• Tidak ada hasil yang ditemukan

title block

N/A
N/A
Protected

Academic year: 2023

Membagikan "title block"

Copied!
1
0
0

Teks penuh

(1)

TOILET FACILITY

(FEMALE) (MALE)

TOILET FACILITY

PWD TOILET

FF-3 FF-3 FF-3

TOILET FACILITY

(MALE) (FEMALE)

TOILET FACILITY

PWD TOILET

300X600MM CERAMIC TILES GRAB BAR 300X600MM CERAMIC TILES

300X600MM CERAMIC TILES LOW PARTITION (100MMTHK X 2100 CHB WALL)

TOILET FACILITY (MALE)

TOILET FACILITY (FEMALE)

canopy line canopy line

TOILET FF-3 FF-3

FF-3

P-1 P-1

TOILET FACILITY (MALE)

TOILET FACILITY (FEMALE)

300X600MM CERAMIC TILES 300X600MM CERAMIC TILES

480X1160 MIRROR

LOW PARTITION (100MMTHK X 2100 CHB WALL)

300X600MM CERAMIC TILES UPVC AWNING WINDOW

FLOOR FINISH SCHEDULE

BATAAN PENINSULA STATE UNIVERSITY

TECHNICAL WORKING GROUP FOR INFRASTRUCTURE

ABUCAY, BATAAN

UNIVERSITY PRESIDENT

DR. GREGORIO J. RODIS

VICE PRESIDENT ADMIN. & FINANCE

DR. EDMUNDO C. TUNGOL

APPROVED BY:

RECOMMENDED BY:

REVISION

NO.

2

DESCRIPTION DATE

SHEET CONTENT:

LOCATION:

AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ

PREPARED BY:

CHECKED BY:

PROJECT TITLE:

DIRECTOR, PPES

ENGR. ALFREDO D. VALENTOS

NOTED BY:

SHEET NUMBER:

(FOR ARCHITECT'S APPROVAL) WALL FINISH SCHEDULE (FOR ARCHITECT'S APPROVAL)

BATAAN PENINSULA STATE UNIVERSITY (ABUCAY CAMPUS)

CONSTRUCTION OF UNIVERSITY RESEARCH, EXTENSION AND DEVELOPMENT INNOVATION CENTER AT ABUCAY CAMPUS

FF-1 FF-2 FF-3 FF-4 FF-5 FF-6

WF-1 60 x 60 CERAMIC NON-SKID TILES (DARK COLOR)

60 cm x 60 cm POLISHED CERAMIC TILES

30 cm x 30cm NON-SKID CERAMIC TILES (LIGHT COLOR)

VITRIFIED CERAMIC TILES (WOOD FINISH)

SAND BLAST FINISH

BROAD LOOMS FINISH CARPET

60 x 60 CERAMIC NON-SKID TILES (LIGHT COLOR)

FF-7 60 x 60 CERAMIC NON-SKID TILES W/ ANTI SLIP THREAD NOSING FF-8 SMOOTH FINISH CONCRETE

SEMI-GLOSS LATEX PAINT WF-2

WF-3

WF-4 TADAO ANDO CEMENT FINISH SMOOTH PAINTED FINISH

SCALE 1:80 MTS

BLOW-UP PLAN (TOILET FACILITIES)

F L O O R P L A N

A 9

1

SCALE 1:80 MTS

(TOILET FACILITIES)

S E C T I O N

A 9

1

A10

·TOILET FACILITIES DETAILS

·PLAN

·SECTION

Referensi

Dokumen terkait

The 30th Joint Workshop on Linguistics and Language Processing Programme Saturday 26 March 2022 12:00* Opening remark by Professors Harada and Kim 12:05-13:05 Session A 1

ARRIS HOUSE CONSTRUCTION JOINT CENTER LINE OF ROAD A-AC-02 ·FLOOR PLAN ·SECTION OF ROAD BATAAN PENINSULA STATE UNIVERSITY TECHNICAL WORKING GROUP FOR INFRASTRUCTURE ABUCAY,