CONSTRUCTION JOINT
CONSTRUCTION JOINT
NOTE:
TIES "A" : Ø 10mm @ 50mm O.C.
TIES "A" : Ø 10mm @ 100mm O.C.
NGL
CL C1-B3
CONNECTION
CONSTRUCTION JOINT
C1 SECTION
10 mm Ø CLOSED STIRRUPS SPACED @ 100mm O.C.
12 mm Ø DOWELS SPACED @ 142 mm O.C.
ALONG WIDTH OF B3
PROVIDE 2 ADDITIONAL STIRRUPS 50mm FROM LINE OF C1 TOP
10mm Ø STIRRUPS SPACED 1@50mm, REST @ 100mm FROM FACE OF C1 PROVIDE ADDITIONAL
6 SETS OF STIRRUPS AT MID OF B3 B3
SECTION
B2 SECTION
C1 SECTION
L
10mm CLOSED TIES 24-25 mm Ø VERTICAL BARS
7-16mm Ø BOTTOM BARS 2-20mm Ø REBAR 10mm Ø STIRRUPS 2-20mm Ø REBAR 7-16mm Ø TOP BARS 12mm Ø CONNECTING
DOWELS @ 142mm O.C. 7-16mm Ø TOP BARS
2-16mm Ø TOP BARS 2-16mm Ø TOP BARS 10mm Ø STIRRUPS 10mm Ø STIRRUPS
7-16mm Ø TOP BARS
1:40mts AUTOMATED GUIDEWAY TRANSIT SYSTEM
DETA ILED SECTION OF C1/F1
SCALE 1:15mts
AUTOMATED GUIDEWAY TRANSIT SYSTEM
C 1 - B 3 C O N N E C T I O N D E T A I L
SCALE
1:20mts AUTOMATED GUIDEWAY TRANSIT SYSTEM
D E T A I L E D S E C T I O N O F C 1
SCALE 1:20mts
AUTOMATED GUIDEWAY TRANSIT SYSTEM
DETAILED SECTION OF (B3 @P'-P')
SCALE 1:20mts
AUTOMATED GUIDEWAY TRANSIT SYSTEM
DETAILED SECTION OF (B3 @P-P)
SCALE
BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
CAMPUS), BALANGA CITY, BATAAN
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE
DR. EDMUNDO C. TUNGOL
APPROVED BY:
RECOMMENDED BY:
REVISION NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. ROXETTE S. UMEREZ
PREPARED BY:
REVIEWED BY:
PROJECT TITLE:
DIRECTOR OF PPES
ENGR. ALFREDO D. VALENTOS
NOTED BY:
SHEET NUMBER:
BATAAN PENINSULA STATE UNIVERSITY (MAIN
INSTALLATION OF AUTOMATIC GUIDE-WAY TRANSIT (AGT) IN
CAMPUS DIRECTOR
JASON ANTHONY BANZON
1
BPSU MAIN CAMPUS