• Tidak ada hasil yang ditemukan

ARRIS HOUSE

N/A
N/A
Protected

Academic year: 2023

Membagikan "ARRIS HOUSE"

Copied!
1
0
0

Teks penuh

(1)

NOTE:

1. AT EVERY CONSTRUCTION JOINT PROVIDE 16mm Ø BAR SPACED AT 0.60m ON CENTER

0.175M PORTLAND CEMENT CONCRETE PAVEMENT

0.15m AGGREGATE BASE COURSE

10mm Ø HORIZONTAL BARS 10mm Ø BARS @ EVERY 400mm

4PCS - 10mm Ø LONGITUDINAL BARS 3 LAYERS CHB

CL

TO ADMIN BLDG.

TO MUSHROOMBLDG.

ARRIS HOUSE

CONSTRUCTION JOINT

CENTER LINE OF ROAD

A-AC-02

·FLOOR PLAN

·SECTION OF ROAD BATAAN PENINSULA STATE UNIVERSITY

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

ABUCAY, BATAAN

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE

DR. EDMUNDO C. TUNGOL

APPROVED BY:

RECOMMENDED BY:

REVISION NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

WALTER G. VALDEZ AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

PROJECT TITLE:

PPES DIRECTOR

ENGR. ALFREDO D. VALENTOS

REVIEWED BY:

SHEET NUMBER:

BATAAN PENINSULA STATE UNIVERSITY (ABUCAY CAMPUS)

CONSTRUCTION OF ROAD NETWORK AND DRAINAGE SYSTEM AT BPSU ABUCAY

CAMPUS

Referensi

Dokumen terkait

The data source of this research was a video conversation entitled Actors On Actors: Saoirse Ronan and Kristen Wiig Full Video that published in December 6, 2017 in Variety YouTube

VALENTOS REVIEWED BY: SHEET NUMBER: BATAAN PENINSULA STATE UNIVERSITY ABUCAY CAMPUS ..\..\..\Documents\0.png S-AC-01 · ELEVATION · COLUMN FOOTING DETAIL · COLUMN DETAIL