• Tidak ada hasil yang ditemukan

Directory UMM :Data Elmu:jurnal:I:International Journal of Production Economics:Vol69.Issue2.Jan2001:

N/A
N/A
Protected

Academic year: 2017

Membagikan "Directory UMM :Data Elmu:jurnal:I:International Journal of Production Economics:Vol69.Issue2.Jan2001:"

Copied!
16
0
0

Teks penuh

Loading

Gambar

Fig. 1. The links between customer need assessment, productdevelopment processes and strategic planning processes [8].
Table 1Description of individual need assessment tools170
Table 2
Table 3

Referensi

Dokumen terkait

animal, regulation of neonatal growth and develop- division on udder and muscle development, and meat. ment of gastrointestinal function

The challenge for a company is not only how to continue to maintain a technically advanced and competitive product but also how to reduce the design, development and manufacturing

The combined preference priorities are calculated as follows: (1) the preference priority given by a certain customer to a certain service element is multiplied by the

The average number of parallel resources, the average number of processing steps, the standard deviation in the processing times, the average overlap and the workload balance are

The focus will be on the corporate level use of administrative means of con- trol to in # uence the volume and direction of invest- ments in some major professional service

Department of Industrial Engineering Instituto Tecnolo & gico y de Estudios Superiores de Monterrey, ITESM, Campus Monterrey, Me & xico,

In this paper we develop a variant of the modular bill of material, called the hierarchical pseudoitem Bill of Material, which is the mirror image of the choice tree in the generic

Previous extensions to the SPP include, in separate models, the simultaneous determination of the optimal price and quantity when demand is price-dependent, and the determination of