STAGE
FLAG POLE FLAG POLE
RAMP UP
LANDSCAPE LANDSCAPE
LANDSCAPE LANDSCAPE
SEPTIC VAULT
VOLLEYBALL COURT
ADDITIONAL PERIMETER FENCE
ADDITIONAL PERIMETER FENCE
LAMP POST
LAMP POST
LAMP POST
LAMP POST
LAMP POST
LAMP POST
LAMP POST
LAMP POST BOLLARD LIGHT
BOLLARD LIGHT
BOLLARD LIGHT
BOLLARD LIGHT
BOLLARD LIGHT
BOLLARD LIGHT SD FF-5
SD FF-6 SD FF-6 SD FF-6
600x600mm CONCRETE PANEL
CISTERN TANK & PUMP HOUSE
BUILDING LINE
BATAAN PENINSULA STATE UNIVERSITY
DINALUPIHAN MARKET BATAAN PENINSULA
MEDICAL CENTER
FIRE PROTECTION NOTES
1. ALL FIRE PROTECTION WORKS SHOWN HEREIN SHALL BE EXECUTED ACCORDING TO THE PROVISIONS OF PHILIPPINE MECHANICAL CODE, PHILIPPINE FIRE CODE AND THE RULES AND REGULATIONS OF THE LOCAL BUILDING OFFICIAL.
2. SPRINKLER PIPING SYSTEM SHALL BE BLACK STEEL, ASTM A53 GRADE A OR B WITH MALLEABLE IRON THREADED FITTING FOR 2 12 INCH SMALLER, WELDED / FLANGED CONNECTIONS CLASS 150.
3. SPRINKLER SYSTEM SHALL BE HYDROSTATICALLY TESTED AT 100 PSI FOR 2 HOURS WITNESSED BY REPRESENTATIVES OF THE OWNER AND BUILDING OFFICIAL.
4. SPRINKLER SYSTEM SHALL BE PROVIDED WITH ADEQUATE HANGERS / SUPPORTS.
5. CLEAN, TREAT, PRIME PIPING SYSTEM AND SUPPORTS BEFORE APPLYING ONE COAT OF CHROMATE PRIMER AND ONE TOP COAT WITH ENAMEL PAINT 6. CONTRACTOR SHALL PROVIDE ONE YEAR WARRANTY FOR THE FIRE PROTECTION WORKS AFTER COMISSIONING.
7. FIRE WATER LINE SHALL BE PROVIDED WITH ADEQUATE PIPE SUPPORT, HANGERS, BRACKETS AND SWAY BRACES
8. NEW SPRINKLER HEADS SHALL BE UPRIGHT TYPE, STANDARD 12 INCH, ORDINARY TEMPERATURE RATING, AND INSTALLED APPROXIMATELY 150 mm BELOW CEILING OR FLOOR SLAB
GENERAL NOTES 1.0
1. ALL MECHANICAL WORKS HEREIN INCLUDED SHALL BE INSTALLED IN ACCORDANCE WITH THE LATEST REQUIREMENTS OF THE PHILIPPINES NATIONAL BUILDING CODE AND THE REGULATION OF SUBIC BAY FREEPORT ZONE.
2. REGISTER AND DIFFUSER DIMENSION SHOWN ON THE DRAWING ARE NECK SIZE
3. DUCT SIZES INDICATED ON THE DRAWING REFER TO DUCT INSIDE DIMENSION. FOR INTERNALLY LINED DUCTS, SIZE DUCT WORKS TO COMPENSATE FOR THE INTERNAL LINING 4. PROVIDE 150 mm CLEARANCE BETWEEN THE EQUIPMENT BASE AND THE EDGE OF ALL CONCRETE PADS. SUBMIT SHOP DRAWINGS OF CONCRETE PADS FOR APPROVAL 5. PROVIDE VIBRATION ISOLATORS AND FLEXIBLE CONNECTORS BETWEEN THE EQUIPMENT AND PIPES / DUCTWORKS TO PREVENT TRANSMISSION OF NOISE AND VIBRATION 6. ALL DIMENSIONS ARE IN MILLIMETER, UNLESS OTHERWISE INDICATED
7. BUILDERS WORK SHALL BE PROVIDED BY MAIN CONTRACTOR TO SUIT EQUIPMENTS REQUIREMENTS WHERE APPLICABLE AND AS INDICATED IN LAYOUT DRAWING 8. PROVIDE CEILING ACCESS TO EQUIPMENT DAMPER, VALVES AND OTHER DEVICES LOCATED ABOVE CEILING
9. ALL OPENING FOR DUCTS AND PIPES SHALL NOT IN ANYWAY PENETRATE STRUCTURAL RIB ON BEAMS UNLESS OTHERWISE AUTHORIZED 10. CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR APPROVAL PRIOR TO CONSTRUCTION
11. THE SUBCONTRACTOR SHALL ENSURE THAT ALL THE OFFERED EQUIPMENT CAN BE POSITIONED
12. THE EXACT LOCATION AND LEVEL OF ALL WALL OR CEILING MOUNTED THERMOSTATS / SWITCHES SHALL THE SUBJECT TO ARCHITECT'S APPROVAL BEFORE INSTALLATION.
13. ALL AIR GRILLES / LOUVERS SHALL BE MADE OF G.I. OR APPROVED EQUAL UNLESS OTHERWISE SPECIFIED THE COLOR & SURFACE FINISHING OF THE GRILLES / LOUVERS SHALL BE SUBMITTED TO ARCHITECT FOR APPROVAL BEFORE MATERIAL ORDERING UNLESS OTHERWISE SPECIFIED, COLOR FINISHED SHALL BE IN BAKED ENAMEL PAINT.
14. DURING THE PROCESS OF THE WORKS ALL OPEN ENDS OF PIPES CONDUITS, DUCTS ETC SHALL BE SUITABLY CAPPED TO PREVENT THE INGRESS OF FOREIGN MATTER
15. FOR PIPES SLEEVES AND DUCTS THROUGH THE BARRIER, THE GAP BETWEEN THE PIPES AND SLEEVES AND THE GAP BETWEEN THE DUCTS AND FIRE BARRIERS MUST BE FIRMLY SEALED WITH SOFT PACKING HAVING A PERIOD OF FIRE RESISTANCE EQUAL TO THE FIRE BARRIERS. DETAILS OF DUCTS AND PIPES THROUGH WALL AND FLOOR SHALL BE PROVIDED BY THE CONTRACTOR AND APPROVED BY THE ARCHITECT BEFORE INSTALLATION.
16. ALL DUCTED FANS SHALL BE INSTALLED WITH FLEXIBLE DUCT CONNECTORS
17. IN THE ABSENCE OF ANY OTHER REQUIREMENT NOT FOUND IN THE LOCAL CODE, THE MATERIALS CONSTRUCTION AND INSTALLATION OF THE DUCTWORKS SHALL BE COMPLY WITH THE REQUIREMENT OF SMACNA OR ASHRAE
18. ALL DOOR LOUVER SIZES REFER TO ARCHITECTURAL DOOR SCHEDULE
19. FLEXIBLE DUCT CONNECTION SHALL BE PROVIDED WHERE ALL DUCT WORK PASSES ACROSS BUILDING EXPANSION JOINT FLEXIBLE CONNECTION SHALL BE NON - COMBUSTIBLE
GENERAL NOTES 1.1
1. ALL OS & Y VALVES SHALL BE EQUIPPED WITH TAMPER SWITCH WIRED TO FIRE ALARM PANEL 2. DISTANCE BETWEEN THE SPRINKLER DETECTOR AND CEILING SHALL BE 305mm OR LESS
3. NOMINAL 6" (152.4mm) TRANSVERSE FLUE SPACE AT RACK UPRIGHTS SHALL BE MAINTAINED IN A SINGLE ROW, DOUBLE ROW, AND MULTIPLE ROW RACKS 4. THE CLEARANCE BETWEEN THE SPRINKLER AND THE TOP OF STORAGE SHALL BE 18" (457mm)
5. MAXIMUM STORAGE HEIGHT SHALL BE 3.7 M IN ALL STORAGE AREAS
SITE DEVELOPMENT PLAN VICINITY MAP
GENERAL NOTES
BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
(DINALUPIHAN CAMPUS) DINALUPIHAN, BATAAN
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE
DR. EDMUNDO C. TUNGOL
APPROVED BY:
RECOMMENDED BY:
REVISION
NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. ROXETTE S. UMEREZ
PREPARED BY:
REVIEWED BY:
PROJECT TITLE:
DIRECTOR OF PPES
ENGR. ALFREDO D. VALENTOS
NOTED BY:
SHEET NUMBER:
BATAAN PENINSULA STATE UNIVERSITY