Programme Implementation: Capacity Issues

Dalam dokumen DEVELOPMENT FRAMEWORK (Halaman 153-158)

Employment Profile

2.4 Climate Change

2.7.13 Programme Implementation: Capacity Issues

153 2.7.12 Programme Impacts: Spatial & Social Transformation

Of keen interest are the impacts of the programme on spatial and social transformation.

Key Programme Spatial and Social Transformation Benefits

Mega-Projects

 Creation of new rental and ownership residential stock

 Provision of core, social, and economic infrastructure

 Improved connectivity to the urban network

 Improved PT thresholds

Incremental Services

 Tenure security

 Inclusion of the poor and Provision of core and social infrastructure

 Eradication of core infrastructure backlogs

 Improved connectivity to the urban network Institutional and

Social Housing  Creation of new rental and ownership residential stock

 More efficient use of core and social infrastructure Affordable Housing

In-Situ Upgrades and Greenfields

 As for Incremental Services

 Creation of residential ownership stock

154 2.7.14 Programme Implementation Responsibilities for the Key Programmes

Discrete programme implementation responsibilities are spread across several line departments, as well as across some external parties.

Generally the Human Settlements Unit assumes the lead role to Select Projects, Prepare Concepts, and Acquire Land, and take the Top-structure elements to Construction.

For the Core Infrastructure elements of where land development is a requirement (typically in Mega- Projects, Incremental Services, Upgrades and In Situs) , generally there is a delegation of responsibility and authority to Development Engineering to Design in Detail, Go to Tender and to Construct.

Key

Programme

Select Projects

Prepare Concepts

Acquire Land

Design in Detail

Tender and Construct

Fund Capex

Operate and Maintain

Mega-Projects EH

EM

EH EM

EH EM

EH Others [7]

EH

Others [8] Various [9] Line Various [10]

Incremental Services

EH EH EH

Dev Eng Dev Eng USDG Line Institutional and

Social Housing

SHI EH

SHI

EH Various [11] SHI Line

Affordable Housing Private Private Various [12] Private

In-Situ Upgrades and Greenfields

EH Dev Eng

EH Dev Eng

USDG

HSDG Line

Key

EH eThekwini Housing/Human Settlements Unit

EM eThekwini Municipality (inclusive of all service units as required) Dev Eng Development Engineering

SHI Social Housing Institution

USDG Urban Settlement Development Grant HSDG Housing Settlement Development Grant

7 Development Engineering, SocialHousing Institutions, Private Sector, Dept Public Works

8 *Social Housing Institutions, Private Sector, Dept Public Works

9 Urban Settlement Development Grant, Human Settlement Development Grant, Community Residential Units, Social Housing Restructuring Grant, Equity, Loans

10 Social Housing Institutions, Private Sector, Dept Education, Dept Health

11 Urban Settlement Development Grant, Human Settlement Development Grant, Community Residential Units, Social Housing Restructuring Grant, Equity, Loans

12 Ibid

155 2.7.15 Program Implementation: Capital Budgets

Programme 2016-17

Rm

2017-18 Rm

2018-19 Rm

MTEF Rm

Mega Projects Varies Varies Varies 2.916

Incremental Services

Community Ablution Blocks 259 211 250 720

Community Access 90 90 90 270

Electricity 11 16 40 67

Social Facilities 0 0 0 0

Sustainable Livelihoods 0 0 0 0

Institutional and Social Housing 0 0 0 0

Affordable Housing 0 0 0 0

In-Situ Upgrades and Greenfields

Topstructures 644 739 803 2,159

Core infrastructure 405 396 405 1,205

TOTAL 1,409+ 1,452+ 1,588+ 7,337

Challenges in financing the Key Programmes include:

Lack of year-by-year certainty for Mega-Projects, mainly due to many of them being in the early phases of the Programme and Project Lifecycle.

A need for greater quantums for the Incremental Services programme, particularly for Community Access and Electricity Sub-Programmes.

Absences of budget for Social Facilities and Sustainable Livelihoods under the Incremental Services Programme, mainly attributable to the absence and-or non-integration of Sub-programme Descriptions.

Absences of budget for Institutional and Social, and Affordable Housing, mainly due to a need to re-conceptualise the Programme Descriptions.

Better matching of budget to ensure that construction of Core Infrastructure keeps up with Topstructure construction.

Spatial Reference

The Human Settlements Unit utilises a prioritisation model in developing its project pipeline. The model principally prioritises housing projects according to location. It is applied to all types of housing projects namely Greenfields and Upgrading Projects, but not to Rural projects. The following criteria have been developed to assess the locations of future projects:

 Bulk Infrastructure Costs

 Personal Travel Costs

 Integrated Rapid Public Transport Network (IRPTN)

 Employment and Economic Opportunities

 Basic Social Facilities (Primary/Secondary Education and Health Care)

 The Urban Development Line (UDL)

156 Improved locations of housing and improved accessibility, especially of low-income housing, is a major goal of the Housing Sector Plan. High scoring projects are generally located within the Prime Corridor and Dense Urban ICDG Zones.

Having incorporated the criteria into a Geographic Information System (GIS) and utilising a scoring matrix, a priority list of informal settlements earmarked for upgrade projects was generated for instance. The rationale was for the housing delivery programme to work its way from the top of the list viz. selecting those settlements that were least costly to implement from a bulk infrastructure perspective and those that were fairly well located. On the other hand, settlements that did not score so well on the matrix viz. those at the bottom of the list (where the affected households would have had to wait longer for a housing intervention) were identified for the Incremental Services programme.

The idea being that as both the housing delivery programme and the Incremental Services programme work their way from the top and bottom of the list respectively, they will eventually meet somewhere in the middle having covered all settlements with some form of intervention.

The following lists and maps (attached as Annexure 13) represent the Human Settlement Projects completed, underway and proposed:

1. MTEF List of Human Settlements Projects (including Housing Infrastructure and Incremental Services)

2. Map: 2016/17 BNG Projects 3. Map: 2017/18 BNG Projects 4. Map 2018/19 BNG Projects 5. List of Informal Settlements 6. List of Greenfield Projects 7. List of Social Housing Projects 8. List of Special Housing Projects

Broad Challenges to Housing Delivery

 Available funding versus the demand for housing within the City.

 The current housing subsidy quantum does not take into account or cover the escalating costs for certain key aspects such as steep terrain, retaining walls and densification.

 Unavailability of Bulk infrastructure (sewer, water, electricity and roads) and/or aging infrastructure especially in historical projects.

157 2.8 Social Facilities at eThekwini Municipality

Social facilities are publicly and privately owned and operated properties and/or services which are publicly accessible, which deal with social development and socio-economic development, and which are necessary components of sustainable human settlements. Social facilities include:

 Health

 Fire Protection and Emergency Services

 Police

 Education

 Sports and Recreation

 Social Grants

 Cemeteries

 Government Offices

Improved quality of life for eThekwini citizens means that they are able to enjoy equitable opportunities to participate in culture, leisure and education, such as those that are available through community facilities. Ensuring full service provision of community facilities needs to be closely guided by service standards, and requires the necessary operating funds to sustain these facilities on a day to day basis.

The provision of community facilities and services is guided by the standards developed by municipal line departments and are based on a combination of national norms and the ability to sustain these standards given municipal budget constraints.

An Access Model has been developed to match the demand for facilities, based on population numbers and income and age profiles, with the supply and capacity of facilities geographically. The social services currently included in the Access Model are Primary Health Clinics, Community Health Centres, Primary Schools, Secondary Schools, Libraries, Fire Services, Community Halls, Sports Fields, Indoor Sports Halls, Sports Stadia, Swimming Pools, Cemeteries, Parks, and Police.

This assessment shows the nature and extent of facility backlogs across the Municipality and all requests for the construction of new facilities are currently being assessed within this context.

158 2.8.1 Service Levels and Backlogs

Table 4: Current Levels of Service for Social Facilities According to the Access Model, the

current levels of service for social facilities are as shown alongside. A capital development program is in the design phase to respond to the most critical under-provisions of service.

Overcoming under-provision in security, fire protection, health care, education (including libraries), cemeteries and basic recreation are likely to be prioritised.