Location: Leyte Normal University, Tacloban city Duration: 75 CD 60 CD
MAT'L./EQ. LABOR TOTAL
A GENERAL REQUIREMENTS
1.0 Excavation 1.00 lot
2.0 Cleaning , Clearing, Hauling and Disposal of Wastes/Garbage and Debris 1.00 lot
3.0 Scafoldings 1.00 lot
4.0 Tools and Equipment 1.00 lot
5.0 Electrical Works (2 sets of Post & Solar Lightihg installation & electrical wire/cable installation) 1.00 lot
6.0 Concreted Floor (6m x 6m x .10) 1.00 lot
Sub-Total A Total Amount for GENERAL REQUIREMENTS B Encasement Works
1.0 Structural Works for encasement
Formworks (wood, Plywood, Nails and Etc.) 1.00 lot
Portland Cement Type 1 264.00 Bags
Coarse sand 9.00 Cum
3/4 Gravel 18.00 Cum
4 inches sanitary pipe (series 1000) 106.00 pcs
Sub-Total B Encasement Works C Fencing Works and Gate Works
1.0 Construction of Fence
G.i Pipes 1 1/2 x 1.5mm (shedule 40)2 1/2 x 4mm 6.00 pcs
Cut off Wheel # 4 12.00 pcs
Welding Rod 6.00 kilos
Epoxy Primer (Gray) 1.00 Gal
Metal Grinding Wheel #4 2.00 pcs
Cyclone Wire G35 1.00 Roll
Barb Wire 1.00 Roll
Sub-Total B Fencing Works and Gate Works
E Construction Safety & Health
1.0 Site Occupational 1.00 l.s
Sub-Total E Total Amount for Construction Safety & Health
SUMMARY
General Requirements -
Encasement Works -
Fencing Works and Gate Works -
Construction Safety and Health -
-
Sub-Total -
CP (10%) Overhead, Contingencies and Miscellanous (3%) VAT [5% x (Sub-Total + CP+OCM)]
Total Amount Project Cost
Prepared by:
Engr. Clinton Val Brigola
LEYTE NORMAL UNIVERSITY TACLOBAN CITY
ITEM
NO. DESCRIPTION QTY. UNIT
UNIT COST
AMOUNT Contract Name: Underground Cabling Encasement
DETAILED ESTIMATES
Page 1