F
F F F F F F F
NATURAL GRADE LINE FINISH GRADE LINE
SECOND FLOOR LINE
SECOND LEVEL GROUND LINE ROOF DECK LINE
FIRST LEVEL GROUND LINE
A B C D E F G H I J K L M N
F F F F
F F F F F
F F
F F F
F
F F F F F F F F F
F F F F
F F F F F F F F
F F
F F
F F F F F F F F F F F F F F F F F F F F F F F F
SECOND FLOOR LINE ROOF DECK LINE
NATURAL GRADE LINE SECOND LEVEL GROUND LINE
FINISH GRADE LINE
FIRST LEVEL GROUND LINE
A B
C D
E F
G H
I J
K L
N M
F F F
F F F F F F F F
F
F F F F F F F F F F F F F F F F
FLOOR FINISH SCHEDULE
BATAAN PENINSULA STATE UNIVERSITY
TECHNICAL WORKING GROUP FOR INFRASTRUCTURE
ABUCAY, BATAAN
UNIVERSITY PRESIDENT
DR. GREGORIO J. RODIS
VICE PRESIDENT ADMIN. & FINANCE
DR. EDMUNDO C. TUNGOL
APPROVED BY:
RECOMMENDED BY:
REVISION
NO.
2
DESCRIPTION DATE
SHEET CONTENT:
LOCATION:
AR. JO-ANA MARI Z. TANEGA AR. ROXETTE S. UMEREZ
PREPARED BY:
CHECKED BY:
PROJECT TITLE:
DIRECTOR, PPES
ENGR. ALFREDO D. VALENTOS
NOTED BY:
SHEET NUMBER:
(FOR ARCHITECT'S APPROVAL) WALL FINISH SCHEDULE (FOR ARCHITECT'S APPROVAL)
BATAAN PENINSULA STATE UNIVERSITY (ABUCAY CAMPUS)
CONSTRUCTION OF UNIVERSITY RESEARCH, EXTENSION AND DEVELOPMENT INNOVATION CENTER AT ABUCAY CAMPUS
FF-1 FF-2 FF-3 FF-4 FF-5 FF-6
WF-1 60 x 60 CERAMIC NON-SKID TILES (DARK COLOR)
60 cm x 60 cm POLISHED CERAMIC TILES
30 cm x 30cm NON-SKID CERAMIC TILES (LIGHT COLOR)
VITRIFIED CERAMIC TILES (WOOD FINISH)
SAND BLAST FINISH
BROAD LOOMS FINISH CARPET
60 x 60 CERAMIC NON-SKID TILES (LIGHT COLOR)
FF-7 60 x 60 CERAMIC NON-SKID TILES W/ ANTI SLIP THREAD NOSING FF-8 SMOOTH FINISH CONCRETE
SEMI-GLOSS LATEX PAINT WF-2
WF-3
WF-4 TADAO ANDO CEMENT FINISH SMOOTH PAINTED FINISH
F R O N T E L E V A T I O N
SCALE 1:150 MTS
A 6
1
R E A R E L E V A T I O N
SCALE 1:150 MTS
A 6
2
WF-3
WF-1 WF-4
GROOVE @ 150mm SPACING
WF-3
130mm x 80 mm CONCRETE MOULDING 80 mm x 45mm CONCRETE MOULDING
WF-3
150mm x 50mm TUBULAR BARS @100mm SPACING
WF-3
WF-3
100mm x50mm CONCRETE MOULDING 300mm x50mm CONCRETE MOULDING PROTRUDING WALL @ 50mm
200mm x 75 mm CONCRETE MOULDING
A6
·FRONT ELEVATION
·REAR ELEVATION