• Tidak ada hasil yang ditemukan

12 mm dia. curb opening reinforcement

N/A
N/A
Protected

Academic year: 2023

Membagikan "12 mm dia. curb opening reinforcement"

Copied!
1
0
0

Teks penuh

(1)

FACULTY

COURT 2 COURT 1 RAMON MAGSAYSAY BLDG

COURT CHAPEL

ADMIN BUILDING

STUDY ROOM

HOSTEL BUILDING OFFICEOF

THE PRESIDENT

AND TENNIS COURT

BASKETBALLCOURT REHABILITATION OF TWO STOREY

LIBRARY

E. POST E. POST E. POST

E. POST

RAMON MAGSAYSAY BLDG

E. POST

FLAG POLE

END OF BARBEDWIRE FENCE PATHWALK

GH

PE SR

EXISTING ROAD EXISTING CHB WALL

MAIN GATE

ACADEMIC BUILDING 1

OVAL FIELD

FISHERIES LABORATORY

SCIENCE AND TECHNOLOGYBUILDING

ORANI CAMPUS ENTRY GATE

ACADEMIC BUILDING (FISHERIES POGRAM)

AUTO BUILDING

SHOP ROOM SHOP ROOM

EXISTING CHB FENCE

ACADEMIC BLDG. WITH LIBRARY

FOR DEMOLITION

PROPOSED 5.0 METER WIDE ROAD

PROPOSED 5.0 METER WIDE ROAD PROPOSED DRAINAGE CANAL

PROPOSED DRAINAGE CANAL

PROPOSED DRAINAGE CANAL EXISTING ROAD

8% SLOPE 1.50% - 3.0% SLOPE

150 MM THICK PCCP (3,500 psi) with 13 of Thickness transverse contraction joint @ every 4.50 meters

100 MM THICK BASE COURSE (min. 100% COMPACTION) 150 MM THICK SUB GRADE PREPARATION

(98% COMPACTION) 16 MM dia. RSB (0.60m spaced @ 600mm O.C) and @ every concrete pouring termination

NGL SEE BLOW UP DETAIL 1

SOIL EMBANKMENT 10 mm dia. Longitudinal bars

10 mm dia. Horizontal ties

@ 400mm O.C.

Reinforced concrete cover (100mm thk)

10 mm dia. Longitudinal bars

10 mm dia. U-shaped horizonta0 lbars spaced @ 300mm O.C.

8% SLOPE NGL

CONCRETE GUTTER CONCRETE CURB

12 mm dia. vertical bars spaced

@100 mm o.c with screen

SEE BLOW UP DETAIL 1.a

12 mm dia. vertical bars spaced

@100 mm o.c with screen

NOTE: CURB OPENING AT EVERY 15.00 METERS

12 mm dia. curb opening reinforcement

12 mm dia. vertical bars spaced

@100 mm o.c with screen 12 mm dia. curb opening reinforcement

BATAAN PENINSULA STATE UNIVERSITY

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

BATAAN PENINSULA STATE UNIVERSITY, ORANI CAMPUS

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE

DR. EDMUNDO C. TUNGOL

APPROVED BY:

RECOMMENDED BY:

REVISION

NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

AR. JO-ANA Z. TANEGA AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

PROJECT TITLE:

PPES DIRECTOR

ENGR. ALFREDO D. VALENTOS

NOTED BY:

C:\Users\User\Desktop\CJAE\logo-bpsu.png

SHEET NUMBER:

COMPLETION OF ROAD NETWORK AND IMPROVEMENT OF DRAINAGE SYSTEM

IN THE MAIN COMPOUND AND CONSTRUCTION OF DRAINAGE IN

ANNEX AT ORANI CAMPUS