• Tidak ada hasil yang ditemukan

Annex A: Bill of Quantities

N/A
N/A
Protected

Academic year: 2023

Membagikan "Annex A: Bill of Quantities"

Copied!
1
0
0

Teks penuh

(1)

Page 1 of 1

Annex A: Bill of Quantities

Name of Project: REPAINTING OF COLLEGE OF AGRICULTURE AND COLLEGE OF FORESTRY BUILDINGS

ITEM NO.

DESCRIPTION QTY UNIT

Unit Price

(in Pesos) Total Cost (in Pesos) LOT A. LABOR

1032 (1) a PAINTING WORKS (MASONRY/ CONCRETE) 1,330.57 sq.m.

LOT B. SUPPLIES AND MATERIALS

1 Sanding Disc, 40 grit, coarse 80 pcs

2 Sanding Disc, 100 grit, medium 60 pcs

3 Sanding Disc, 120 grit, fine 50 pcs

4 Masonry Putty, 4L 61 gal

5 Elastomeric Paint, Flat White 65 gal

6 Elastomeric Paint, Bright Green 30 gal

7 Elastomeric Paint, Fresh Mint 26 gal

8 Elastomeric Paint, Bridal White 8 gal

9 Elastomeric Paint, Stone Gray 7 gal

10 Elastomeric Paint, Neutral Gray 7 gal

11 Putty Knife/ Spatula, 4" 10 pcs

12 Paint Brush x 100 10 pcs

13 Paint Brush x 75 10 pcs

14 Roller Brush with Pan, 9" 10 pcs

15 Roller Brush Foam, 9” 20 pcs

16 Masking Tape, 2" 5 rolls

17 Masking Tape, 1" 5 rolls

TOTAL BID AMOUNT (in figures): Php TOTAL BID AMOUNT (in words): Pesos

Note: The Bill of Quantities (BOQ) contains the following parts:

a. BOQ for each Part of the Contract.

b. Summary of Bid Prices for all Parts of the Contract.

Project Duration: 28 Calendar days

Submitted by:

Name and Signature of Bidder’s Representative: _________________________________

Position: ________________________________

Name of Bidder: ______________________________

Date: ______________________

Referensi

Dokumen terkait

1100 CONDUITS, BOXES & FITTINGS 1.00 Lumpsum TOTAL BID AMOUNT in figures: Php TOTAL BID AMOUNT in words: Pesos Note: The Bill of Quantities BOQ contains the following parts: a..