6
G H I J K L N
1
3
4
5
7
DOWN
DOWN
RAILINGS RAILINGS RAILINGS RAILINGS RAILINGS RAILINGS RAILINGS RAILINGS
RAILINGS RAILINGS
RAILINGSRAILINGSRAILINGSRAILINGSRAILINGS RAILINGS
ROOF DECK FF-8
ROOF DECK FF-8
ROOF DECK FF-8
F
E M
FLOOR FINISH SCHEDULE
BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
ABUCAY, BATAAN
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE
DR. EDMUNDO C. TUNGOL
APPROVED BY:
RECOMMENDED BY:
REVISION
NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
PROJECT TITLE:
DIRECTOR, PPES
ENGR. ALFREDO D. VALENTOS
NOTED BY:
SHEET NUMBER:
(FOR ARCHITECT'S APPROVAL) WALL FINISH SCHEDULE (FOR ARCHITECT'S APPROVAL)
BATAAN PENINSULA STATE UNIVERSITY (ABUCAY CAMPUS)
CONSTRUCTION OF UNIVERSITY RESEARCH, EXTENSION AND DEVELOPMENT INNOVATION CENTER AT ABUCAY CAMPUS
FF-1 FF-2 FF-3 FF-4 FF-5 FF-6
WF-1 60 x 60 CERAMIC NON-SKID TILES (DARK COLOR)
60 cm x 60 cm POLISHED CERAMIC TILES
30 cm x 30cm NON-SKID CERAMIC TILES (LIGHT COLOR)
VITRIFIED CERAMIC TILES (WOOD FINISH)
SAND BLAST FINISH
BROAD LOOMS FINISH CARPET
60 x 60 CERAMIC NON-SKID TILES (LIGHT COLOR)
FF-7 60 x 60 CERAMIC NON-SKID TILES W/ ANTI SLIP THREAD NOSING FF-8 SMOOTH FINISH CONCRETE
SEMI-GLOSS LATEX PAINT WF-2
WF-3
WF-4 TADAO ANDO CEMENT FINISH SMOOTH PAINTED FINISH
R O O F D E C K P L A N
SCALE 1:150 MTS
A
1
A5
·ROOF DECK PLAN
5