FLOOR FINISH SCHEDULE

BATAAN PENINSULA STATE UNIVERSITY

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

ABUCAY, BATAAN

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE

DR. EDMUNDO C. TUNGOL

APPROVED BY:

RECOMMENDED BY:

REVISION

NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

PROJECT TITLE:

DIRECTOR, PPES

ENGR. ALFREDO D. VALENTOS

NOTED BY:

SHEET NUMBER:

(FOR ARCHITECT'S APPROVAL) WALL FINISH SCHEDULE (FOR ARCHITECT'S APPROVAL)

BATAAN PENINSULA STATE UNIVERSITY (ABUCAY CAMPUS)

CONSTRUCTION OF UNIVERSITY RESEARCH, EXTENSION AND DEVELOPMENT INNOVATION CENTER AT ABUCAY CAMPUS

FF-1 FF-2 FF-3 FF-4 FF-5 FF-6

WF-1 60 x 60 CERAMIC NON-SKID TILES (DARK COLOR)

60 cm x 60 cm POLISHED CERAMIC TILES

30 cm x 30cm NON-SKID CERAMIC TILES (LIGHT COLOR)

VITRIFIED CERAMIC TILES (WOOD FINISH)

SAND BLAST FINISH

BROAD LOOMS FINISH CARPET

60 x 60 CERAMIC NON-SKID TILES (LIGHT COLOR)

FF-7 60 x 60 CERAMIC NON-SKID TILES W/ ANTI SLIP THREAD NOSING FF-8 SMOOTH FINISH CONCRETE

SEMI-GLOSS LATEX PAINT WF-2

WF-3

WF-4 TADAO ANDO CEMENT FINISH SMOOTH PAINTED FINISH

R O O F D E C K P L A N

SCALE 1:150 MTS

A

1

A5

·ROOF DECK PLAN

5

Referensi

Dokumen terkait

ARRIS HOUSE CONSTRUCTION JOINT CENTER LINE OF ROAD A-AC-02 ·FLOOR PLAN ·SECTION OF ROAD BATAAN PENINSULA STATE UNIVERSITY TECHNICAL WORKING GROUP FOR INFRASTRUCTURE ABUCAY,

VALENTOS NOTED BY: SHEET NUMBER: BATAAN PENINSULA STATE UNIVERSITY MAIN INSTALLATION OF AUTOMATIC GUIDE-WAY TRANSIT AGT IN CAMPUS DIRECTOR JASON ANTHONY BANZON 1 BPSU MAIN