• Tidak ada hasil yang ditemukan

Installation of high resistance grounding system on the ungrounded system at offshore platform

N/A
N/A
Protected

Academic year: 2024

Membagikan "Installation of high resistance grounding system on the ungrounded system at offshore platform"

Copied!
1
0
0

Teks penuh

(1)

Installation of high resistance grounding system on the ungrounded system at offshore platform

ABSTRACT

Single line to earth fault usually can be seen in the ungrounded system. The ungrounded system is used widely in offshore platforms due to its advantages over the overvoltage whenever a fault occurs in the power systems. Continuous production with less interruption is vital in the oil and gas industry to achieve the production rate target. The grounding system has evolved for the past years and improvements have been made to the ungrounded system that has been around the years in the industry. The ungrounded system has been the best grounding system when the power system needs to maintain its operation with the presence of tolerable fault such as the single line to earth fault. Some facilities have included the feature of tripping the main circuit breaker whenever there is ground fault on the non-critical equipment. This has been unproductive to the operation and time consuming in restarting the plant facility after power failure or shutdown. Kikeh offshore platform is having the same situation whenever the ground fault occurs the main circuit breaker tripped and affects the operation badly. The High Resistance Grounding (HRG) design has proved to be able to sustain the fault and at the same time allows the plant to continue operating without any unnecessary shutdown. This improves the downtime and increases productivity. Furthermore, arc hazards to personnel and the classification flammable gas area can be minimized.

Referensi

Dokumen terkait

According to Javadian (2010), the level of fault current in the system could change as the penetration of DG on the system eventually causes several impacts to the protection

This project is study about the grounding system base on TT network basic operation of Residual Current Circuit Breaker (RCCB) eaIib electrode resistance, chemical

The limitations of the problems in the design of the pig manure waste treatment installation system are as follows: a Design of an automation system for treating pig manure, b In

Based on the results of the calculations and recapitulation above, it can be seen that the duration of installation of aluminum formwork is faster than semi-system formwork, with a

The authors/ in this research Guppy fish IoT system measures Temperature, water level and pH The IoT-based system with related sensors, using the Thingspeak platform,

DESIGN AND INSTALLATION OF SOLAR HOME SYSTEM SHS PROMOTED BY THE DEPARTMENT OF ENERGY STEVE IVAN POLIDO DALUMPINES SUBMITTED TO THE FACULTY OF DEPARTMENT OF ELECTRICAL

The impedance seen by the relay on WPC fault at the substation with lagging voltage always lies in the second quadrant of the relay characteristic while that for earth fault lies in the

1 Commentary On the importance of considering land surface reflectance in earth system studies If we consider the disciplinary divisions which make up earth science: