• Tidak ada hasil yang ditemukan

Longitudinal bars 10 mm dia

N/A
N/A
Protected

Academic year: 2023

Membagikan "Longitudinal bars 10 mm dia"

Copied!
1
0
0

Teks penuh

(1)

FACULTY

COURT 2 COURT 1 RAMON MAGSAYSAY BLDG

COURT CHAPEL

ADMIN BUILDING

STUDY ROOM

HOSTEL BUILDING OFFICEOF

THE PRESIDENT

AND TENNIS COURT

BASKETBALLCOURT REHABILITATION OF TWO STOREY

LIBRARY

E. POST E. POST E. POST

E. POST

RAMON MAGSAYSAY BLDG

E. POST

FLAG POLE

END OF BARBED WIRE FENCE PATHWALK

GH

PE

SR

EXISTING ROAD EXISTING CHB WALL

MAIN GATE

ACADEMIC BUILDING 1

OVAL FIELD

FISHERIES LABORATORY

SCIENCE AND TECHNOLOGYBUILDING

ORANI CAMPUS ENTRY GATE

ACADEMIC BUILDING (FISHERIES POGRAM)

AUTO BUILDING

SHOP ROOM SHOP ROOM

EXISTING CHB FENCE

ACADEMIC BLDG. WITH LIBRARY

PROPOSED DRAINAGE CANAL

PROPOSED 3.0 M ETER WIDE ROAD

PROPOSED DRAINAGE CANAL EXISTING ROAD

8% SLOPE

1.50% - 3.0% SLOPE

NGL

16 MM dia. RSB (0.60m spaced @ 600mm O.C) and @ every concrete pouring termination

150 MM THICK PCCP (3,500 psi) with 13 of Thickness transverse contraction joint @ every 4.50 meters

100 MM THICK BASE COURSE (min. 100% COMPACTION) 150 MM THICK SUB GRADE PREPARATION

(98% COMPACTION)

10 mm dia. Longitudinal bars

10 mm dia. Horizontal ties @ 400mm O.C.

Reinforced concrete cover (100mm thk)

10 mm dia. Longitudinal bars

10 mm dia. U-shaped horizontal bars spaced @ 300mm O.C.

SEE BLOW UP DETAIL 1.a

SOIL EMBANKMENT

12 mm dia. vertical bars spaced

@100 mm o.c with screen

NOTE: CURB OPENING AT EVERY 15.00 METERS

12 mm dia. curb opening reinforcement

12 mm dia. vertical bars spaced

@100 mm o.c with screen 12 mm dia. curb opening reinforcement

BATAAN PENINSULA STATE UNIVERSITY

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

BATAAN PENINSULA STATE UNIVERSITY, ORANI CAMPUS

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE

DR. EDMUNDO C. TUNGOL

APPROVED BY:

RECOMMENDED BY:

REVISION

NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

AR. JO-ANA Z. TANEGA AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

PROJECT TITLE:

PPES DIRECTOR

ENGR. ALFREDO D. VALENTOS

NOTED BY:

C:\Users\User\Desktop\CJAE\logo-bpsu.png

SHEET NUMBER:

COMPLETION OF ROAD NETWORK AND IMPROVEMENT OF DRAINAGE SYSTEM

IN THE MAIN COMPOUND AND CONSTRUCTION OF DRAINAGE IN

ANNEX AT ORANI CAMPUS

S3

Referensi

Dokumen terkait