Summary of Engineering risk assessment findings

Equipment area Control Significant shortcomings noted Comment

Winder general protection around machinery area no demarcation of machinery area provide handrails and demarcation guards no guards on chain drives eg to indicator provide guards

availability of spares and service one mine experienced problems consider replacing problem components

Winding rope visual examination a short length of rope above the splice was covered by a plastic pipe sleeve to prevent abrasion of the rope

ensure that the full length of rope is open for inspection

on a stage winder the sections of rope around the stage sheaves are not easily inspected

consider making guards easily removable

shortage of staff to undertake inspections review work process and manning needs

measurement and inspection not used in some installations consider need for this control magnetic rope testing not used in some installations consider need for this control frequency of test not the same front end cut and load test not used in some installations consider need for this control

frequency of test not the same proper design of installation to

promote good coiling

poor coiling needed constant attention from engineering staff

investigate use of deflecting sheave to improve coiling

Summary of Engineering risk assessment findings (contd)

Equipment area Control Significant shortcomings noted Comment

Braking system design of links and pins no provision to lubricate pins pins showing signs of wear in heavy use application

design modification required repair and maintenance brake screwdown post poorly repaired maintain engineering standards inspection of links and pins unable to easily remove pins for inspection

(especially the lower caliper pins) NDT not used on some installations

future designs must facilitate removal and improve access to this area

consider use of NDT procedures Braking system

(contd)

testing of main brake by driver not tested against specified ammeter reading

tested using conveyance load in shaft

ensure that ammeter is visible to driver, specify reading and test procedure

testing of emergency brake by electrician

not tested specify and follow procedure

Conveyances

attachments visual inspection not always done by trained staff review work practices

NDT not used in some installations consider need for this control

proper design of attachment components

some attachment pins are of unknown design and manufacture

ensure proper design and manufacture

spare attachment sets available spare sets not always readily available provide spare attachment sets

Summary of Engineering risk assessment findings (contd)

Equipment area Control Significant shortcomings noted Comment

Conveyances (contd)

structure visual inspection some material cars are not inspected before use to ensure suitability for use on incline

improve inspection procedures

not always done by trained staff review work practices proper design some material cars are not designed for

use on incline

consider standardising on car and coupling design

safety door provided at rear of transporter conveyance

door easily damaged during loading/unloading of material cars

review design and maintenance needs

load and safety slings

regular inspection not always over-inspected by engineering staff

review work practice change slings regularly service life not always monitored and

recorded

institute management system spare slings available spare slings not always available ensure spare slings available proper sling attachment points car couplings are often used to attach

safety slings. Non-standard couplings can prevent safe sling attachment

standardise sling attachment points

safety sprag Blair device provided may not function properly due to damage and poor maintenance

ensure proper maintenance and check operation

Summary of Engineering risk assessment findings (contd)

Equipment area Control Significant shortcomings noted Comment

Safety trips and interlocks

visual does not check functionality functional test recommended

functional test not always done ensure proper test

consider over-inspection necessary devices provided and in

working order

devices fitted additional to legal requirements not operational

some devices considered necessary not provided or operational

consider repairing or removing non-functioning devices ensure proper installation and operation

Electrical equipment incl signaling systems

proper design and installation on some systems it was possible to

instruct the driver to move the conveyance when located on another station

review design and installation of lock bell system

consider installation of bell/brake interlock

electrical devices on sinking stage subject to water ingress and corrosion

review design and installation Stations and station

equipment

proper design and layout some dropset support steelwork could be damaged by overloaded cars

slack rope sometimes occurs when conveyance on dropsets

check design of dropset layout, review loading controls

check design of dropset layout to avoid slack rope as far as possible provision of safety drop rails not always properly installed or maintained ensure correct installation and

maintenance safety devices to be operated from

a safe location

safety devices were sometimes operated from an unsafe location

review designs

Summary of Engineering risk assessment findings (contd)

Equipment area Control Significant shortcomings noted Comment

Stations and station equipment (contd)

Proper illumination some stations were poorly illuminated provide illumination to Industry standards

Design of station excavation at some shaft bottom stations a runaway car would exit onto the station

some layouts permit slack rope when car being moved into shaft

excavation could be extended to provide a “dead-end” at shaft bottom initial layouts should avoid this feature Shaft equipment regular inspection and

maintenance

not always sufficient time allocated for this activity

review shaft schedules and work practice

properly installed shaft ladderway some travelling ways require improvement review design and installation safety devices such as safety drop

sets

non-operational or poorly installed check installation and maintenance