F SECOND FLOOR LINE
ROOF DECK LINE
NATURAL GRADE LINE SECOND LEVEL GROUND LINE
FIRST LEVEL GROUND LINE
7 8 5
4 3
1 2 6
F
SECOND FLOOR LINE ROOF DECK LINE
NATURAL GRADE LINE SECOND LEVEL GROUND LINE
8 7 6 5 4 3 2 1
F F F F F F F F F F F F F F F
A B C D E F G H I J K L M N
F F F
HALLWAY
F F F
F F F
F F F
F F
F
LOBBY
TECHNOLOGY AND INNOVATION SHOW ROOM
RESEARCH DEVELOPMENT OFFICE
F F
SUB-OFFICES
F F
CONFERENCE ROOM
FIRST LEVEL GROUND LINE FINISH GRADE LINE SECOND FLOOR LINE ROOF DECK LINE
NATURAL GRADE LINE SECOND LEVEL GROUND LINE
ceiling line
ceiling line
FLOOR FINISH SCHEDULE
BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
ABUCAY, BATAAN
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE
DR. EDMUNDO C. TUNGOL
APPROVED BY:
RECOMMENDED BY:
REVISION
NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
PROJECT TITLE:
DIRECTOR, PPES
ENGR. ALFREDO D. VALENTOS
NOTED BY:
SHEET NUMBER:
(FOR ARCHITECT'S APPROVAL) WALL FINISH SCHEDULE (FOR ARCHITECT'S APPROVAL)
BATAAN PENINSULA STATE UNIVERSITY (ABUCAY CAMPUS)
CONSTRUCTION OF UNIVERSITY RESEARCH, EXTENSION AND DEVELOPMENT INNOVATION CENTER AT ABUCAY CAMPUS
FF-1 FF-2 FF-3 FF-4 FF-5 FF-6
WF-1 60 x 60 CERAMIC NON-SKID TILES (DARK COLOR)
60 cm x 60 cm POLISHED CERAMIC TILES
30 cm x 30cm NON-SKID CERAMIC TILES (LIGHT COLOR)
VITRIFIED CERAMIC TILES (WOOD FINISH)
SAND BLAST FINISH
BROAD LOOMS FINISH CARPET
60 x 60 CERAMIC NON-SKID TILES (LIGHT COLOR)
FF-7 60 x 60 CERAMIC NON-SKID TILES W/ ANTI SLIP THREAD NOSING FF-8 SMOOTH FINISH CONCRETE
SEMI-GLOSS LATEX PAINT WF-2
WF-3
WF-4 TADAO ANDO CEMENT FINISH SMOOTH PAINTED FINISH
L E F T - S I D E E L E V A T I O N
SCALE 1:150 MTS
A 7
1
R I G H T - S I D E E L E V A T I O N
SCALE 1:150 MTS
A 7
2
L O N G I T U D I N A L S E C T I O N
SCALE 1:150 MTS
A 7
3
GROOVE @ 150mm SPACING
WF-3
WF-3
WF-3
GROOVE @ 150mm SPACING
A7
·LEFT-SIDE ELEVATION
·RIGHT-SIDE ELEVATION
·LONGITUDINAL SECTION