NOTE:
1. AT EVERY CONSTRUCTION JOINT PROVIDE 16mm Ø BAR SPACED AT 0.60m ON CENTER
0.175M PORTLAND CEMENT CONCRETE PAVEMENT 0.15m AGGREGATE BASE COURSE CL
RAMP UP
UP
S I D E W A L K S I D E W A L K
RAMP UPRAMP UP
GUTTER
GUTTER GUTTER
GUTTER
GUTTER
GUTTER
GUTTER GUTTER
GUTTER GUTTER
GUTTER
GUTTER GUTTER
GUTTER
RAMP UP
COVERED LADIES DORMDORM ADMIN. BLDG.
LADIES DORM
GUARD HOUSE
BOYS DORM
AMPHITHEATER
ENTRY GATE
SUPPLIES & MOTOR POOL
GREEN HOUSE
CLIFF
EXISTING BARBED WIRE FENCE
ENTRY GATE
CT
OLD ENG2ND FLR BALCONY
OLD ENG
ROOF DECK
ROOF DECK
SECOND FLOORBALCONY
SECOND FLOORBALCONY ROOF DECKBTVTE BSA
BTVTE BSA
COURT
DN
DN DN
UP
RAMP UP
RAMP UP
RAMP UP
S I D E W A L K
PROPOSED FUTURE PARKING SLOT PROPOSED ROAD
S I D E W A L K
S I D E W A L K
ROOF DECK ELEV.: + 10.40m PROPOSED TOWER
dn345678910111213141516
21
1718
LOCATION VIEWING DECK
ELEV.: +7.00m ELEV.: +7.00m
( LIBRARY BUILDING PHASE 1 )
H A L L W A Y H A L L W A Y
S I D E W A L K S I D E W A L K
RAMP UP
PATHWALK
R O A D
R O A D
R O A D
R O A D
R O A D
LADIES DORM
BUILDING BSA
BUILDING
BTVTE BUILDING
GUARD HOUSE
CLIFF
R O A D
R O A D
R O A D R O A D R O A D
R O A D
R O A D
LADIES DORMITORY
(FUTURE DEVELOPMENT)DORMITORIES
BALCONY
DECK DECK
BALCONY
DECK DECK
MEN'S DORMITORY R O A D
R O A D
POULTRY
POULTRY
P R O P O S E D R O A D
A-AC-01
·FLOOR PLAN
·SECTION OF ROAD BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
ABUCAY, BATAAN
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE
DR. EDMUNDO C. TUNGOL
APPROVED BY:
RECOMMENDED BY:
REVISION NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
WALTER G. VALDEZ AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
PROJECT TITLE:
PPES DIRECTOR
ENGR. ALFREDO D. VALENTOS
REVIEWED BY:
SHEET NUMBER:
BATAAN PENINSULA STATE UNIVERSITY (ABUCAY CAMPUS)
CONSTRUCTION OF ROAD NETWORK AND DRAINAGE SYSTEM AT BPSU ABUCAY
CAMPUS