MEETING TITLE : Pre-Bid Conference for theSupply and Delivery of Gym Equipment for the DOF Fitness Center (ITB No. 2018-09-G) VENUE : CAO ConferenceRoom, 7/F EDPC Building

DATE : September12, 2018, Wednesday TIME : 10:00 AM

PRESENT

BAC Members Usec. Gil S. Beltran

Dir. Angelica I. Sarmiento Dir. Herminio C. Runas, Jr.

Dir. Alvin P. Diaz

Dir. Michaelangelo G. Aguinaldo

BAC-STWG Engr. Richard G. Manzano

Dir. Lilia R. Tan

Atty. Raymond Paolo A. Alikpala BAC Secretariat Ms. Liceria A. Te

Mr. Dave Renand D. Guimod Ms. Ma. Ellaine P. Atienza Ms. Ana Marie Medina Participating Bidders Mr. Ericson Antonio (Fit Inc.)

Mr. Vincent Martinez (Fit Inc.) Mr. NoePorkas (Finix)

Mr. Nelson Sy (Maxx Global) Mr. Tito Cabala (Septem Inc.)

I. Call to Order

Undersecretary Gil S. Beltran, BAC Chairperson, as the Presiding Officer, called the meeting to order at 10:46 AM and determined the quorum in attendance.

II. Highlights of the Meeting

 Approved Budget for the Contract (ABC): PhP1,641,000.00

 BAC Secretariat introduced the attendees and presented the project’s ABC, timeline, technical and financial requirements, sealing and markings of bids, some important bidder’s responsibilities, schedule of requirements and the technical specifications.

(2)

 For the treadmill, a bidder asked if the motor can be adjusted into higher specifications but was informed by BAC that all specifications stated in the bidding documents are minimum requirements.

 The cooling fan feature of equipment can be removed because the room has already air conditioning system. But bidders can still submit equipment that are with higher specifications that can meet the minimum requirements specified in the bidding documents.

 The treadmills will not be used the whole time of the day, the gym will only be used before office hours, lunch or after work in the evening. So the treadmill that can be required will be light commercial.

 The equipment with features like chest straps and iPod/MP3 input will be removed and to be issued with a Supplemental Bid Bulletin.

 There is no specified color for the equipment to be delivered. It will depend on the winning bidder but if possible, it should be like the standard colors in the gym like black and silver.

 A bidder informed that the weights required for the dumbbell set was for females. They suggested that the DOF can retain only one set of it and can add a dumbbell set for males with weights from 5 lbs to 50 lbs with rack. The BAC said that this will be considered and will put it in the Bid Bulletin.

 The locker with keys is to be removed because the bidders do not have the item. They only have sporting goods as their merchandise and they have this fear that they will not meet the specifications required for the item.

 For those who have already purchased bidding documents in the first bidding for this project, they need to buy it again because it’s the bidders fault for failing the bid.

 For the tax clearance that is on going application, bidders can submit the proof of payment but will be required to submit the clearance during the post qualification evaluation. The same will be applicable to other documents required in the bidding.

 The number of days for delivery of goods was retained to 60 days from the suggestion of a bidder to make it 90 days.

(3)

III. Adjournment

There being no other matter to discuss, the meeting was adjourned at 11:31 in the morning.

Prepared by: Noted by:

Dave Renand D. Guimod LICERIA A. TE

Member, BAC Secretariat Head, BAC Secretariat

Approved by:

GIL S. BELTRAN

Chairperson, Bids and Awards Committee

Referensi

Dokumen terkait

Some part of Technical Specifications of Lot 5: Electrical Laboratory Equipment and Peripherals under Section VII and page 27 of the bidding documents are also amended, to wit:

The BAC is requesting prospective bidders to submit three 3 sets of bidding documents for simultaneous opening and evaluation of the BAC members and TWG, Original Copy, Copy 1 and Copy

For confirmation of attendance, prospective bidders’ representative who wish to join the virtual pre-bidding conference should send the following details to the BAC Secretariat via

For confirmation of attendance, prospective bidders’ representative who wish to join the virtual pre-bid conference should send the following details to the BAC Secretariat via e- mail

Availability of Bidding documents and acceptance of Payment August 4-26, 2021 Downloadable through PhilGEPS, PhilRice Website and can be requested through email.. Please call the BAC

Availability of Bidding documents and acceptance of Payment August 4-26, 2021 Downloadable through PhilGEPS, PhilRice Website and can be requested through email.. Please call the BAC

Prospective Bidders may obtain further information from PhilRice through telecommunication or video conferencing during office hours and inspect the Bidding Documents at the PhilGeps

A complete set of Bidding Documents may be acquired by interested Bidders on November 20, 2020 – December 9, 2020 from the given address and websites below and upon payment of the