40

6'' Diameter 36.20 43.25 66.00 48.50

8" Diameter 59.40 63.85 77.85 67.05

22 Welding and cutting set complete

Oxy - acetylene 68.95 73.20 86.7 76.30

Electric 65.40 80.41 82.50 76.10

23 Drilling machine complete with 82.75 105.65 125.00 104.50

all necessary equipment

BIL KETERANGAN KERJA UNIT

PURATA KADAR HARGA 2013 (RM)

Referensi

Dokumen terkait

Kelompok Kerja Jasa Konstruksi dan Jasa Lainnya PPPTMGB “LEMIGAS” pada Unit Layanan Pengadaan (ULP) Badan Penelitian dan Pengembangan Energi dan Sumber Daya Mineral, Kementerian

2015 PADA BAGIAN KESRA SCTDA K ABUPAT EN MUSI

Hubungan dimana perubahan yang terjadi pada suatu elemen mandiri (independent) akan mempengaruhi elemen yang bergantung padanya elemen yang

Juanda Tiga Jati Kota Tasikmalaya Pasal 2 NEGOSIASI HARGA SEWA PERALATAN Harga Sewa Peralatan tersebut di atas akan diperoleh dari hasil negosiasi antara kedua belah pihak yang akan

BUKAKA PASIR INDAH /Penyedia Peralatan, selanjutnya disebut PIHAK KEDUA Kedua belah pihak sepakat untuk mengadakan Perjanjian Sewa berupa : Untuk selanjutnya disebut sebagai PERALATAN

[r]

[r]

Excavation 1 Strip 300 mm thick top soils and stock pile for re-use.. 3 Excavate new drain for channelisation to the excavated borrow