1. AT EVERY CONSTRUCTION JOINT PROVIDE 16mm Ø BAR SPACED AT 0.60m ON CENTER
0.175M PORTLAND CEMENT CONCRETE PAVEMENT
0.15m AGGREGATE BASE COURSE
10mm Ø HORIZONTAL BARS 10mm Ø BARS @ EVERY 400mm
4PCS - 10mm Ø LONGITUDINAL BARS 3 LAYERS CHB
CL
TO ADMIN BLDG.
TO MUSHROOMBLDG.
ARRIS HOUSE
CONSTRUCTION JOINT
CENTER LINE OF ROAD
A-AC-02
·FLOOR PLAN
·SECTION OF ROAD BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
ABUCAY, BATAAN
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE
DR. EDMUNDO C. TUNGOL
APPROVED BY:
RECOMMENDED BY:
REVISION NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
WALTER G. VALDEZ AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
PROJECT TITLE:
PPES DIRECTOR
ENGR. ALFREDO D. VALENTOS
REVIEWED BY:
SHEET NUMBER:
BATAAN PENINSULA STATE UNIVERSITY (ABUCAY CAMPUS)
CONSTRUCTION OF ROAD NETWORK AND DRAINAGE SYSTEM AT BPSU ABUCAY
CAMPUS