LOCAL ECONOMIC DEVELOPMENT

Dalam dokumen Annual Report 2018/19 - MFMA (Halaman 137-189)

Output 4: Deepen democracy through a refined ward committee model Sub outputs

3.14 LOCAL ECONOMIC DEVELOPMENT

INTRODUCTION TO ECONOMIC DEVLOPMENT

Mahikeng Local Municipality is faced by development problem in that a mix of urban and rural economies characterizes the municipal area of jurisdiction, thus ranging from a relatively strong economic performance to relatively isolated rural settlements with high levels of poverty. As a municipality, it has a specific coordination and facilitation responsibilities, which need to be addressed in an innovative manner to initiate and promote integrated and sustainable LED as well as to attract investments.

The municipality’s LED Strategy its purpose is to collate all economic information and investigate the coordinated and integrated options and opportunities available to broaden the economic base of the study area, packaged as a strategic implementation framework in order to address the creation of employment opportunities, investment and business development and the resultant positive spin-off effects throughout the district economy.

Some of the critical relevant economic activities within the main economic sectors are Agriculture, Mining, Manufacturing, Trade and Tourism. The Standard Industrial Classification does not define Tourism as an economic sector, but because it is such an important industry in terms of potential job creation. Local Economic Development aims to address and reduce Poverty alleviation through introducing sustainable projects and job creation in wards.

There is a growing need for LED projects especially within our rural communities. Almost 50% of the wards have prioritized the provision of LED projects, especially in the area of small scale commercial farming with the potential for income-generation and the reduction of unemployment.

“The NDP contains proposals for tackling the problems of poverty, inequality and unemployment. It is a roadmap to a South Africa where all will have water, electricity, sanitation, jobs, housing, public transport, adequate nutrition, education, social protection, quality healthcare, recreation and a clean environment.”

COMMENT ON LOCAL JOB OPPORTUNITIES:

Local Economic Development aims to address and reduce Poverty alleviation through introducing sustainable projects and job creation in wards 35 wards. The 16 entrepreneur were supported on greening project including school.

Job creation through Extended Public Works Programme (EPWP)projects Details

EPWP Projects Jobs created through EPWP projects

No. No.

2014/15 7 500

2015/16 7 500

2016/17 6 250

2017/18 6 250

2018/19 6 350

Development projects.

Annual Performance Target 2017/18

Annual actual Performance 2017/18

Annual Performance Target 2017/18

Annual Performance Target 2018/19

Annual actual Performance 2018/19

Annual Performance Target 2019/20

Annual Performance Target 2020/21

Annual Performance Target 2021/22 Number of

farming of farming projects supported

20 farming supported by 30 June 2018

Not Achieved 7 farming projects supported

20 farming supported by 30 June 2018

20 farming projects supported by30 June 2019

Not achieved 10 farming projects supported through visitation

Not applicable Not

applicable Not applicable

Number of Tourism Stakeholder consultation

Not applicable Not

applicable Not

applicable 4 Tourism Stakeholders Consultations by 30 June 2019

Target exceeded 14 Tourism Stakeholder consultation

Not applicable Not

applicable Not applicable

Number of Heritage Tours held

Not applicable Not

applicable Not

applicable 2 Heritage Tours held by 30 June 2019

Not achieved 1 Heritage Tours held

Not applicable Not

applicable Not applicable Number of

SMMES trained

45 SMMEs trained by 30 June 2018

Target exceeded 113 SMMEs trained

45 SMMEs trained by 30 June 2018

60 SMMEs Trained by 30 June 2019

Not achieved 10 SMMEs Trained

60 SMMEs Trained by 30 June 2020

Not applicable Not applicable

Annual Performance Target 2017/18

Annual actual Performance 2017/18

Annual Performance Target 2017/18

Annual Performance Target 2018/19

Annual actual Performance 2018/19

Annual Performance Target 2019/20

Annual Performance Target 2020/21

Annual Performance Target 2021/22 Number of

workshop with Sector Held

2 Workshop with other sectors held by 31 March 2018

Target Exceeded 4 Workshop with other sectors held

2 Workshop with other sectors held by 31 March 2018

2 workshop with Sector Held by 30 June 2019

Not achieved 1 workshop with Sector Held

Not applicable Not

applicable Not applicable

Number of Tourism Policies Reviewed &

Adopted

Tourism Policy reviewed and adopted by 30 June 2018

Not Achieved No Tourism Policy reviewed and adopted

Tourism Policy reviewed and adopted by 30 June 2018

1 Tourism Policy Reviewed &

Adopted by 31 March 2019

Not Achieved No Tourism Policy Reviewed &

Adopted

Not applicable Not

applicable Not applicable

Number of SMMES Supported through LED Initiatives

20 SMMEs supported through LED by 30 June 2018

Not Achieved 2 SMMEs supported through LED

20 SMMEs supported through LED by 30 June 2018

20 SMMES Supported through LED Initiatives by 30 June 2019

Not Achieved

19 SMME's 20 SMMES Supported through LED Initiatives by 30 June 2020

Not applicable Not applicable

Annual Performance Target 2017/18

Annual actual Performance 2017/18

Annual Performance Target 2017/18

Annual Performance Target 2018/19

Annual actual Performance 2018/19

Annual Performance Target 2019/20

Annual Performance Target 2020/21

Annual Performance Target 2021/22 Number of

Reports on Informal Street Traders Licensed

4 reports on informal street traders licensed by 30 June 2018

Not Achieved 1 reports on informal street traders licensed

4 reports on informal street traders licensed by 30 June 2018

60 Reports on Informal Street Traders Licensed by 30 June 2019

REMOVED KPI is operational and is moved to the Departmental work plan

Not applicable Not

applicable Not applicable

Number of MRRRP Meetings Attended

4 MRRRP meeting attended

Not Achieved No MRRRP meeting attended

4 MRRRP meeting attended

4 MRRRP Meetings Attended by 30 June 2019

REMOVED KPI is operational and is moved to the Departmental work plan

Not applicable Not

applicable Not applicable

Number of Heritage Celebration

Not applicable Not

applicable Not

applicable 1 Heritage Celebration by 31 March 2019

Not Achieved No Heritage Celebration

Not applicable Not

applicable Not applicable

Annual Performance Target 2017/18

Annual actual Performance 2017/18

Annual Performance Target 2017/18

Annual Performance Target 2018/19

Annual actual Performance 2018/19

Annual Performance Target 2019/20

Annual Performance Target 2020/21

Annual Performance Target 2021/22 Number of

Sports, Arts &

Culture Activities Supported

1 Sports, Arts, cultural development supported by 31 December 2017

Target exceeded 4 Sports, Arts, cultural development supported

1 Sports, Arts, cultural development supported by 31 December 2017

3 Sports, Arts

& Culture Activities Supported by 31 December 2018

Achieved 3 Sports, Arts and culture activities supported

3 Sports, Arts

& Culture Activities Supported by 31 December 2019

Not applicable Not applicable

Number of Mayoral Games Held

Not applicable Not

applicable Not

applicable 1 Mayoral Games Held by 30 June 2019

Not Achieved No Mayoral Games Held

Not applicable Not

applicable Not applicable

Number of LED Strategy Reviewed &

Adopted

Not applicable Not

applicable Not

applicable 1 LED Strategy Reviewed &

Adopted by June 2019

Not Achieved No LED Strategy Reviewed &

Adopted

Not applicable Not

applicable Not applicable

contributed almost R146m (3.5%) to the total GDP for 2004. Between 2001 and 2004, strong growth (6.6% p.a.) was reported for the local agricultural sector.

The function of economic planning / development within the municipality is administered as follows and includes:

1. Marketing & Tourism Management 2. Project Management in Agriculture

These services extend to include economic development, but do not take account of economic development which resides within the jurisdiction of District Municipality and North West Provincial Government. The municipality has a mandate to capacitate and support SMME’s.

The Strategic objective of this function is to train SMMEs on tendering, business management and marketing.

This component includes: Office of the Mayor; office of the speaker; Councilors; and Municipal Manager.

INTRODUCTION TO EXECUTIVE AND COUNCIL

During the financial year under review the Council consisted of 69 councillors; made up of 35 ward councillors and 34 proportional councillors. Political decisions were taken in a form of council resolution.

Target Annual

Performance Target 2017/18

Annual actual Performance 2017/18

Annual Performance Target 2017/18

Annual Performance Target 2018/19

Annual actual Performance 2018/19

Annual Performance Target 2019/20

Annual Performance Target 2020/21

Annual Performance Target 2021/22 To manage

and coordinate municipal strategic planning

Number of Community and stakeholder consultation meetings on the draft IDP and Budget coordinated per ward

35 wards Community and stakeholder consultation meetings on the draft IDP and budget coordinated by 30 April 2018

Achieved 2 wards community consultation meetings held on IDP

35 wards Community and stakeholder consultation meetings on the draft IDP and budget coordinated by 30 April 2018

35 wards Community and stakeholder consultation meetings on the draft IDP and budget coordinated by 30 April 2019

Not Achieved 2 clustered IDP consultation meeting coordinated for 35 wards Community and stakeholder

2 Community and stakeholder consultation meeting on the draft IDP and budget coordinated by 30 April 2020

Not applicable Not applicable

Number IDP/Budget Steering Committee meetings coordinated by 30 May 2019

3 IDP/Budget Steering Committee meetings coordinated by 30 May 2018

Achieved 1 IDP/Budget Steering Committee meetings coordinate

3 IDP/Budget Steering Committee meetings coordinated by 30 May 2018

2 IDP/Budget Steering Committee meetings coordinated by 30 May 2019

Not Achieved 1 IDP/Budget Steering Committee meetings coordinated

Not applicable Not applicable Not applicable

Annual Performance Target 2017/18

Annual actual Performance 2017/18

Annual Performance Target 2017/18

Annual Performance Target 2018/19

Annual actual Performance 2018/19

Annual Performance Target 2019/20

Annual Performance Target 2020/21

Annual Performance Target 2021/22 Number IDP

Rep Forum meetings coordinate by 30 June 2019

3 IDP Rep Forum meetings coordinate by 30 June 2018

Not achieved 2 IDP Rep Forum meetings coordinate

3 IDP Rep Forum meetings coordinate by 30 June 2018

2 IDP Rep Forum meetings coordinate by 30 June 2019

Not Achieved No IDP Rep Forum meetings coordinate

2 IDP Rep Forum meetings coordinate by 30 June 2020

Not applicable Not applicable

Number of reports on the functionality of ward committees

12 Reports on the functionality of ward committees by 30 June 2018

Achieved 12 Reports on the functionality of ward committees

12 Reports on the functionality of ward committees by 30 June 2018

12 reports on the functionality of ward committees by 20 June 2019

Achieved 12 reports on the functionality of ward committees by 30 June 2019

Not applicable Not applicable Not applicable

Number of wards held ward committee meetings

35 wards committee meetings facilitated by 30 June 2018

Target exceeded 109 wards committee meetings facilitated

35 wards committee meetings facilitated by 30 June 2018

420 ward committee meetings held by 30 June 2019

Not Achieved 84 ward committee meetings held

420 ward committee meetings held by 30 June 2020

Not applicable Not applicable

Annual Performance Target 2017/18

Annual actual Performance 2017/18

Annual Performance Target 2017/18

Annual Performance Target 2018/19

Annual actual Performance 2018/19

Annual Performance Target 2019/20

Annual Performance Target 2020/21

Annual Performance Target 2021/22 Number of

council meetings held

4 council meetings held by 30 June 2018

Achieved 4 ordirnary council meetings held

4 council meetings held by 30 June 2018

4 council meetings held by 30 June 2019

Target exceeded 4 Ordinary Council held on 30 May 2019 ; 10 June 2019. 19th December 2018, 30th August 2018 7 special council meetings held on 04 April 2019;11 April 2019,

17/01/2019;31 /01/2019;28/0 2/2019.04/10/

2018;23/11/20 18;05/12/2018

4 council meetings held by 30 June 2020

Not applicable Not applicable

Annual Performance Target 2017/18

Annual actual Performance 2017/18

Annual Performance Target 2017/18

Annual Performance Target 2018/19

Annual actual Performance 2018/19

Annual Performance Target 2019/20

Annual Performance Target 2020/21

Annual Performance Target 2021/22 Number of

Portfolio committee meetings held

Not applicable Not applicable Not applicable 28 Portfolio committee meetings held by 30 June 2019

Not Achieved 7 Portfolio committee meetings held

Not applicable Not applicable Not applicable

Number of Imbizos held by Executive Mayor

2 Imbizos held by Executive Mayor by 30 June 2018

Achieved 2 Imbizos held by Executive Mayor

2 Imbizos held by Executive Mayor by 30 June 2018

4 Imbizos held by Executive Mayor by 30 June 2019

Not Achieved No Imbizos held by Executive Mayor

Not applicable Not applicable Not applicable

Provide Institutional Performan ce Manageme nt

Number Quarterly report submitted to council within 30 days after the end of each quarter

4 Quarterly report submitted to council within 30 days after the end of each quarter

Not achieved 4 Quarterly report submitted to council but not within 30 day after the end of each quarter

4 Quarterly report submitted to council within 30 days after the end of each quarter

4 Quarterly report submitted to council within 30 days after the end of each quarter

Not Achieved 1 Quarterly report (period:

Oct 18-dec 18)submitted to council within 30 days after the end of each quarter

Not applicable Not applicable Not applicable

Annual Performance Target 2017/18

Annual actual Performance 2017/18

Annual Performance Target 2017/18

Annual Performance Target 2018/19

Annual actual Performance 2018/19

Annual Performance Target 2019/20

Annual Performance Target 2020/21

Annual Performance Target 2021/22 Number of

Back to Basics reports compiled and submitted to COGTA

Not applicable Not applicable Not applicable 12 Back to Basics reports compiled and submitted to COGTA by 30 June 2019

Achieved 12 Back to Basics reports compiled and submitted to COGTA

Not applicable Not applicable Not applicable

Timeous submission of Section 72 (Mid-term )Report to Council

Timeous submission of Section 72 (Mid-term )Report to Council by 31 January 2018

Achieved Section 72 (Mid-term ) report submitted to council

Timeous submission of Section 72 (Mid-term )Report to Council by 31 January 2018

Timeous submission of Section 72 (Mid-term )Report to Council by 31 January 2019

Achieved Timeous submission of Section 72 (Mid-term )Report to Council

Not applicable Not applicable Not applicable

Timeous tabling of 2017/2018 Draft Annual Report to council

Timeous tabling of 2016/17 Draft Annual Report to council by 31 January 2018

Achieved 2016/17 Annual report tables in council

Timeous tabling of 2016/17 Draft Annual Report to council by 31 January 2018

Timeous tabling of 2017/2018 Draft Annual Report to council by 31 January 2019

Achieved Timeous tabling of 2017/2018 Draft Annual Report to council

Timeous tabling of 2018/2019 Draft Annual Report to council by 31 January 2020

Not applicable Not applicable

Annual Performance Target 2017/18

Annual actual Performance 2017/18

Annual Performance Target 2017/18

Annual Performance Target 2018/19

Annual actual Performance 2018/19

Annual Performance Target 2019/20

Annual Performance Target 2020/21

Annual Performance Target 2021/22 Number of IDP

report

developed and reviewed

1 IDP report developed and reviewed by 30 June 2018

Achieved 1 IDP report developed and reviewed

1 IDP report developed and reviewed by 30 June 2018

1 IDP report developed and reviewed by 30 June 2019

Achieved 1 IDP report developed and reviewed

1 IDP report developed and reviewed by 30 June 2020

Not applicable Not applicable

To provide oversight role

Number of MPAC reports to council

Not applicable Not applicable Not applicable 2 MPAC reports to council by 30 June 2019

Achieved 2 MPAC reports to council

Not applicable Not applicable Not applicable

Number of consultation meeting with stakeholders on oversight report

Not applicable Not applicable Not applicable 4 consultation meeting with stakeholders on oversight report by 30 June 2019

Achieved 4 consultation meeting with stakeholders on oversight report

Not applicable Not applicable Not applicable

district municipality through shared services.

municipal budget performance on a monthly basis and during the mid-year assessment respectively.

There is an urgent need to focus on the governance, decision making and financial management to deal with budgeting, tariff setting, revenue collection, customer services, operations and maintenance of infrastructure asset management. The relationship between financial management and financial viability remain a challenging factor and the focus on the next financial year will be on maintaining a balance between financial management and viability. The focus on financial viability will be on revenue enhancement including debt management

The Finance unit is broadly comprised of Revenue section, Expenditure section, Budget section Salaries section, and Data processing and Supply Chain Management section, leaded by the Chief Financial Officer.

The highest most priority was to provide sound financial viability and sustainability.

- The Annual Financial Statement was timeously submitted to the Office of the Auditor General of South Africa.

- 4 Section 52 (Quarterly) Reports submitted to Council

The challenge faced was that the Revenue Enhancement strategy was not developed and the unit could not measure revenue growth.

Annual Performance Target 2017/18

Annual actual Performance 2017/18

Annual Performance Target 2017/18

Annual Performance Target 2018/19

Annual actual Performance 2018/19

Annual Performance Target 2019/20

Annual Performance Target 2020/21

Annual Performance Target 2021/22 To promote

accountability and

transparency

Timeous Submissions of Annual Financial Statement to Office of the Auditor General (Section 126 MFMA)

Timeous Submissions of Annual Financial Statement to Office of the Auditor General by 31 August 2017

Achieved Annual financial Statements were submitted to the Office of the Auditor General

Timeous Submissions of Annual Financial Statement to Office of the Auditor General by 31 August 2017

Timeous Submissions of Annual Financial Statement to Office of the Auditor General by 31st August 2018

Achieved Annual financial Statements were submitted to the Office of the Auditor General

Timeous Submissions of Annual Financial Statement to Office of the Auditor General by 31st August 2019

Not applicable Not applicable

2019/2020 Budget tabled within

legislated timelines and tariffs

2018/2019 Budget tabled within 30 days before the start of the new budget year

Achieved Budget tabled in council on 28 May 2018

2018/2019 Budget tabled within 30 days before the start of the new budget year

2019/2020 Budget tabled and approved within legislated timelines and tariffs by 30 March 2019

Achieved 2019/2020 Budget tabled within

legislated timelines and tariffs by 30 March 2019

2020/2021 Budget tabled and approved within legislated timelines and tariffs by 30 March 2020

Not applicable Not applicable

Annual Performance Target 2017/18

Annual actual Performance 2017/18

Annual Performance Target 2017/18

Annual Performance Target 2018/19

Annual actual Performance 2018/19

Annual Performance Target 2019/20

Annual Performance Target 2020/21

Annual Performance Target 2021/22 2019/2020

Budget related policies approved by Council within the legislated timeline

2018/2019 Budget related policies and tariffs approved by Council within 30 days before the start of the budget year

Achieved Budget related policies and tariffs approved by Council on 29 May 2018

2018/2019 Budget related policies and tariffs approved by Council within 30 days before the start of the budget year

2019/2020 Budget related policies approved by Council within the legislated timeline by 30 May 2019

Not achieved The 2019/2020 Budget related policies approved by Council on the 10th June 2019

2020/2021 Budget related policies approved by Council within the legislated timeline by 30 May 2020

Not applicable Not applicable

Number of Section 71 Reports submitted to the Mayor and National treasury within legislative timeline

12 Section 71 Reports submitted to the Mayor and Provincial treasury within 10 working days after the end of the month (Income and

Achieved 12 Section 71 Reports submitted to the Mayor and Provincial treasury within 10 working days after the end of the month

12 Section 71 Reports submitted to the Mayor and Provincial treasury within 10 working days after the end of the month (Income and

12 Section 71 Reports submitted to the Mayor and National treasury within legislative timeline by

Achieved 12 Section 71 Reports to be submitted to the Mayor and National treasury within legislative timeline

12 Section 71 Reports submitted to the Mayor and National treasury within legislative timeline by

Not applicable Not applicable

Annual Performance Target 2017/18

Annual actual Performance 2017/18

Annual Performance Target 2017/18

Annual Performance Target 2018/19

Annual actual Performance 2018/19

Annual Performance Target 2019/20

Annual Performance Target 2020/21

Annual Performance Target 2021/22

reports) reports)

Number of Section 52 Reports submitted to Council within 30 days after end of each quarter

Not applicable Not

applicable Not

applicable 4 Section 52 Reports submitted to Council within 30 days after end of each quarter

Achieved 4 Section 52 Reports submitted to Council within 30 days after end of each quarter

4 Section 52 Reports submitted to Council within 30 days after end of each quarter

Not applicable Not applicable

Annual Performance Target 2017/18

Annual actual Performance 2017/18

Annual Performance Target 2017/18

Annual Performance Target 2018/19

Annual actual Performance 2018/19

Annual Performance Target 2019/20

Annual Performance Target 2020/21

Annual Performance Target 2021/22 2018/2019

Mid-year budget assessment report prepared and submitted to council and National Treasury by the 25th Jan 2019 (section 72)

2017/18 mid- year budget assessment report prepared and submitted to the Executive Mayor, National Treasury &

Provincial Treasury by 25 January 2018

Achieved 2017/18 mid- year budget assessment report prepared and submitted to the Executive Mayor, National Treasury &

Provincial Treasury

2017/18 mid- year budget assessment report prepared and submitted to the Executive Mayor, National Treasury &

Provincial Treasury by 25 January 2018

2018/2019 Mid-year budget assessment report prepared and submitted to council and National Treasury by the 25th Jan 2019 (section 72)

Achieved 2018/2019 Mid- year budget assessment report prepared and submitted to council and National Treasury by the 25th Jan 2019 (section 72)

2019/2020 Mid-year budget assessment report prepared and submitted to council and National Treasury by the 25th Jan 2020 (section 72)

Not applicable Not applicable

2018/2019 Adjustment Budget approved by Council within the legislated timeline

2017/2018 Adjustment Budget approved by Council by 28 February 2018

Achieved 2017/2018 Adjustment Budget approved by Council

2017/2018 Adjustment Budget approved by Council by 28 February 2018

2018/2019 Adjustment Budget approved by Council within the legislated timeline by 31 March 2019

Achieved 2018/2019 Adjustment Budget approved by Council within the legislated timeline by 31

2019/2020 Adjustment Budget approved by Council within the legislated timeline by 31 March 2020

Not applicable Not applicable