Republic
of the
f'>hililtpinesrfilfet $ffe uflflelsfil 'IDS TND AYAR,D' COTfrITTEE
National Hiqhway, Purok b, Bulitrtao, Tabuk Lity, Kalinga W*fte:http/ksu.edu.ph Enail' [email protected] ConhctNo: Gn7-A22,.6715
A BAC RESOLUTION DECLARING TWO FAILED BIDDINGS AND RECOMMENDING FOR NEGOTIATED PROCUREMENT
RESOLUTION NO. 270, S. 2017 (CIVIL
WORKS)WHEREAS,
in
compliancewith the
provisionsof
RA 9184,the
Kalinga State University (KSU) published in the PhiIGEPS websitetnttps,Zf*ww.piiitq
) on Februa ry 9,2017 to March 1 ,2017the
lnvitation to Bid (lB) for the conduct of public bidding for Design and Build Construction of 2 Units Potable Water Systems at Bulanao Campus (Ref. No.264004010100018)with
an Approved Budget for the Contract (ABC) amounting to Two Million, Nine Hundred Twelve Thousand, Six Hundred Twenty-one
Philippine Pesos (Php2,9'12,621.00) and posted the same at the KSU website(lrgg4ksg€lgph),
and conspicuous place at the premises of the University continuously for seven days;
WHEREAS, in response to the said advertisement, neither bidders came during February 17,2017 Pre-bid Conference nor submitted their proposals on March 1 ,2011 Receipt and Opening of Bids, and the BAC declared a failure of bidding pursuant to Section 35.1(a) of the Revised IRR of RA 91g4;
WHEREAS, upon request of the BAC, the TWG revised the terms, conditions and specifications in the Bidding Documents to attract prospective bidders;
WHEREAS, an lnvitation to Bid for Design and Construction of tr,rro units potable Water System at Bulanao Campus
with
the same ABC was re-adveftised at the required sites on March 4-27,2017 whichwas
respondedby three
(3) contractors, namely: Jep Construction_Marchg,20]7,
Hanging StoneConstruction-March 10,2017, and PG Velasco Construction-March 12,2017
through the
Document Request List (DRL) of PhilGEpS;WHEREAS,
during the
Pre-bid Conference conductedon March
15, 2012,the
Area project supervisor of PG Velasco construction came and inquired regarding theprojec!
WHEREAS,
on
March27,2017
Receipt and Openingof
Bids,no
one amongthe
bidders hassubmited
its proposals;WHEREAS, based on the
two
unsuccessful biddings conducted and upon request of the BAC, the TWG, Secretariat and end-user recommended the following terms, conditions and specifications:1-
The BAC should resort to Negotiated Procurement through Two-Failed Biddings modaliry asprovided by Section 53.1 of the IRR of RA 9184 to fast-tracr the implementation of the project.
2-
That design and constructionwork
maybe lump sumor
be separated, andthe
ABC be increased to at leasttwenty percent (2Wo). The 2@6 increase in ABC shall coverthe consulting services for the fol lowi ng :a.
Water Resource Plan Design.b.
Conduct of sub-surfacewater exploration to establish the most feasible underground source and locations.c.
Provision of signed and sealed report and calculations relative to the subsurface water exploration.d.
Provision of signed and sealed structural analysis, structural details, drawings, plans and specifications.e.
Provision of detailed cost estimates.Page 1 of2
κ月
̀:″
G■ Sア
』 rF Jr:ゞ
̀PsI″
BI,51‖ , lVlR'5̀0用 ‖ 177FF
N∂ど,on∂ノ「プ′gハM/∂ y,fl[ノrO々 6′ 3tr′∂ハ∂o′ TcJbtrk 6,さy′ κ∂′′r〕g∂
陛燃た ht″仙 血 .ph fmatt kttrllailomodu.ph COnね め=0917観2(145
3.
Depending on budget allocations, l(SU may possibly integrate Solar panel system or windmillas a form of alternative electrification for the operation of this proposed
two
units potable water system.4.
Whetherto
proceedwith the
design and constructionof
this water systemjointly
orseparately, the BAC shall invite at least three (3) contractors or consultants, including those contractors appeared in the DRL of PhiIGEPS, for negotiations to ensure effective competition.
Any response from one (l) consultanVbidder will suffice,
NOW, THEREFORE, We the members of
the
Bids and Awards Committee, exercising prudence, good faith and transparency, after duly consideringthe
recommendation of the TWG, Secretariat and end-user, hereby RESOLVE AS lT lS HEREBY RESOLVED:to
declarea
second failureof
biddingsfor the
Designand
Constructionof two
units Potable Water System at Bulanao Campus considering that there wereno
prospective bidderswho
submitted their bids aftertwo
publications pursuantto
Section 35.1(a)of
the Revised IRR of RA 9184;
to recommend a Negotiated Procurement
underfwo
FATLED BIDDINGS as providedby sedion
53.1 of the 2016 IRR of R.A. 9184for
the above-mentioned project; andto
recommendfor
approvalby the
Presidentof
the Kalinga State Universityof the
foregoing findings.RESOLVED FINALLY,
to
post this Resolution atthe
KSU Website and conspicuous place at the premises of the University including the BAC Bulletin Board.Done this 31St day of March 2017′ Conference Ha‖ ′Adn∩in. Bldg.′ KSU Main Campus′ Purok 6′
Bulanao′丁abuk Clty′ Kalinga.
引
[3′D5ハ NDハ Ⅳ ARDS COMM′ 刀
TE「PERFELIA R.BUEN
Member′
BAC
ROM
CPA′
DBM
Date approved:
DO Uo WACAS
Page 2 of 2
ng Entity