Ardani. 2009. Analisa Penerapan Manajemen Waktu Pada Proyek Konstruksi Jalan [Skripsi]. Sumatera Utara (ID): Universitas Sumatera Utara.

Astina DC, Widhiawati IA, Joni IG. 2012. Analisis faktor-faktor penyebab keterlambatan pelaksanaan pekerjaan proyek konstruksi di Kabupaten Tabanan. J Ilm Elektr Infrast Tek Sip. Denpasar (ID): Universitas Udayana. Badri S. 1997. Dasar-dasar Network Planing. Jakarta (ID): PT Rika Cipta.

Clough RH, Sears, Glenn A. 1991. Construction Management. Canada (US): John Willey & Sons Inc.

Callahan MT. 1992. Contruction Proyect Scheduling. New York (US): Mc Graw Hill.

Handoko TH. 1999. Dasar-dasar Manajemen Produksi dan Operasi, Edisi Pertama. Yogyakarta (ID): BPFE.

31 Heizer J, Barry R. 2005. Manajemen Operasi. Jakarta (ID): Salemba Empat.

Hergunsel M. 2011. Benefits Of Building Information Modeling For Construction Managers And Bim Based Scheduling. [Tesis]. Worcester (US): Graduate Program, Worcester Polytechnic Institute.

Jiang X. 2011. Development in Cost Estimating and Scheduling in BIM Technology

[Tesis]. Boston (US): Graduate Program, Northeastern University.

Kezner H. 1982. Project Management for Executive. New York (US):Van Nostrand Reinhold Company.

[KPU] Kementrian Pekerjaan Umum. 2012. SNI Analisis Harga Satuan Pekerjaan. Jakarta (ID): KPU.

Kraiem ZK, Dickmann JE. 1987. Concurrent delays in construction projects. J of

Constr Engin and Manag. 113(4):591-602.

Khemlani L. 2008. “Tekla Structures 15”, AECbytes Product Review. [Internet]. [diunduh 2015 Mei 1]. Tersedia pada: http://www.aecbytes.com/review/2008/ TeklaStructures15.html.

Mertha J, Diah PD. 2007. Analisa penjadwalan proyek menggunakan rangked positional weight method (studi kasus : proyek pembangunan pasar mumbul di kabupaten buleleng). J Ilm Tek Sip, 11(2):100 – 108.

Lynna P, Syafriandi. 2006. Aplikasi Microsoft Project untuk Penjadwalan Kerja

Proyek Teknik Sipil. Yogyakarta (ID): Penerbit Andi.

Matondang Z, Mulyana R. 2012. Konstruksi Bangunan Gedung. Medan (ID): UNMED Press.

Nurrafidin R. 2014. Monitoring dan Evaluasi Kinerja Waktu menggunakan Software Tekla pada Pembangunan Lantai 1-36 Chase Tower, Jakarta. [Skripsi]. Bogor (ID): Institut Pertanian Bogor.

Ridho MR, Syahrizal. 2013. Evaluasi Penjadwalan Waktu dan Biaya Proyek dengan Metode PERT dan CPM (Studi Kasus : Proyek Pembangunan Gedung Kantor Badan Pusat Statistik Kota Medan Di Jl. Gaperta Medan, Sumatera Utara. [Skripsi]. Medan (ID): Universitas Sumatera Utara.

Schwalbe K. 2006. Information Technology Project Managemen. Edisi ke-4. Boston Massachusetts (US): Couerse Technology.

Soeharto I. 1995. Manajemen Proyek dari Konseptual Sampai Operasional. Jakarta (ID): Erlangga.

Soeharto I. 2001. Manajemen Proyek dari Konseptual Sampai Operasional. Jilid 2.

Edisi ke-2. Jakarta (ID): Erlangga.

Tan PW, Dissanayake PB. 1998. Construction project scheduling by rangked positional weight method. Canadian J of Civil Engin. 25:424 – 436.

Tekla. 2011. Tekla Structure 17 Hardware Recommendation. Espoo (FI) :Tekla Corporation.

Tolangi MF, Rantung JP, Langi JE, Sibi M. 2012. Analisis cash flow optimal pada kontraktor proyek pembangunan perumahan. J Sip Statik, 1:60-64.

Wijaya G, Marsiano F, Limanto S. 2012. Studi kasus penjadwalan proyek pada proyek rumah toko x menggunakan microsoft project 2010. J Tek Sip.

Yanuarini E. 2011. Aplikasi Program Bantu Tekla Stuctures 15 Untuk Perancangan Gedung Graha Nusantara Menggunakan Sistem Pracetak. [Skripsi]. Surabaya (ID): Institut Teknologi Sepuluh November.

33

33

Lampiran 1 Kurva S Proyek Pembangunan Pabrik Astra Honda Motor pada Tahun 2014 Sumber: PT Adhi Karya

KOREKSI BOBOT U R A I A N KONTRAK RENCANA

( % ) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41

BAB I. PEKERJAAN PERSIAPAN 3.495 3.495 0.0653 0.1443 0.0722 0.1286 0.1418 0.0773 0.0773 0.0494 0.0794 0.1048 0.1087 0.0797 0.0860 0.0877 0.0890 0.0891 0.0940 0.0987 0.0989 0.0476 0.0476 0.1010 0.0964 0.0880 0.1058 0.0978 0.0937 0.0832 0.1045 0.0954 0.0925 0.0881 0.0291 0.0291 - 0.0524 0.0419 0.1341 0.1093 0.0944 0.0909

BAB I. SUB TOTAL BOBOT : 3.495 3.495 0.065 0.144 0.072 0.129 0.142 0.077 0.077 0.049 0.079 0.105 0.109 0.080 0.086 0.088 0.089 0.089 0.094 0.099 0.099 0.048 0.048 0.101 0.096 0.088 0.106 0.098 0.094 0.083 0.105 0.095 0.092 0.088 0.029 0.029 - 0.052 0.042 0.134 0.109 0.094 0.091

BAB II. PEMBANGUNAN GEDUNG UTAMA ( WARE HOUSE ) II.1 PEKERJAAN STRUKTUR

A. PEKERJAAN TANAH URUG 0.478 0.478 0.0101 0.0223 0.0118 0.0210 0.0231 0.0126 0.0126 0.0117 0.0188 0.0248 0.0257 0.0406 0.0437 0.0447 0.0453 0.0256 0.0270 0.0283 0.0284 - - - -

-B. PEKERJAAN SUB STRUKTUR 16.123 16.123 0.0495 0.1094 0.4101 0.7307 0.8052 0.4389 0.4389 0.6134 0.9855 1.3011 1.3484 1.2230 1.3193 1.3465 1.3655 0.8514 0.8984 0.9430 0.9449 - - - -

-C. PEKERJAAN UPPER STRUKTUR C.1 Lantai 1 ( Satu ) 6.436 6.436 - - 0.1673 0.2687 0.3548 0.3677 0.3745 0.4040 0.4123 0.4181 0.3766 0.3974 0.4171 0.4179 0.2578 0.2578 0.5463 0.5216 0.4760 - - -

-C.2 Lantai Mezanine 10.694 10.694 - - 0.2608 0.4190 0.5531 0.5732 0.6223 0.6713 0.6851 0.6948 0.6257 0.6603 0.6931 0.6945 0.4433 0.4433 0.9393 0.8967 0.8184 - - -

-C.3 Lantai 2 ( Dua ) 16.749 16.749 - - 0.4353 0.6994 0.9233 0.9569 0.9747 1.0514 1.0730 1.0882 0.9800 1.0341 1.0855 1.0877 0.6709 0.6709 1.4217 1.3573 1.2388 - - -

-C.4 Lantai Atap & Dak Tangga, Lift 2.797 2.797 - - 0.0565 0.0908 0.1199 0.1243 0.1302 0.1405 0.1434 0.1454 0.1309 0.1382 0.1450 0.1453 0.0700 0.0700 0.1484 0.1417 0.1293 0.2022 0.1869 0.1791 0.1590 - -

-D. PEKERJAAN STRUKTUR TANGGA 0.458 0.458 - - - - - 0.0201 0.0201 0.0425 0.0406 0.0370 0.0446 0.0412 0.0395 0.0350 0.0377 0.0344 0.0334 0.0318 -

- - - - - - - - - - -

-E. PEKERJAAN STRUKTUR ATAP BAJA 11.851 11.851 - - - - - - - 0.6860 0.7239 0.7598 0.7613 0.3662 0.3662 0.7759 0.7408 0.6761 1.6252 1.5019 1.4392 1.2778 0.0415 0.0379 0.0367 0.0350 - - - -

-II.2 PEKERJAAN ARSITEKTUR II.2.1 LANTAI 1 ( SATU ) A. PEKERJAAN DINDING 0.745 0.745 - - - 0.0762 0.0822 0.0839 0.0851 0.0789 0.0833 0.0874 0.0876 0.0101 0.0101 0.0215 0.0205 0.0187 - - -

-B. PEK. KUSEN, PINTU / JENDELA TERMASUK FINISHING DAN ACCESSORIES 1.194 1.194 - - - 0.0278 0.0300 0.0306 0.0310 0.0335 0.0354 0.0371 0.0372 0.0224 0.0224 0.0475 0.0454 0.0414 0.0664 0.0614 0.0588 0.0522 0.1410 0.1287 0.1248 0.1189 -

-C. PEKERJAAN LANGIT-LANGIT 0.162 0.162 - - - 0.0038 0.0041 0.0041 0.0042 0.0045 0.0048 0.0050 0.0050 0.0030 0.0030 0.0064 0.0061 0.0056 0.0090 0.0083 0.0080 0.0071 0.0191 0.0174 0.0169 0.0161 -

-D. PEKERJAAN FINISHING LANTAI & DINDING 2.413 2.413 - - - 0.0562 0.0606 0.0618 0.0627 0.0678 0.0715 0.0751 0.0752 0.0453 0.0453 0.0960 0.0917 0.0837 0.1342 0.1240 0.1189 0.1055 0.2850 0.2602 0.2522 0.2403 -

-E. PEKERJAAN SANITAIR 0.011 0.011 - - - 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0002 0.0002 0.0004 0.0004 0.0004 0.0006 0.0006 0.0005 0.0005 0.0013 0.0012 0.0011 0.0011 -

-F. PEKERJAAN PENGECATAN 0.338 0.338 - - - 0.0079 0.0085 0.0087 0.0088 0.0095 0.0100 0.0105 0.0105 0.0063 0.0063 0.0134 0.0128 0.0117 0.0188 0.0174 0.0166 0.0148 0.0399 0.0364 0.0353 0.0336 -

-II.2.2 LANTAI MEZANINE A. PEKERJAAN DINDING 0.405 0.405 - - - 0.0094 0.0102 0.0104 0.0105 0.0114 0.0120 0.0126 0.0126 0.0076 0.0076 0.0161 0.0154 0.0140 0.0225 0.0208 0.0199 0.0177 0.0478 0.0437 0.0423 0.0403 -

-B. 0.150 0.150 - - - 0.0035 0.0038 0.0039 0.0039 0.0042 0.0045 0.0047 0.0047 0.0028 0.0028 0.0060 0.0057 0.0052 0.0084 0.0077 0.0074 0.0066 0.0178 0.0162 0.0157 0.0150 -

-C. PEKERJAAN LANGIT-LANGIT 0.303 0.303 - - - 0.0071 0.0076 0.0078 0.0079 0.0085 0.0090 0.0094 0.0095 0.0057 0.0057 0.0121 0.0115 0.0105 0.0169 0.0156 0.0149 0.0133 0.0358 0.0327 0.0317 0.0302 -

-D. PEKERJAAN FINISHING LANTAI & DINDING 1.226 1.226 - - - 0.0285 0.0308 0.0314 0.0319 0.0344 0.0363 0.0381 0.0382 0.0230 0.0230 0.0488 0.0466 0.0425 0.0682 0.0630 0.0604 0.0536 0.1448 0.1322 0.1282 0.1221 -

-E. PEKERJAAN SANITAIR 0.011 0.011 - - - 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0002 0.0002 0.0004 0.0004 0.0004 0.0006 0.0006 0.0005 0.0005 0.0013 0.0012 0.0011 0.0011 -

-F. PEKERJAAN PENGECATAN 0.296 0.296 - - - 0.0069 0.0074 0.0076 0.0077 0.0083 0.0088 0.0092 0.0092 0.0056 0.0056 0.0118 0.0113 0.0103 0.0165 0.0152 0.0146 0.0130 0.0350 0.0320 0.0310 0.0295 -

-II.2.3 LANTAI 2 ( DUA ) A. PEKERJAAN DINDING 0.877 0.877 - - - 0.0204 0.0220 0.0225 0.0228 0.0246 0.0260 0.0273 0.0273 0.0165 0.0165 0.0349 0.0333 0.0304 0.0488 0.0451 0.0432 0.0384 0.1036 0.0946 0.0916 0.0873 -

-B. PEK. KUSEN, PINTU / JENDELA TERMASUK FINISHING DAN ACCESSORIES 0.417 0.417 - - - 0.0097 0.0105 0.0107 0.0108 0.0117 0.0124 0.0130 0.0130 0.0078 0.0078 0.0166 0.0159 0.0145 0.0232 0.0215 0.0206 0.0183 0.0493 0.0450 0.0436 0.0416 -

-C. PEKERJAAN LANGIT-LANGIT 0.044 0.044 - - - 0.0010 0.0011 0.0011 0.0011 0.0012 0.0013 0.0014 0.0014 0.0008 0.0008 0.0018 0.0017 0.0015 0.0025 0.0023 0.0022 0.0019 0.0052 0.0048 0.0046 0.0044 -

-D. PEKERJAAN FINISHING LANTAI & DINDING 1.788 1.788 - - - 0.0416 0.0449 0.0458 0.0465 0.0502 0.0530 0.0556 0.0557 0.0336 0.0336 0.0712 0.0679 0.0620 0.0995 0.0919 0.0881 0.0782 0.2112 0.1928 0.1869 0.1781 -

-E. PEKERJAAN PENGECATAN 0.258 0.258 - - - 0.0060 0.0065 0.0066 0.0067 0.0072 0.0076 0.0080 0.0080 0.0048 0.0048 0.0102 0.0098 0.0089 0.0143 0.0132 0.0127 0.0113 0.0304 0.0278 0.0269 0.0256 -

-II.2.4 ATAP A. PEKERJAAN DINDING 0.254 0.254 - - - 0.0059 0.0064 0.0065 0.0066 0.0071 0.0075 0.0079 0.0079 0.0048 0.0048 0.0101 0.0097 0.0088 0.0141 0.0131 0.0125 0.0111 0.0300 0.0274 0.0266 0.0253 -

-B. 2.330 2.330 - - - 0.0542 0.0585 0.0597 0.0606 0.0654 0.0691 0.0725 0.0726 0.0438 0.0438 0.0927 0.0885 0.0808 0.1296 0.1198 0.1148 0.1019 0.2752 0.2512 0.2435 0.2320 -

-C. PEKERJAAN PENGECATAN 0.026 0.026 - - - 0.0006 0.0006 0.0007 0.0007 0.0007 0.0008 0.0008 0.0008 0.0005 0.0005 0.0010 0.0010 0.0009 0.0014 0.0013 0.0013 0.0011 0.0031 0.0028 0.0027 0.0026 -

-D. PEKERJAAN PENUTUP ATAP 5.756 5.756 - - - - - - - - - - - 0.1369 0.1369 0.2901 0.2770 0.2528 0.4802 0.4438 0.4253 0.3776 0.8064 0.7361 0.7135 0.6798 -

-BAB II. SUB TOTAL BOBOT : 84.594 84.594 0.060 0.132 0.422 0.752 0.828 0.452 0.452 1.545 2.482 3.277 3.396 3.733 4.026 4.109 4.167 4.106 4.333 4.548 4.557 2.210 2.210 4.683 4.471 4.081 3.048 2.816 2.699 2.396 2.363 2.157 2.090 1.992 - - - - -

-BAB III. PEMBANGUNAN GEDUNG OFFICE III.1. PEKERJAAN STRUKTUR A. PEKERJAAN TANAH & URUGAN 0.022 0.022 - - - - 0.0051 0.0054 0.0057 0.0057 - - - -

-B. PEKERJAAN SUB STRUKTUR 0.989 0.989 - - - 0.0013 0.0014 0.0014 0.0015 0.0630 0.0665 0.0698 0.0699 0.0616 0.0616 0.1304 0.1245 0.1137 0.0619 0.0572 0.0548 0.0487 - -

-C. PEKERJAAN UPPER STRUKTUR 0.441 0.441 - - - - - - 0.1225 0.1132 0.1085 0.0963 - - - - -

-D. PEKERJAAN BAJA ENTRACE 0.085 0.085 - - - - - - 0.0851 - - - - -

-III.2 PEKERJAAN FINISHING ARSITEKTUR A. PEKERJAAN DINDING 0.464 0.464 - - - - - 0.0230 0.0230 0.0488 0.0466 0.0425 0.0755 0.0698 0.0669 0.0594 0.0022 0.0020 0.0019 0.0018 -

-B. 0.411 0.411 - - - - - - 0.0378 0.0349 0.0334 0.0297 0.0373 0.0340 0.0330 0.0314 0.0267 0.0267 - 0.0481 0.0384

-C. PEKERJAAN DINDING PARTISI 0.164 0.164 - - - - - - 0.0151 0.0139 0.0134 0.0119 0.0149 0.0136 0.0132 0.0126 0.0107 0.0107 - 0.0192 0.0154

-D. PEKERJAAN LANGIT-LANGIT 0.120 0.120 - - - - - - 0.0110 0.0102 0.0097 0.0086 0.0109 0.0099 0.0096 0.0092 0.0078 0.0078 - 0.0140 0.0112

-E. PEKERJAAN FINISHING LANTAI & DINDING 0.275 0.275 - - - - - - 0.0252 0.0233 0.0223 0.0198 0.0249 0.0227 0.0220 0.0210 0.0178 0.0178 - 0.0321 0.0257

-F. PEKERJAAN SANITAIR 0.090 0.090 - - - - - - 0.0083 0.0077 0.0073 0.0065 0.0082 0.0075 0.0073 0.0069 0.0059 0.0059 - 0.0106 0.0084

-G. PEKERJAAN PENGECATAN 0.073 0.073 - - - - - - 0.0067 0.0062 0.0059 0.0053 0.0066 0.0060 0.0058 0.0056 0.0047 0.0047 - 0.0085 0.0068

-H. PEKERJAAN ATAP 0.671 0.671 - - - - - - 0.0616 0.0569 0.0545 0.0484 0.0608 0.0555 0.0538 0.0513 0.0435 0.0435 - 0.0784 0.0627

-BAB III. SUB TOTAL BOBOT : 3.805 3.805 - - - - 0.001 0.001 0.001 0.001 0.068 0.072 0.075 0.076 0.085 0.085 0.179 0.171 0.156 0.426 0.393 0.377 0.420 0.166 0.151 0.147 0.140 0.117 0.117 - 0.211 0.169

BAB IV. SARANA BANGUNAN PENUNJANG IV.1 MASJID IV.1.1 PEKERJAAN STRUKTUR 0.131 0.131 - - - - - 0.0003 0.0003 0.0006 0.0006 0.0005 0.0118 0.0109 0.0104 0.0093 0.0116 0.0106 0.0103 0.0098 0.0083 0.0083 - 0.0150 0.0120

-IV.1.2 PEKERJAAN FINISHING ARSITEKTUR 0.224 0.224 - - - - - - 0.0090 0.0083 0.0080 0.0071 0.0174 0.0159 0.0154 0.0147 0.0121 0.0121 - 0.0218 0.0174 0.0204 0.0166 0.0144 0.0138 IV.2 TOILET & TEMPAT WUDHU IV.2.1 PEKERJAAN STRUKTUR 0.044 0.044 - - - - - 0.0002 0.0002 0.0005 0.0005 0.0004 0.0059 0.0054 0.0052 0.0046 0.0058 0.0053 0.0051 0.0049 -

-IV.2.2 PEKERJAAN FINISHING ARSITEKTUR 0.043 0.043 - - - - - - 0.0047 0.0043 0.0041 0.0037 0.0036 0.0033 0.0032 0.0030 0.0131

-IV.4 GROUND WATER TANK & RUMAH POMPA IV.4.1 PEKERJAAN STRUKTUR 0.433 0.433 - - - - - - 0.0436 0.0403 0.0386 0.0343 0.0374 0.0342 0.0331 0.0316 0.0268 0.0268 - 0.0482 0.0386

-IV.4.2 PEKERJAAN FINISHING ARSITEKTUR 0.091 0.091 - - - - - - - 0.0125 0.0114 0.0110 0.0105 0.0087 0.0087 - 0.0156 0.0125

-IV.5 POWER HOUSE IV.5.1 PEKERJAAN STRUKTUR 0.304 0.304 - - - - - - 0.0423 0.0391 0.0374 0.0332 0.0417 0.0381 0.0369 0.0352 -

-IV.5.2 PEKERJAAN FINISHING ARSITEKTUR 0.103 0.103 - - - - - - - 0.0141 0.0129 0.0125 0.0119 0.0098 0.0098 - 0.0177 0.0141

-IV.6 POS JAGA IV.6.1 POS JAGA TIPE 1 ( 2 Unit ) 0.038 0.038 - - - 0.0044 0.0048 0.0049 0.0049 0.0045 0.0047 0.0049 0.0049 - - - -

-IV.6.2 POS JAGA TIPE 2 ( 1 Unit ) 0.060 0.060 - - - 0.0070 0.0075 0.0077 0.0078 0.0070 0.0074 0.0077 0.0078 - - - -

-IV.7. RUANG KOMPRESOR 0.040 0.040 - - - - - - - - 0.0076 0.0076 - 0.0137 0.0110

-BAB IV. SUB TOTAL BOBOT : 1.511 1.511 - - - - 0.011 0.012 0.013 0.013 0.011 0.012 0.013 0.013 0.001 0.001 0.001 0.001 0.001 0.117 0.108 0.104 0.092 0.144 0.132 0.128 0.122 0.073 0.073 - 0.132 0.119 0.020 0.017 0.014 0.014 BAB V. SARANA LUAR V.1 PEKERJAAN LANSEKAP V.1.1 PEKERJAAN PAGAR A. PAGAR PEMBATAS SITE TIPE 1 ( PAGAR BRC + KAWAT DURI ) 0.274 0.274 - - - - - 0.0086 0.0086 0.0182 0.0174 0.0158 0.0191 0.0176 0.0169 0.0150 0.0188 0.0172 0.0167 0.0159 0.0131 0.0131 - 0.0235 0.0188

-B. PAGAR PEMBATAS SITE TIPE 2 ( PAGAR BRC ) 0.319 0.319 - - - - - 0.0100 0.0100 0.0211 0.0202 0.0184 0.0222 0.0205 0.0196 0.0174 0.0219 0.0200 0.0194 0.0184 0.0152 0.0152 - 0.0274 0.0219

-C. PAGAR TIPE 3 ( PAGAR PANEL PRECAST ) TINGGI 2.4m 0.635 0.635 - - - - - 0.0199 0.0199 0.0421 0.0402 0.0367 0.0442 0.0408 0.0391 0.0347 0.0436 0.0398 0.0386 0.0368 0.0303 0.0303 - 0.0546 0.0436

-V.1.2 PEKERJAAN KANOPI PARKIR A. AREA PARKIR 1 ( KANOPI MOTOR ) 0.531 0.531 - - - - - 0.0166 0.0166 0.0352 0.0336 0.0307 0.0369 0.0341 0.0327 0.0290 0.0364 0.0333 0.0322 0.0307 0.0253 0.0253 - 0.0456 0.0364

-C. AREA PARKIR 3 ( KANOPI MOBIL ) 0.278 0.278 - - - - - 0.0087 0.0087 0.0185 0.0176 0.0161 0.0194 0.0179 0.0171 0.0152 0.0191 0.0175 0.0169 0.0161 0.0133 0.0133 - 0.0239 0.0191

-V.1.3 PEKERJAAN SELASAR PENGHUBUNG 0.494 0.494 - - - - - 0.0154 0.0154 0.0327 0.0313 0.0285 0.0343 0.0317 0.0304 0.0270 0.0339 0.0309 0.0300 0.0286 0.0236 0.0236 - 0.0424 0.0339

-V.1.4 PEKERJAAN JALAN & TEMPAT PARKIR / PERKERASAN A. JALAN KELAS A ( MUATAN BERAT ) 0.054 0.054 - - - - - 0.0017 0.0017 0.0036 0.0034 0.0031 0.0037 0.0034 0.0033 0.0029 0.0037 0.0034 0.0033 0.0031 0.0026 0.0026 - 0.0046 0.0037

-B. JALAN KELAS C ( MUATAN RINGAN ) 0.777 0.777 - - - - - 0.0243 0.0243 0.0516 0.0492 0.0449 0.0540 0.0499 0.0479 0.0425 0.0534 0.0487 0.0472 0.0450 0.0371 0.0371 - 0.0668 0.0534

-C. AREA TEMPAT PARKIR 0.748 0.748 - - - - - 0.0234 0.0234 0.0496 0.0474 0.0432 0.0520 0.0481 0.0461 0.0409 0.0514 0.0469 0.0455 0.0433 0.0357 0.0357 - 0.0643 0.0514

-D. PERKERASAN PAVING BLOCK 0.239 0.239 - - - - - 0.0075 0.0075 0.0158 0.0151 0.0138 0.0166 0.0153 0.0147 0.0131 0.0164 0.0150 0.0145 0.0138 0.0114 0.0114 - 0.0205 0.0164

-V.1.5 PEKERJAAN PENGHIJAUAN 0.103 0.103 - - - - - - 0.0071 0.0066 0.0063 0.0056 0.0071 0.0064 0.0062 0.0060 0.0049 0.0049 - 0.0088 0.0071 0.0080 0.0066 0.0057 0.0055

V.2 PEKERJAAN DRAINASE 2.144 2.144 - 0.0559 0.0997 0.1099 0.0599 0.0599 0.0556 0.0894 0.1180 0.1223 - - - 0.0955 0.0883 0.0846 0.0751 0.0943 0.0861 0.0835 0.0795 0.0656 0.0656 - 0.1180 0.0944 0.1074 0.0875 0.0756 0.0729

BAB V. SUB TOTAL BOBOT : 6.596 6.596 - 0.056 0.100 0.110 0.060 0.060 0.056 0.089 0.118 0.122 - - 0.136 0.136 0.288 0.275 0.251 0.405 0.374 0.359 0.318 0.400 0.365 0.354 0.337 0.278 0.278 - 0.500 0.400 0.115 0.094 0.081 0.078

JUMLAH BOBOT TOTAL : 100.000 100.000 0.125 0.276 0.550 0.980 1.080 0.589 0.589 1.650 2.651 3.500 3.627 3.825 4.126 4.211 4.271 4.275 4.511 4.735 4.744 2.479 2.479 5.253 5.015 4.577 4.101 3.790 3.632 3.310 3.177 2.900 2.811 2.678 0.498 0.498 - 0.896 0.729 0.270 0.220 0.190 0.183

A. RENCANA BOBOT MINGGUAN KONTRAK AWAL 100.000 0.125 0.276 0.550 0.980 1.080 0.589 0.589 1.650 2.651 3.500 3.627 3.825 4.126 4.211 4.271 4.275 4.511 4.735 4.744 2.479 2.479 5.253 5.015 4.577 4.101 3.790 3.632 3.310 3.177 2.900 2.811 2.678 0.498 0.498 - 0.896 0.729 0.270 0.220 0.190 0.183 B. RENCANA KOMULATIF BOBOT MINGGUAN 0.125 0.401 0.951 1.931 3.011 3.600 4.189 5.839 8.490 11.990 15.617 19.442 23.568 27.779 32.049 36.324 40.835 45.570 50.315 52.794 55.273 60.526 65.541 70.118 74.219 78.009 81.641 84.951 88.128 91.028 93.839 96.518 97.015 97.513 97.513 98.408 99.137 99.407 99.627 99.817 100.000 C. BULANAN 0.401 3.788 11.428 16.433 18.265 19.803 14.833 11.566 2.620 0.863

D. KOMULATIF BULANAN 0.401 4.189 15.617 32.049 50.315 70.118 84.951 96.518 99.137 100.000

E. REALISASI BOBOT MINGGUAN 0.152 0.120 0.084 0.287 1.050 0.582 1.457 1.648 2.194 2.018 3.192 2.585 2.823 2.250 4.124 3.206 2.734 2.564 3.645 2.570 3.048 2.832 2.643 5.856 3.346 F. REALISASI KOMULATIF BOBOT MINGGUAN 0.152 0.272 0.356 0.643 1.692 2.274 3.731 5.379 7.573 9.591 12.783 15.368 18.191 20.441 24.565 27.771 30.505 33.069 36.714 39.284 42.332 45.163 47.807 53.663 57.009 G. DEVIASI ( F - B ) 0.027 (0.129) (0.595) (1.288) (1.319) (1.326) (0.458) (0.460) (0.917) (2.399) (2.834) (4.074) (5.377) (7.338) (7.484) (8.553) (10.331) (12.502) (13.601) (13.510) (12.941) (15.362) (17.734) (16.455) (17.211)

Sumber : PT Adhi Karya, Tbk

Lampiran 1 Kurva S Proyek pembangunan pabrik Astra Honda Motor pada Tahun 2014

33

9

JULI

PEK. KUSEN, PINTU / JENDELA TERMASUK FINISHING DAN ACCESSORIES

PEK. KUSEN, PINTU / JENDELA TERMASUK FINISHING DAN ACCESSORIES

MEI JUNI

PEK. KUSEN, PINTU / JENDELA TERMASUK FINISHING DAN ACCESSORIES

JANUARI FEBRUARI MARET

6

APRIL MATA

PEMBAYA RAN

BOBOT 1 TAHUN 2014 2 3 4 5 TAHUN 2015

AGUSTUS 10 7 8 NOVEMBER DESEMBER

LIBUR I

DUL FITRI 2015

34

Lampiran 2 Kurva S yang telah di update pada ProyekPembangunan Pabrik Astra Honda Motor pada Tahun 2015 Sumber: PT Adhi Karya

U R A I A N KONTRAK

( % ) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

BAB I. PEKERJAAN PERSIAPAN 3.495 0.0653 0.0664 0.0218 0.0596 0.0368 - 0.0617 0.2428 0.0400 0.0880 0.2459 0.0696 0.0696 0.0696 0.0696 0.0696 0.1647 0.0752 0.0752 0.0885 0.0752 0.0752 0.0752 0.0752 0.0606 0.0574 0.0454 0.0482 0.0427 0.0413 0.0468 0.0441 0.0413 0.0413 - - 0.0413 0.0689 0.0826 0.0964 0.0964 0.0964 0.0964 0.0916 0.0888 0.0574 0.0574 0.0574 0.0574 0.0574

BAB I. SUB TOTAL BOBOT : 3.495 0.065 0.066 0.022 0.060 0.037 - 0.062 0.243 0.040 0.088 0.246 0.070 0.070 0.070 0.070 0.070 0.165 0.075 0.075 0.089 0.075 0.075 0.075 0.075 0.061 0.057 0.045 0.048 0.043 0.041 0.047 0.044 0.041 0.041 - - 0.041 0.069 0.083 0.096 0.096 0.096 0.096 0.092 0.089 0.057 0.057 0.057 0.057 0.057

BAB II. PEMBANGUNAN GEDUNG UTAMA ( WARE HOUSE ) II.1 PEKERJAAN STRUKTUR

A. PEKERJAAN TANAH URUG 0.478 0.0236 0.0223 0.0555 0.0253 0.0302 0.0510 0.0255 0.0138 0.0469 0.0839 0.0011 0.0223 0.0304 0.0324 - 0.0129 - - - - - 0.0011 - - - - -

-B. PEKERJAAN SUB STRUKTUR 16.123 0.0630 0.0315 0.0064 0.1375 0.9472 0.2459 0.8568 1.1880 1.9223 1.7670 2.0116 2.1705 1.6508 1.3047 0.9276 0.4847 0.1604 0.1299 0.0772 0.0357 0.0024 0.0001 0.0014 0.0007 - - -

-C. PEKERJAAN UPPER STRUKTUR

-C.1 Lantai 1 ( Satu ) 6.436 - 0.3179 0.5655 0.2015 0.1849 0.0718 0.8613 0.3033 1.0605 0.0926 0.8511 0.8981 0.2409 0.2564 0.0487 0.1669 0.0672 0.0574 0.0676 0.0092 0.0413 0.0366 0.0354 - -

-C.2 Lantai Mezanine 10.694 - - - - 0.0060 0.5887 1.9765 1.3645 1.0689 0.5943 1.7204 0.4459 0.9697 0.6153 0.9205 0.4044 0.0034 0.0032 0.0026 0.0027 0.0024 0.0023 0.0026 - -

-C.3 Lantai 2 ( Dua ) 16.749 - - - 0.8719 1.5083 1.5806 1.6602 1.8164 1.7184 1.1124 3.8173 0.3773 0.3573 0.2830 0.3001 0.2658 0.2572 0.2915 0.2744 0.2572 -

-C.4 Lantai Atap & Dak Tangga, Lift 2.797 - - - 0.3318 0.5245 0.2507 0.2374 0.1880 0.1994 0.1766 0.1709 0.1937 0.1823 0.1709 0.1709 -

-D. PEKERJAAN STRUKTUR TANGGA 0.458 - - - 0.0591 0.0560 0.0444 0.0470 0.0417 0.0403 0.0457 0.0430 0.0403 0.0403 - -

-E. PEKERJAAN STRUKTUR ATAP BAJA 11.851 - - - 0.6337 0.5535 0.5242 0.4152 0.4403 0.3900 0.3774 0.4277 0.4026 0.3774 0.3774 - - 0.3774 0.6290 0.7548 0.8806 0.8806 0.8806 0.8806 0.8366 0.8114 II.2 PEKERJAAN ARSITEKTUR II.2.1 LANTAI 1 ( SATU ) A. PEKERJAAN DINDING 0.745 - - - - 0.0193 0.0536 0.0409 0.0125 0.0476 0.0279 0.0265 0.0210 0.0222 0.0197 0.0191 0.0216 0.0203 0.0191 0.0191 - 0.0191 0.0318 - 0.0445 0.0445 0.0422 0.0410 0.0265 0.0265 0.0265 0.0265 0.0265 B. PEK. KUSEN, PINTU / JENDELA TERMASUK FINISHING DAN ACCESSORIES 1.194 - - - - 0.0997 0.1058 0.0937 0.0907 0.1028 0.0967 0.0907 0.0907 - - 0.0907 0.1511 0.1813

-C. PEKERJAAN LANGIT-LANGIT 0.162 - - - - 0.0176 0.0134 0.0073 0.0112 0.0220 0.0072 0.0068 0.0054 0.0057 0.0051 0.0049 0.0056 0.0052 0.0049 0.0049 - 0.0049 0.0082 0.0098 0.0115

-D. PEKERJAAN FINISHING LANTAI & DINDING 2.413 - - - - 0.0952 0.0754 0.0800 0.0708 0.0686 0.0777 0.0731 0.0686 0.0686 - 0.0686 0.1143 0.1371 0.1600 0.1600 0.1600 0.1600 0.1520 0.1474 0.0952 0.0952 0.0952 0.0952 0.0952 E. PEKERJAAN SANITAIR 0.011 - - - - 0.0010 0.0010 - 0.0010 0.0016 0.0019 0.0023 0.0023 F. PEKERJAAN PENGECATAN 0.338 - - - - 0.0111 0.0125 0.0118 0.0111 0.0111 - - 0.0111 0.0184 0.0221 0.0258 0.0258 0.0258 0.0258 0.0245 0.0238 0.0154 0.0154 0.0154 0.0154 0.0154 II.2.2 LANTAI MEZANINE A. PEKERJAAN DINDING 0.405 - - - - 0.0159 0.0165 0.0171 0.0162 0.0128 0.0136 0.0120 0.0116 0.0132 0.0124 0.0116 0.0116 - 0.0116 0.0194 0.0233 - 0.0272 0.0272 0.0258 0.0250 0.0162 0.0162 0.0162 0.0162 0.0162 B. 0.150 - - - - 0.0122 0.0108 0.0104 0.0118 0.0111 0.0104 0.0104 - - 0.0104 0.0174 0.0209 0.0244

-C. PEKERJAAN LANGIT-LANGIT 0.303 - - - - 0.0215 0.0204 0.0161 0.0171 0.0152 0.0147 0.0166 0.0156 0.0147 0.0147 - 0.0147 0.0244 0.0293 0.0342 0.0342 D. PEKERJAAN FINISHING LANTAI & DINDING 1.226 - - - - 0.0399 0.0423 0.0375 0.0363 0.0411 0.0387 0.0363 0.0363 - - 0.0363 0.0605 0.0725 0.0846 0.0846 0.0846 0.0846 0.0804 0.0780 0.0504 0.0504 0.0504 0.0504 0.0504 E. PEKERJAAN SANITAIR 0.011 - - - - 0.0010 0.0010 - 0.0010 0.0016 0.0019 0.0023 0.0023 F. PEKERJAAN PENGECATAN 0.296 - - - - 0.0114 0.0107 0.0100 0.0100 - - 0.0100 0.0167 0.0201 0.0234 0.0234 0.0234 0.0234 0.0223 0.0216 0.0140 0.0140 0.0140 0.0140 0.0140 II.2.3 LANTAI 2 ( DUA ) A. PEKERJAAN DINDING 0.877 - - - - 0.0346 0.0274 0.0291 0.0257 0.0249 0.0282 0.0266 0.0249 0.0249 - - 0.0249 0.0415 0.0498 0.0581 0.0581 0.0581 0.0581 0.0552 0.0536 0.0346 0.0346 0.0346 0.0346 0.0346 B. PEK. KUSEN, PINTU / JENDELA TERMASUK FINISHING DAN ACCESSORIES 0.417 - - - - 0.0175 0.0170 0.0192 0.0181 0.0170 0.0170 - - 0.0170 0.0283 0.0339 0.0396 0.0396 0.0396 0.0396 0.0376 0.0365 C. PEKERJAAN LANGIT-LANGIT 0.044 - - - - 0.0014 0.0014 0.0016 0.0015 0.0014 0.0014 - - 0.0014 0.0023 0.0028 0.0033 0.0033 0.0033 0.0033 0.0031 0.0030 0.0019 0.0019 0.0019 0.0019 0.0019 D. PEKERJAAN FINISHING LANTAI & DINDING 1.788 - - - - 0.0913 0.0884 0.1002 0.0943 0.0884 0.0884 - - 0.0884 0.1473 0.1768 0.2062 0.2062 0.2062 0.2062 E. PEKERJAAN PENGECATAN 0.258 - - - - 0.0097 0.0091 0.0091 - - 0.0091 0.0151 0.0182 0.0212 0.0212 0.0212 0.0212 0.0201 0.0195 0.0126 0.0126 0.0126 0.0126 0.0126 II.2.4 ATAP

-A. PEKERJAAN DINDING 0.254 - - - - 0.0092 0.0104 0.0098 0.0092 0.0092 - - 0.0092 0.0153 0.0183 0.0214 0.0214 0.0214 0.0214 0.0203 0.0197 0.0127 0.0127 0.0127 B. 2.330 - - - - 0.0876 0.0821 0.0821 - - 0.0821 0.1369 0.1642 0.1916 0.1916 0.1916 0.1916 0.1820 0.1765 0.1140 0.1140 0.1140 0.1140 0.1140 C. PEKERJAAN PENGECATAN 0.026 - - - - - 0.0023 0.0027 0.0027 0.0027 0.0027 0.0025 0.0025 0.0016 0.0016 0.0016 0.0016 0.0016 D. PEKERJAAN PENUTUP ATAP 5.756 - - - - 0.0196 0.2349 0.2491 0.2206 0.2135 0.2420 0.2278 0.2135 0.2135 - 0.2135 0.3559 0.4271 0.4982 0.4982 0.4982 0.4982 0.4733 0.4591 BAB II. SUB TOTAL BOBOT : 84.594 0.087 0.054 0.062 0.163 0.977 0.615 1.448 1.403 2.154 1.923 2.874 2.496 2.748 2.018 3.755 2.760 2.342 2.489 3.464 2.376 2.904 2.392 2.493 5.476 1.318 1.378 1.466 1.608 1.535 1.505 1.677 1.673 1.571 1.313 - - 1.102 1.837 2.169 2.291 2.256 2.288 2.288 1.978 1.919 0.395 0.395 0.395 0.382 0.382 BAB III.PEMBANGUNAN GEDUNG OFFICE III.1. PEKERJAAN STRUKTUR A. PEKERJAAN TANAH & URUGAN 0.022 - 0.0018 0.0036 0.00179 0.0020 - 0.0023 0.0057 0.0023 0.0006 0.0017 - - -

-B. PEKERJAAN SUB STRUKTUR 0.989 - 0.0065 0.0051 0.0726 0.0166 0.0004 0.1620 0.2970 0.3754 0.0535 -

-C. PEKERJAAN UPPER STRUKTUR 0.441 - - - 0.1715 0.0887 0.0480 0.0444 0.0880 - -

D. PEKERJAAN BAJA ENTRACE 0.085 - - - 0.0425 0.0425 -

-III.2 PEKERJAAN FINISHING ARSITEKTUR A. PEKERJAAN DINDING 0.464 - - - 0.0067 0.0413 0.0852 0.0806 0.0639 0.0677 0.0600 0.0581 -

-B. 0.411 - - - 0.0664 0.0752 0.0708 0.0664 0.0664 - - 0.0664

-C. PEKERJAAN DINDING PARTISI 0.164 - - - - - 0.0235 0.0227 0.0258 0.0242 0.0227 0.0227 - - 0.0227

-D. PEKERJAAN LANGIT-LANGIT 0.120 - - - - - 0.0171 0.0166 0.0188 0.0177 0.0166 0.0166 - - 0.0166

-E. PEKERJAAN FINISHING LANTAI & DINDING 0.275 - - - - - 0.0455 0.0441 0.0500 0.0470 0.0441 0.0441 -

-F. PEKERJAAN SANITAIR 0.090 - - - - - 0.0194 0.0194 - - 0.0194 0.0323

-G. PEKERJAAN PENGECATAN 0.073 - - - - - - - 0.0070 0.0084 0.0098 0.0098 0.0098 0.0098 0.0093 0.0090 H. PEKERJAAN ATAP 0.671 - - - - - - 0.1716 0.1820 0.1612 0.1560 -

-BAB III. SUB TOTAL BOBOT : 3.805 - - - - 0.002 0.010 0.002 - 0.007 0.073 0.019 0.006 0.162 0.299 0.376 0.227 - 0.089 0.048 0.044 0.088 0.007 0.041 0.085 0.081 0.236 0.250 0.307 0.364 0.170 0.160 0.212 0.212 - - 0.125 0.039 0.008 0.010 0.010 0.010 0.010 0.009 0.009 - - - -

BAB IV.SARANA BANGUNAN PENUNJANG IV.1 MASJID IV.1.1 PEKERJAAN STRUKTUR 0.131 - - - - 0.0177 0.0579 0.0242 0.0210 0.0099

-IV.1.2 PEKERJAAN FINISHING ARSITEKTUR 0.224 - - - - - - 0.0122 0.0204 0.0244 0.0285 0.0285 0.0285 0.0285 0.0271 0.0263 IV.2 TOILET & TEMPAT WUDHU IV.2.1 PEKERJAAN STRUKTUR 0.044 - - - - - 0.0018 0.0158 0.0063 0.0059 0.0047 0.0050 0.0044

-IV.2.2 PEKERJAAN FINISHING ARSITEKTUR 0.043 - - - - - - 0.0023 0.0039 0.0047 0.0054 0.0054 0.0054 0.0054 0.0052 0.0050 IV.4 GROUND WATER TANK & RUMAH POMPA

-IV.4.1 PEKERJAAN STRUKTUR 0.433 - - - - - 0.1364 0.0534 0.0581 0.0550 0.0436 0.0462 0.0409

-IV.4.2 PEKERJAAN FINISHING ARSITEKTUR 0.091 - - - - - - 0.0150 0.0146 0.0165 0.0155 0.0146 0.0146 - -

-IV.5 POWER HOUSE IV.5.1 PEKERJAAN STRUKTUR 0.304 - - - - - 0.0965 0.1848 0.0065 0.0062 0.0049 0.0052

-IV.5.2 PEKERJAAN FINISHING ARSITEKTUR 0.103 - - - - - - - 0.0059 0.0057 0.0065 0.0061 0.0057 0.0057 - - 0.0057 0.0096 0.0115 0.0134 0.0134 0.0134 IV.6 POS JAGA IV.6.1 POS JAGA TIPE 1 ( 2 Unit ) 0.038 - - - - - 0.0042 0.0042 - - 0.0042 0.0070 0.0085 0.0099

-IV.6.2 POS JAGA TIPE 2 ( 1 Unit ) 0.060 - - - - - - 0.0051 0.0085 0.0102 0.0119 0.0119 0.0119 IV.7. RUANG KOMPRESOR 0.040 - - - - - - - 0.0033 0.0037 0.0035 0.0033 0.0033 - - 0.0033 0.0055 0.0066 0.0077

-BAB IV. SUB TOTAL BOBOT : 1.511 - - - - - - - - - - - - - - 0.018 0.058 0.024 0.233 0.023 0.264 0.071 0.067 0.053 0.056 0.066 0.024 0.027 0.025 0.028 0.028 - - 0.033 0.055 0.066 0.077 0.059 0.059 0.034 0.032 0.031 - - - - -BAB V. SARANA LUAR

V.1PEKERJAAN LANSEKAP

V.1.1 PEKERJAAN PAGAR

A. PAGAR PEMBATAS SITE TIPE 1 ( PAGAR BRC + KAWAT DURI ) 0.274 - - - - - 0.0108 0.0180 0.0217 0.0253 0.0253 0.0253 0.0253 0.0240 0.0233 0.0150 0.0150 0.0150 0.0150 0.0150

B. PAGAR PEMBATAS SITE TIPE 2 ( PAGAR BRC ) 0.319 - - - - - 0.0218 0.0262 0.0306 0.0306 0.0306 0.0306 0.0291 0.0282 0.0182 0.0182 0.0182 0.0182 0.0182

C. PAGAR TIPE 3 ( PAGAR PANEL PRECAST ) TINGGI 2.4m 0.635 - - - - - 0.0435 0.0523 0.0610 0.0610 0.0610 0.0610 0.0579 0.0562 0.0363 0.0363 0.0363 0.0363 0.0363

V.1.2 PEKERJAAN KANOPI PARKIR

A. AREA PARKIR 1 ( KANOPI MOTOR ) 0.531 - - - - - 0.0174 0.0168 0.0191 0.0179 0.0168 0.0168 - - 0.0168 0.0280 0.0336 0.0392 0.0392 0.0392 0.0392 0.0373 0.0362 0.0234 0.0234 0.0234 0.0234 0.0234

C. AREA PARKIR 3 ( KANOPI MOBIL ) 0.278 - - - - - 0.0107 0.0101 0.0094 0.0094 - - 0.0094 0.0157 0.0189 0.0220 0.0220 0.0220 0.0220 0.0209 0.0203 0.0131 0.0131 0.0131 0.0131 0.0131

V.1.3 PEKERJAAN SELASAR PENGHUBUNG 0.494 - - - - - 0.0195 0.0325 0.0390 0.0455 0.0455 0.0455 0.0455 0.0432 0.0419 0.0271 0.0271 0.0271 0.0271 0.0271

V.1.4 PEKERJAAN JALAN & TEMPAT PARKIR / PERKERASAN

A. JALAN KELAS A ( MUATAN BERAT ) 0.054 - - - - - 0.0047 0.0055 0.0055 0.0055 0.0055 0.0053 0.0051 0.0033 0.0033 0.0033 0.0033 0.0033

B. JALAN KELAS C ( MUATAN RINGAN ) 0.777 - - - - - 0.0458 0.0092 0.0356 0.0338 0.0267 0.0284 0.0251 0.0243 0.0275 0.0259 0.0243 0.0243 - - 0.0243 0.0405 0.0486 0.0567 0.0567 0.0567 0.0567 0.0539 0.0523

C. AREA TEMPAT PARKIR 0.748 - - - - - 0.0366 0.0907 0.0907 0.0907 0.0861 0.0835 0.0540 0.0540 0.0540 0.0540 0.0540

D. PERKERASAN PAVING BLOCK 0.239 - - - - - 0.0564 0.0365 0.0365 0.0365 0.0365 0.0365

V.1.5 PEKERJAAN PENGHIJAUAN 0.103 - - - - - 0.0176 0.0167 0.0162 0.0105 0.0105 0.0105 0.0105 0.0105

V.2PEKERJAAN DRAINASE 2.144 - - - - 0.1470 0.1764 0.2058 0.2058 0.2058 0.2058 0.1955 0.1896 0.1225 0.1225 0.1225 0.1225 0.1225

BAB V. SUB TOTAL BOBOT : 6.596 - - - - - - - - - - - - - - - - - 0.046 0.046 - 0.036 0.034 0.027 0.028 0.042 0.041 0.057 0.054 0.051 0.051 - - 0.081 0.347 0.421 0.492 0.582 0.582 0.600 0.570 0.609 0.360 0.360 0.360 0.360 0.360

JUMLAH BOBOT TOTAL : 100.000 0.152 0.120 0.084 0.222 1.014 0.617 1.520 1.648 2.194 2.018 3.192 2.585 2.823 2.250 4.124 3.206 2.734 2.564 3.645 2.570 3.048 2.834 2.643 5.856 1.570 1.617 1.826 1.991 1.993 1.975 1.978 1.956 1.902 1.645 - - 1.382 2.347 2.747 2.966 3.003 3.036 3.028 2.681 2.657 0.812 0.812 0.812 0.799 0.799

A. RENCANA BOBOT MINGGUAN KONTRAK AWAL 100.000 0.152 0.120 0.084 0.222 1.014 0.617 1.520 1.648 2.194 2.018 3.192 2.585 2.823 2.250 4.124 3.206 2.734 2.564 3.645 2.570 3.048 2.834 2.643 5.856 1.570 1.617 1.826 1.991 1.993 1.975 1.978 1.956 1.902 1.645 - - 1.382 2.347 2.747 2.966 3.003 3.036 3.028 2.681 2.657 0.812 0.812 0.812 0.799 0.799

B. RENCANA KOMULATIF BOBOT MINGGUAN 0.152 0.272 0.356 0.578 1.592 2.209 3.729 5.376 7.571 9.588 12.781 15.365 18.189 20.439 24.563 27.769 30.502 33.066 36.712 39.282 42.329 45.163 47.807 53.663 55.233 56.850 58.676 60.667 62.660 64.635 66.613 68.569 70.471 72.116 72.116 72.116 73.498 75.846 78.593 81.559 84.562 87.598 90.626 93.308 95.964 96.777 97.589 98.401 99.201 100.000

C. BULANAN 0.272 3.456 9.052 11.782 12.149 16.951 7.004 7.902 4.929 11.063 11.403 4.036

D. KOMULATIF BULANAN 0.272 3.729 12.781 24.563 36.712 53.663 60.667 68.569 73.498 84.562 95.964 100.000

E. REALISASI BOBOT MINGGUAN 0.152 0.120 0.084 0.222 1.014 0.617 1.520 1.648 2.194 2.018 3.192 2.585 2.823 2.250 4.124 3.206 2.734 2.564 3.645 2.570 3.048 2.834 2.643 5.856 3.346 3.038

F. REALISASI KOMULATIF BOBOT MINGGUAN 0.152 0.272 0.356 0.578 1.592 2.209 3.729 5.376 7.571 9.588 12.781 15.365 18.189 20.439 24.563 27.769 30.502 33.066 36.712 39.282 42.329 45.163 47.807 53.663 57.009 60.047

G. DEVIASI ( F - B ) - - - - - - - - - - - - - - - - - - - - - - - - 1.776 3.197

Sumber : PT Adhi Karya, Tbk

Lampiran 2 Kurva S yang telah dierbaharui pada Proyek pembangunan pabrik Astra Honda Motor pada Tahun 2015

34

MATA PEMBAYA

RAN

BOBOT TAHUN 2014 TAHUN 2015

1 2 3 4 5

OKTOBER 12

10 11

6 7 8 9

NOVEMBER DESEMBER APRIL MEI

PEK. KUSEN, PINTU / JENDELA TERMASUK FINISHING DAN ACCESSORIES

JULI AGUSTUS SEPTEMBER

PEK. KUSEN, PINTU / JENDELA TERMASUK FINISHING DAN ACCESSORIES

JUNI

JANUARI FEBRUARI MARET

PEK. KUSEN, PINTU / JENDELA TERMASUK FINISHING DAN ACCESSORIES

LIBU

R IDUL FIT

RI 20

35

Lampiran 3 Perkembangan Pembangunan Pabrik Astra Honda Motor Tahun 2015dari kurva S yang telah diperbaiki

No Bulan Bobot Rencana (%) Akumulasi (%) Bobot Realisasi (%) Akumulasi (%) Deviasi 1 November 0.272 0.272 0.272 0.272 - 2 Desember 3.457 3.729 3.457 3.729 - 3 Januari 9.052 12.781 9.052 12.781 - 4 Februari 11.782 24.563 11.782 24.563 - 5 Maret 15.149 36.712 15.149 36.715 - 6 April 16.951 53.666 16.951 53.666 - 7 Mei 3.187 56.850 3.287 60.047 3.197

36

Lampiran 4 Kinerja Waktu pada Task Manager

37

37

38

Lampiran 6 Hasil Pengolahan Jadwal Rencana Menggunakan Microsoft Project 2013

39

39

40

Lampiran 6 (Lanjutan)

41

41

42

Lampiran 6 (Lanjutan)

43

Dokumen terkait