• Tidak ada hasil yang ditemukan

@100 mm o.c with screen

N/A
N/A
Protected

Academic year: 2023

Membagikan "@100 mm o.c with screen"

Copied!
1
0
0

Teks penuh

(1)

12 mm dia. vertical bars spaced

@100 mm o.c with screen

NOTE: CURB OPENING AT EVERY 15.00 METERS

12 mm dia. curb opening reinforcement

12 mm dia. vertical bars spaced

@100 mm o.c with screen 12 mm dia. curb opening reinforcement

10 mm dia. Longitudinal bars 10 mm dia. Horizontal ties

@ 400mm O.C.

Reinforced concrete cover (100mm thk)

10 mm dia. Longitudinal bars

10 mm dia. U-shaped horizonta0 lbars spaced @ 300mm O.C.

8% SLOPE NGL

CONCRETE GUTTER CONCRETE CURB

12 mm dia. vertical bars spaced

@100 mm o.c with screen

SEE BLOW UP DETAIL 1.a 8% SLOPE

1.50% - 3.0% SLOPE

150 MM THICK PCCP (3,500 psi) with 13 of Thickness transverse contraction joint @ every 4.50 meters

100 MM THICK BASE COURSE (min. 100% COMPACTION)

150 MM THICK SUB GRADE PREPARATION

(98% COMPACTION) 16 MM dia. RSB (0.60m spaced @ 600mm O.C) and @ every concrete pouring termination

NGL SEE BLOW UP DETAIL 1

SOIL EMBANKMENT

WAFT/ CIVIL TECH

FOODS TRADE TECHNOLOGY BLDG

CRAFT/ COSMETOLOGY

GARMENTS

E. POST E. POST E. POST E. POST E. POST E. POST

E. POST E. POST

E. POST E. POST

E. POST E. POST

E. POST E. POST

E. POST E. POST

COVERED COURT

BASKETBALL COURT

GUARD HOUSE EXISTING CHB WALL

PERIMETER FENCE

MAIN GATE

AUTOMOTIVE

PROPOSED DORMITORY 2-STOREY DORMITORY

LAUNDRY AREA

PROPOSED DRAINAGE CANAL PROPOSED DRAINAGE CANAL

PROPOSED 6.0 METER WIDE ROAD PROPOSED 3.0 M ETER WIDE ROAD

EXISTING ROAD PROPOSED DRAINAGE CANAL

BATAAN PENINSULA STATE UNIVERSITY

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

BATAAN PENINSULA STATE UNIVERSITY, ORANI CAMPUS

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE

DR. EDMUNDO C. TUNGOL

APPROVED BY:

RECOMMENDED BY:

REVISION

NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

AR. JO-ANA Z. TANEGA AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

PROJECT TITLE:

PPES DIRECTOR

ENGR. ALFREDO D. VALENTOS

NOTED BY:

C:\Users\User\Desktop\CJAE\logo-bpsu.png

SHEET NUMBER:

COMPLETION OF ROAD NETWORK AND IMPROVEMENT OF DRAINAGE SYSTEM

IN THE MAIN COMPOUND AND CONSTRUCTION OF DRAINAGE IN

ANNEX AT ORANI CAMPUS

S2

Referensi

Dokumen terkait

Noise C = Slight L = Rare Low Risk Y Operation under time limited operations Operation of crushing plant Dust Air / windborne pathway causing impacts to amenity