• Tidak ada hasil yang ditemukan

title block

N/A
N/A
Protected

Academic year: 2023

Membagikan "title block"

Copied!
1
0
0

Teks penuh

(1)

F SECOND FLOOR LINE

ROOF DECK LINE

NATURAL GRADE LINE SECOND LEVEL GROUND LINE

FIRST LEVEL GROUND LINE

7 8 5

4 3

1 2 6

F

SECOND FLOOR LINE ROOF DECK LINE

NATURAL GRADE LINE SECOND LEVEL GROUND LINE

8 7 6 5 4 3 2 1

F F F F F F F F F F F F F F F

A B C D E F G H I J K L M N

F F F

HALLWAY

F F F

F F F

F F F

F F

F

LOBBY

TECHNOLOGY AND INNOVATION SHOW ROOM

RESEARCH DEVELOPMENT OFFICE

F F

SUB-OFFICES

F F

CONFERENCE ROOM

FIRST LEVEL GROUND LINE FINISH GRADE LINE SECOND FLOOR LINE ROOF DECK LINE

NATURAL GRADE LINE SECOND LEVEL GROUND LINE

ceiling line

ceiling line

FLOOR FINISH SCHEDULE

BATAAN PENINSULA STATE UNIVERSITY

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

ABUCAY, BATAAN

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE

DR. EDMUNDO C. TUNGOL

APPROVED BY:

RECOMMENDED BY:

REVISION

NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

PROJECT TITLE:

DIRECTOR, PPES

ENGR. ALFREDO D. VALENTOS

NOTED BY:

SHEET NUMBER:

(FOR ARCHITECT'S APPROVAL) WALL FINISH SCHEDULE (FOR ARCHITECT'S APPROVAL)

BATAAN PENINSULA STATE UNIVERSITY (ABUCAY CAMPUS)

CONSTRUCTION OF UNIVERSITY RESEARCH, EXTENSION AND DEVELOPMENT INNOVATION CENTER AT ABUCAY CAMPUS

FF-1 FF-2 FF-3 FF-4 FF-5 FF-6

WF-1 60 x 60 CERAMIC NON-SKID TILES (DARK COLOR)

60 cm x 60 cm POLISHED CERAMIC TILES

30 cm x 30cm NON-SKID CERAMIC TILES (LIGHT COLOR)

VITRIFIED CERAMIC TILES (WOOD FINISH)

SAND BLAST FINISH

BROAD LOOMS FINISH CARPET

60 x 60 CERAMIC NON-SKID TILES (LIGHT COLOR)

FF-7 60 x 60 CERAMIC NON-SKID TILES W/ ANTI SLIP THREAD NOSING FF-8 SMOOTH FINISH CONCRETE

SEMI-GLOSS LATEX PAINT WF-2

WF-3

WF-4 TADAO ANDO CEMENT FINISH SMOOTH PAINTED FINISH

L E F T - S I D E E L E V A T I O N

SCALE 1:150 MTS

A 7

1

R I G H T - S I D E E L E V A T I O N

SCALE 1:150 MTS

A 7

2

L O N G I T U D I N A L S E C T I O N

SCALE 1:150 MTS

A 7

3

GROOVE @ 150mm SPACING

WF-3

WF-3

WF-3

GROOVE @ 150mm SPACING

A7

·LEFT-SIDE ELEVATION

·RIGHT-SIDE ELEVATION

·LONGITUDINAL SECTION

Referensi

Dokumen terkait

BAYED PROJECT TITLE: CONSTRUCTION OF PERIMETER FENCING AT RIZAL CAMPUS- MULBERRY FARM Project Location: KSU-Rizal Campus, Bagbag, Rizal, Kalinga RECOMMENDING APPROVAL: DIRECTOR FOR

VALENTOS NOTED BY: SHEET NUMBER: FOR ARCHITECT'S APPROVAL WALL FINISH SCHEDULE FOR ARCHITECT'S APPROVAL BATAAN PENINSULA STATE UNIVERSITY ABUCAY CAMPUS CONSTRUCTION OF UNIVERSITY