• Tidak ada hasil yang ditemukan

ORANI CAMPUS ENTRY GATE

N/A
N/A
Protected

Academic year: 2023

Membagikan "ORANI CAMPUS ENTRY GATE"

Copied!
1
0
0

Teks penuh

(1)

FACULTY

COURT 2 COURT 1 RAMON MAGSAYSAY BLDG

COURT CHAPEL

ADMIN BUILDING

STUDY ROOM

HOSTEL BUILDING OFFICEOF

THE PRESIDENT

AND

TENNIS COURT

BASKETBALLCOURT

REHABILITATION OF TWO STOREY LIBRARY

E. POST E. POST E. POST

E. POST

RAMON MAGSAYSAY BLDG

E. POST

FLAG POLE

END OF BARBED WIRE FENCE PATHWALK

GH

PE

SR

EXISTING ROAD

EXISTING CHB WALL

MAIN GATE

ACADEMIC BUILDING 1

OVAL FIELD

FISHERIES LABORATORY

SCIENCE AND TECHNOLOGYBUILDING

ORANI CAMPUS ENTRY GATE

ACADEMIC BUILDING (FISHERIES POGRAM)

AUTO BUILDING

SHOP ROOM

SHOP ROOM

EXISTING CHB FENCE

ACADEMIC BLDG. WITH LIBRARY

FOR DEMOLITION

PROPOSED DRAINAGE CANAL PROPOSED 5.0 METER WIDE ROAD

PROPOSED 3.0 M ETER WIDE ROAD

PROPOSED 5.0 METER WIDE ROAD PROPOSED DRAINAGE CANAL

PROPOSED DRAINAGE CANAL

PROPOSED DRAINAGE CANAL EXISTING ROAD

BATAAN PENINSULA STATE UNIVERSITY

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

BATAAN PENINSULA STATE UNIVERSITY, ORANI CAMPUS

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE

DR. EDMUNDO C. TUNGOL

APPROVED BY:

RECOMMENDED BY:

REVISION NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

AR. JO-ANA Z. TANEGA AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

PROJECT TITLE:

PPES DIRECTOR

ENGR. ALFREDO D. VALENTOS

NOTED BY:

SHEET NUMBER:

COMPLETION OF ROAD NETWORK AND IMPROVEMENT OF DRAINAGE SYSTEM

IN THE MAIN COMPOUND AND CONSTRUCTION OF DRAINAGE IN

ANNEX AT ORANI CAMPUS

A2

Referensi

Dokumen terkait